Question 1
Which two statements are true about the initial storage configuration after the standard (non-virtualized) deployment of a new Exadata Database Machine with High Capacity storage servers?
Which two statements are true about the initial storage configuration after the standard (non-virtualized) deployment of a new Exadata Database Machine with High Capacity storage servers?
What are two recommended configuration best practices for backup and recovery on Exadata?
Which two statements are true in regards to starting the Exadata Virtual Machine?
Which two of the following network connection types can be deployed on the client network ports of an Exadata X9M-2 Database Server?
You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?
What is the minimum Oracle Linux version required to support RoCE and Persistent Memory?
Your customer needs to ensure that their data is available on the Exadata machine during updates. The customer wants to be able to update one server at a time but still be protected against single-node server failure.
What ASM redundancy level should they use?
An Exadata storage server physical disk on an X9M-2 high-capacity full rack entered the predictive failure state. Which two steps must you perform to replace this failed physical disk?
You have been asked to design a backup solution for an Exadata X9M-2 Quarter Rack with Extreme Flash Storage Servers connected to a new ZFS Storage Appliance ZS7 with 2 Storage Controllers with 100Gb Ethernet cards and 3 Storage Trays. You are using Oracle Exadata Configuration Assistant to validate the rack layout.
1. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU10.
2. Use drop down to add ZFS Storage Appliance Controllers.
3. You cannot add ZFS Storage Appliance to an Exadata Rack.
4. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU1.
5. Use drop down to add ZFS Storage Trays.
6. Use "Add Equipment" to add the Exadata X9M Database Servers, starting from RU16.
7. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU1.
8. Use drop down to add Exadata X9M EF Storage Servers.
9. Use "Add Equipment" to add the ZFS Storage Controllers, starting from RU27.
10. Use drop down to add Exadata X9M Database Servers.
11. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU31.
Which of these steps are correct and what is their correct order?
An Exadata X9M-2 Elastic Rack with 4 Database Servers and 8 HC Storage Servers and 3-phase 24kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU. Which statement is correct?