Free PeopleCert DEVOPS Institute DevOps Foundation v3.6 Exam DevOps-Foundation Exam Questions

Last updated: · 10 practice questions with answers and explanations

Page: 1 / 7 Total 40 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Exploring DevOps

Skill tested: Connects DevOps adoption to improved flow of value across development and operations.

A regional retailer has separate development and operations departments. Developers are rewarded for delivering features quickly, while operations is measured on avoiding production changes. Releases are infrequent, and handoffs regularly produce delays and deployment surprises. Executives want to adopt DevOps but do not want to begin by purchasing a new tool suite or reorganizing every team. Which initial outcome best expresses the central purpose of DevOps and gives the organization a useful direction for improvement?

Correct Answer: C. Improve collaboration and feedback across the lifecycle so the organization can deliver and operate value more effectively.
Explanation:

DevOps aims to improve the flow of value by strengthening collaboration, feedback, and shared responsibility across development and operations. That direction addresses the retailer's handoff delays and conflicting incentives without assuming that a tool purchase or immediate reorganization is the solution. Increasing feature output alone preserves the release bottleneck. Assigning reliability only to developers reinforces a functional divide rather than addressing it. Selecting a tool suite first risks automating existing problems without improving the way people work together.

Question 2

New Single answer

Topic: Core DevOps Principles

Skill tested: Applies the Theory of Constraints to identify and improve a system's current bottleneck.

A software group completes development work quickly, but its security review queue takes three weeks and determines when releases can proceed. The team proposes adding more developers so that it can create additional features while the reviewers catch up later. Leadership wants a change that improves end-to-end throughput rather than the amount of locally completed work. Under the Theory of Constraints, what should the group do next?

Correct Answer: C. Identify and manage the security review as the constraint, then improve its effective capacity and flow.
Explanation:

The Theory of Constraints directs attention to the system's limiting step. Since the security review queue controls release timing, the group should understand and improve that constraint - for example, by reducing avoidable review work, clarifying risk-based review criteria, or increasing suitable review capacity. Adding developers may increase work-in-progress without increasing throughput. Equal limits may be useful in some flow designs but do not replace identifying the actual constraint. Maximizing developer utilization can create more inventory upstream and worsen the queue.

Question 3

New Multiple answers

Topic: Key DevOps Practices

Skill tested: Selects complementary monitoring and observability practices for diagnosing production behavior.

A subscription service has dashboards for CPU, memory, and request counts, but support teams struggle to explain why a small subset of customers experiences slow transactions. The service is composed of several independently deployed components, and releases must remain available while teams investigate problems. The organization wants evidence that helps connect customer-visible symptoms to component behavior and supports timely response. Select TWO practices that best meet this need.

Correct Answer: A. Correlate traces, logs, and metrics using consistent service and request context.; B. Establish service-level indicators and objectives for customer-relevant latency and availability.
Explanation:

Correlated traces, logs, and metrics help teams follow a request across independently deployed components and investigate specific slow transactions. Service-level indicators and objectives connect operational measurement to customer experience, providing a basis for alerting and reliability decisions. More frequent host polling may show resource changes but does not by itself explain a distributed request's path. Pre-release tests cannot replace production observation. Restricting telemetry access and centralizing all response can slow diagnosis and weaken shared ownership.

Question 4

New Single answer

Topic: Business and Technology Frameworks

Skill tested: Uses Lean value-stream thinking to reduce delays and improve end-to-end delivery flow.

A financial services team maps a customer change from request approval through development, testing, compliance review, and production. The map shows that most elapsed time is spent waiting for a monthly review meeting, although the actual review takes less than an hour. Compliance requirements cannot be removed, and the organization must preserve its existing approval evidence. Which improvement best applies Lean and value-stream thinking without weakening governance?

Correct Answer: C. Work with compliance to define evidence and decision criteria that enable review at the point of need, while preserving required records.
Explanation:

Value-stream thinking examines end-to-end flow and targets delay while retaining necessary controls. Defining the evidence and decision criteria with compliance can allow reviews to occur when changes are ready rather than waiting for a calendar event, while preserving auditability. Merely asking developers to work faster does not address the queue. Moving a monthly meeting changes its timing but keeps the delay mechanism. Removing a required control would violate the stated constraint and confuses waste reduction with eliminating necessary risk management.

Question 5

New Multiple answers

Topic: Culture, Behaviours, Operating Models

Skill tested: Identifies learning-organization responses that encourage reporting and prevent repeated failures.

After an outage, a company's review process focuses on identifying the person who approved the change. Staff therefore delay reporting near misses, and similar failures recur because teams do not share what they learn. The company still needs clear accountability and practical actions that reduce risk. Select TWO responses that best support a learning organization and a constructive safety culture.

Correct Answer: A. Share the review's lessons and track specific corrective actions to completion.; C. Conduct a blameless review focused on contributing conditions, system design, and learning.
Explanation:

A blameless review examines how system conditions, decisions, and safeguards combined to produce an outcome, encouraging candid reporting without abandoning accountability. Sharing lessons and tracking corrective actions helps the wider organization learn and reduces the likelihood of recurrence. Removing all responsibility is not the same as a safety culture; deliberate or reckless conduct still requires appropriate handling. Restricting findings prevents organizational learning. Ranking teams by reported incidents can discourage reporting and distort the safety signal.

