Question 1
Topic: Topic 200: Capacity Planning
Skill tested: Correlates CPU, I/O wait, and blocked-process metrics to identify a performance bottleneck.
A database host has developed intermittent response delays after a reporting workload was added. During the delays, `top` shows moderate CPU utilization but a high proportion of time in I/O wait. `vmstat 1` reports sustained blocked processes and elevated block output, while `iostat` shows high utilization and long average wait times on the logical volume's backing device. Network throughput remains low, and memory pressure is not evident. The storage team asks whether adding CPU capacity is justified. Which action is the best next step to confirm the likely bottleneck before recommending hardware changes?
The measurements point to storage latency: elevated I/O wait, blocked tasks, and high device utilization with long waits. Interval-based per-device statistics can verify whether the backing device remains saturated during the actual symptom window; correlating process I/O helps identify the workload responsible. Adding CPU does not resolve a device queue bottleneck, and I/O wait is time CPU cores spend idle while I/O is outstanding, not evidence of CPU demand. Network connection counts do not measure disk saturation, and swap does not accelerate pending storage requests.