Question 1
Topic: Quality Inspection
Skill tested: Configures inspection-lot creation and inspection types for goods receipt processing.
A manufacturer receives externally procured raw materials into unrestricted stock after inspection. A quality engineer finds that no inspection lot is created for a particular material at goods receipt, although the material is subject to incoming inspection. The material master has inspection type 01 activated, but the purchasing team requires inspection only for specified suppliers and wants other suppliers to receive directly into stock. What is the most appropriate configuration approach?
A quality information record can govern QM-related procurement controls for a specific material-vendor relationship, supporting different inspection requirements by supplier. Inspection type 01 must also be active for the material for a goods-receipt inspection to be created, and the relevant procurement settings must be consistent. Inspection type settings alone do not provide the requested supplier-specific selection. An inspection plan supplies inspection specifications rather than selecting suppliers for lot creation, while a usage decision is made after inspection and cannot control whether a lot is generated.