Question 6

New Single answer

Topic: Automation, Architecting DevOps Toolchains

Skill tested: Selects an infrastructure-as-code approach that makes environment changes repeatable and reviewable.

A product team provisions test environments by following a shared document of manual console steps. Environments often differ, and developers cannot determine which infrastructure changes occurred between test runs. The team needs repeatable environments, peer review of changes, and a way to recreate infrastructure consistently. It has no requirement to adopt a particular cloud provider or infrastructure product. Which approach best meets these needs?

Correct Answer: D. Represent infrastructure configuration as version-controlled code and apply reviewed, automated changes to environments.
Explanation:

Infrastructure as code records desired infrastructure configuration in a version-controlled, reviewable form and enables consistent automated provisioning or change. This directly addresses drift, repeatability, and traceability without requiring a specific provider. A second operator may reduce some manual errors but does not make changes reliably reproducible. A frozen environment becomes less representative as needs change and still does not provide a repeatable creation process. Screenshots document appearance, not executable configuration or a dependable means of recreation.

Question 7

New Single answer

Topic: Measurement, Metrics, and Reporting

Skill tested: Interprets change lead time alongside delivery and reliability measures to guide improvement.

A delivery dashboard shows that the average time from approved work to production has fallen substantially. During the same period, production failures and emergency rollbacks have increased, while executives praise the faster metric and ask teams to accelerate further. Leaders want to use DevOps measures to improve customer value without encouraging behavior that sacrifices stability. What is the best next step?

Correct Answer: B. Review speed, quality, and stability measures together, investigate the failure trend, and use customer-value outcomes to guide changes.
Explanation:

Change lead time is useful but cannot represent delivery performance by itself. Reviewing it alongside failure and rollback trends exposes a possible trade-off, while customer-value measures help keep improvement focused on outcomes rather than activity. A speed-only target could intensify risky behavior. Abandoning speed measurement discards useful information instead of interpreting it responsibly. Counting completed work items rewards output, not necessarily quality, stability, or value delivered to customers.

Question 8

New Multiple answers

Topic: Sharing, Shadowing and Evolving

Skill tested: Chooses practical enterprise adoption steps that build collaboration and learning across teams.

A large organization wants to extend DevOps practices beyond a successful pilot team. Some departments expect a central team to dictate a universal toolchain, while others worry that local product constraints will be ignored. Executives want credible evidence of progress, and teams need opportunities to learn from one another. A major reorganization is not approved this year. Select TWO actions that best support sustainable enterprise adoption.

Correct Answer: B. Use a limited number of representative pilots, measure outcomes, and adapt the approach using feedback before scaling.; C. Create opportunities for teams to share working practices, shadow one another, and discuss lessons from real delivery work.
Explanation:

Peer sharing and shadowing spread practical knowledge while allowing teams to understand how practices work in different contexts. Representative pilots with outcome measures and feedback provide evidence for adapting and scaling changes, which is more credible than assuming one solution fits every department. Mandating uniform tools and processes before understanding constraints can create resistance and poor fit. Confidential results prevent learning, while waiting for a major restructure delays improvement unnecessarily.

Question 9

New Single answer

Topic: Key DevOps Practices

Skill tested: Distinguishes continuous delivery from automatic production deployment when managing release risk.

A health services team has automated its build, integration tests, and deployment packaging. Every change that passes its pipeline can be deployed reliably, but a regulatory process requires an authorized person to decide when a release enters production. The team must avoid confusing this control with manual rebuilding or repeated testing outside the pipeline. Which release approach best fits the requirement?

Correct Answer: D. Use continuous delivery so production-ready changes can be released through the pipeline after the required authorization.
Explanation:

Continuous delivery keeps changes in a deployable state through automated build, test, and packaging practices while permitting a deliberate production release decision. That supports the required authorization without reintroducing manual rebuilding. Continuous deployment automatically releases qualifying changes to production, so it conflicts with the stated human authorization requirement. Limiting practice to continuous integration and manually rebuilding creates inconsistency and avoidable release risk. Authorization after deployment does not satisfy a control that must govern production entry.

Question 10

New Single answer

Topic: Automation, Architecting DevOps Toolchains

Skill tested: Selects generative AI safeguards that protect sensitive information and preserve human accountability.

An engineering group is considering a generative AI assistant to summarize publicly shareable technical documentation and help draft routine code comments. The same assistant could receive proprietary source code, customer data, or credentials if employees paste material without checking. The organization has not approved external processing of confidential information and requires engineers to remain accountable for changes. Which initial use policy is most appropriate?

Correct Answer: A. Limit initial use to approved public or non-sensitive material, prohibit secret and customer-data submission, and require human review of outputs.
Explanation:

A constrained initial policy enables lower-risk assistance while respecting the organization's restriction on external processing of confidential material. Prohibiting secrets and customer data reduces exposure, and human review preserves engineering accountability because generated content can be incomplete or incorrect. Unrestricted use ignores data-handling risk. Removing names does not necessarily anonymize proprietary code or sensitive context, and unreviewed output is unsafe. A blanket ban is more restrictive than necessary for the stated public-information use case.