Free IASSC Certified Lean Six Sigma Green Belt ICGB Exam Questions

Last updated: · 10 practice questions with answers and explanations

Page: 1 / 14 Total 200 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: 1.0 Define Phase

Skill tested: Select project metrics that distinguish rolled throughput yield from first-pass yield.

A loan-processing team completes three sequential stages: application review, credit verification, and final approval. The baseline study shows that 90% of applications pass review without rework, 80% of those pass credit verification without rework, and 95% of those pass final approval without rework. Management wants one measure of the probability that an application completes the entire process without rework at any stage. Which metric and baseline value should the Green Belt report?

Correct Answer: A. Rolled throughput yield of 68.4%, multiplying the stage yields.
Explanation:

Rolled throughput yield (RTY) estimates the probability of passing every process step without rework, so multiply the individual first-pass yields: 0.90 × 0.80 × 0.95 = 0.684, or 68.4%. The 90% figure in A represents the first stage only, not the end-to-end process. D mislabels a yield calculation as cycle time, which is a duration measure. C is not a valid DPU calculation: defectives or defects per unit require defect counts and units, not addition of yields.

Question 2

New Multiple answers

Topic: 2.0 Measure Phase

Skill tested: Assess whether a variable measurement system has acceptable repeatability and reproducibility.

A machining team measures shaft diameter with one micrometer. Three operators each measure ten representative shafts twice, in randomized order. The crossed gage R&R analysis attributes 28% of observed study variation to the measurement system; operator-by-part interaction is negligible, but repeatability is substantially larger than reproducibility. The customer's tolerance is unchanged, and the team must establish a reliable baseline before analyzing process capability. Which two actions are most appropriate? Select TWO.

Correct Answer: A. Investigate the micrometer, measurement method, fixturing, and reading technique as likely sources of repeatability error.; E. Standardize the measurement procedure and train operators, then repeat the study to determine whether reproducibility improves.
Explanation:

A 28% contribution from the measurement system is substantial enough to undermine a dependable capability baseline. Because repeatability dominates, inspect the instrument and the method - such as setup, contact force, fixturing, and reading technique. Standardizing the method and training operators addresses possible reproducibility effects; repeating the study then verifies the result. Negligible interaction does not establish overall adequacy, so B is not justified. D changes the process to mask measurement error, and a stability chart does not decompose gage R&R into repeatability and reproducibility.

Question 3

New Single answer

Topic: 3.0 Analyze Phase

Skill tested: Choose and interpret a one-way ANOVA for comparing three independent process means.

A distribution center compares the mean time to pick an order across three independently staffed shifts. Each shift contributes a random sample of 25 orders. The times are approximately normal within each shift, and the sample variances appear similar. The project question is whether at least one shift has a different mean pick time. The team has specified a significance level of 0.05 and does not want to run multiple pairwise tests before establishing an overall difference. Which analysis and interpretation are most appropriate?

Correct Answer: A. Use a one-way ANOVA; if its p-value is below 0.05, conclude that at least one population mean differs, then use suitable follow-up comparisons.
Explanation:

One-way ANOVA is the appropriate overall test for comparing means across three independent groups when normality and equal-variance assumptions are reasonably supported. A significant overall result indicates evidence that not all population means are equal, but does not by itself identify which shifts differ; suitable post-hoc comparisons can follow. A inflates the familywise Type I error if unadjusted pairwise tests are used. Mann-Whitney is a two-group rank test, and chi-square is not appropriate for comparing a continuous time response.

Question 4

New Single answer

Topic: 4.0 Improve Phase

Skill tested: Interpret regression residual patterns before using a fitted relationship for process improvement.

A packaging engineer models seal strength as a linear function of jaw temperature using production data. The fitted line has a high R-squared, but a plot of residuals against fitted values shows a clear widening funnel as predicted seal strength increases. A second plot shows no obvious curvature, and residuals are centered near zero. The team wants to use the model to set a temperature target and predict seal strength across the full operating range. What is the best next step?

Correct Answer: C. Investigate a response transformation or an appropriate model for nonconstant variance, then reassess residuals before prediction.
Explanation:

The funnel-shaped residual spread indicates nonconstant error variance, violating a key assumption behind ordinary least-squares inference and potentially making prediction uncertainty unreliable across the range. A transformation, such as an appropriate Box-Cox-selected transformation, or another justified model can address the variance pattern; residual diagnostics must then be repeated. High R-squared does not validate assumptions. Removing valid high-range observations biases the model, while a quadratic term addresses curvature, which the scenario does not show.

Question 5

New Multiple answers

Topic: 5.0 Control Phase

Skill tested: Select appropriate attribute control charts for defect proportions and varying inspection opportunities.

A service operation plans daily monitoring for two quality measures. For Measure 1, each day inspectors review a fixed sample of 200 completed claims and record the number containing at least one error. For Measure 2, they inspect all claims processed that day and record the total number of errors; the number of claims varies considerably by day, and a claim can contain more than one error. The data are collected in time order, and the team wants charts suited to each measure. Which two chart selections are appropriate? Select TWO.

Correct Answer: B. Use a p chart for Measure 1 to monitor the proportion of claims with an error.; D. Use a u chart for Measure 2 to monitor errors per claim with varying sample size.
Explanation:

Measure 1 is a binary defective/nondefective outcome with a fixed sample size, so a p chart can track the proportion of claims with an error. Measure 2 counts multiple defects across a varying number of inspected units, so a u chart monitors defects per unit while accounting for the changing opportunity count. An np chart is intended for the count of defectives with a constant sample size, not varying size or multiple defects per unit. A c chart is for defect counts with a constant area or opportunity, and Xbar-R charts require variable measurement data.

Question 6

New Single answer

Topic: 1.0 Define Phase

Skill tested: Use COPQ and Pareto evidence to prioritize a business-relevant improvement project.

A regional repair organization is choosing one project for the next quarter. Its Pareto analysis shows that warranty returns account for 18% of service cases but 62% of recorded failure-related cost. A separate issue causes many low-cost customer inquiries. The warranty-return problem spans several departments, and a Green Belt can lead the project with a sponsor who can secure cross-functional resources. Which project-selection decision is best supported by the available evidence?

Correct Answer: B. Select warranty returns, define a measurable baseline and target, and validate the cost assumptions with the finance owner.
Explanation:

The warranty-return issue is a strong candidate because it represents most of the recorded failure-related cost, making its potential COPQ impact substantial despite a lower case count. A charter should state measurable project boundaries and baseline/target metrics, while finance validates the benefit assumptions and capture method. A Pareto chart supports prioritization by impact, not simply frequency, so A is not warranted. Combining unrelated issues weakens project focus, and cross-functional work is not inherently inappropriate when a sponsor can provide resources.

Question 7

New Multiple answers

Topic: 2.0 Measure Phase

Skill tested: Select capability indices and stability checks appropriate for a centered normal process.

A plant must assess whether a filling process can meet a customer specification with both an upper and a lower limit. The process has been sampled in rational subgroups over several shifts, and the team has not yet established whether it is stable. The measurement system has already been judged adequate, and the individual observations appear approximately normal. The customer requires the team to report both short-term potential capability and performance relative to the observed process mean. Which two actions are appropriate before making a capability claim? Select TWO.

Correct Answer: C. Once stability is supported, report Cp for potential spread relative to specification width and Cpk for spread and centering relative to the limits.; E. Evaluate control-chart evidence for process stability over the sampling period.
Explanation:

Capability interpretation presumes a stable process; control charts should first be examined for evidence of special-cause variation. If stability is supported, Cp compares the specification width with within-process spread, while Cpk also reflects the process mean's position relative to the nearest specification limit. Calculating indices on an unstable process can produce misleading conclusions, so B is not acceptable as stated. Pp uses overall variation but does not prove stability, and DPMO is not a stability test.

Question 8

New Single answer

Topic: 3.0 Analyze Phase

Skill tested: Interpret a two-sample proportion test for independent defect-rate comparisons.

A call center pilots a revised verification script at one site and retains the current script at another comparable site. After the same observation period, the pilot has 34 defective calls among 400 audited calls, while the comparison site has 52 among 420. Audits are independent, and the project team wants to determine whether the defect proportions differ at a 5% significance level before recommending broader adoption. Which analysis and conclusion are most appropriate if the test returns a p-value of 0.03?

Correct Answer: D. Use a two-sample proportion test and conclude there is statistically significant evidence that the proportions differ; assess practical importance separately.
Explanation:

The outcome is defective or not defective, and the two independent groups have different sample sizes, making a two-sample proportion test suitable. A p-value of 0.03 is below the 0.05 significance level, so the evidence supports a difference in proportions under the test assumptions. Statistical significance alone does not establish operational or financial importance, nor does this observational comparison by itself prove causation. The samples are not paired, and neither a variance test nor a goodness-of-fit test addresses the stated comparison.

Question 9

New Multiple answers

Topic: 4.0 Improve Phase

Skill tested: Distinguish prediction intervals from confidence intervals when forecasting an individual response.

A process engineer fits a regression model relating oven temperature to the cure time of a product. Diagnostics support the fitted model over the operating range, and the team plans a confirmation run at a selected temperature. The production manager asks for both an estimate of the mean cure time at that temperature and a range likely to contain the cure time of one future product. The team must communicate uncertainty accurately rather than present the fitted value as guaranteed. Which two statements are correct? Select TWO.

Correct Answer: B. The prediction interval for one future product includes both uncertainty in the fitted mean and individual residual variation.; C. The confidence interval for the mean response quantifies uncertainty in the estimated average cure time at the selected temperature.
Explanation:

A confidence interval describes uncertainty about the mean response at the selected temperature. A prediction interval for a single future observation is wider because it incorporates uncertainty in the estimated mean as well as the product-to-product residual variation. Therefore B reverses the usual relationship. A high R-squared does not eliminate uncertainty, and a confidence interval for a mean does not guarantee that every individual unit will comply with specifications.

Question 10

New Single answer

Topic: 5.0 Control Phase

Skill tested: Design a Kanban replenishment signal that limits excess work in process.

A manufacturer is improving a stable assembly cell that consumes a standard component from a nearby supermarket. Demand is reasonably predictable, replenishment lead time is known, and current practice releases large batches based on a weekly forecast, creating excess work in process and shortages at the cell. The operation wants a visual pull signal that triggers replenishment based on actual consumption. It cannot add production capacity or rely on an electronic scheduling system. Which control is most appropriate?

Correct Answer: D. Use a Kanban card or container signal to authorize replenishment, with the number of cards set to cover demand during replenishment lead time and an appropriate buffer.
Explanation:

Kanban creates a visual pull system: consumption at the cell returns a card or container signal that authorizes replenishment. The number of signals should be sized to support demand during replenishment lead time, with a justified buffer, thereby limiting authorized inventory and work in process. A forecast-driven push schedule and larger batches preserve the current overproduction mechanism. Unrestricted inventory does not control WIP, while poka-yoke prevents mistakes rather than signaling material replenishment.