Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free VMware Cloud Operations 8.x Professional 2V0-32.22 Exam Questions

Last updated: · 10 practice questions with answers and explanations

Page: 1 / 6 Total 60 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Architecture and Technologies

Skill tested: Evaluates how vSphere resource pools allocate shared compute resources among workloads.

A private-cloud team runs several departmental workloads on a vSphere cluster. The departments have different service priorities, but the team wants unused CPU capacity to remain available to workloads that can use it. The team is considering resource pools and wants to avoid hard caps that strand capacity when another pool is busy. Which configuration best meets these requirements?

Correct Answer: D. Set CPU reservations for each pool and leave CPU limits unset; use shares to control relative access to contested CPU.
Explanation:

Reservations establish minimum resource commitments, while shares determine relative priority when sibling workloads compete for resources. With limits unset, a pool can consume available CPU beyond its reservation when capacity is idle. A CPU limit would cap consumption regardless of unused capacity, so B and C can strand resources; shares do not permit exceeding a limit. D reverses the functions of shares and reservations: shares provide relative priority under contention, not a guaranteed minimum.

Question 2

New Single answer

Topic: Products and Solutions

Skill tested: Selects an appropriate VMware cloud management capability for cross-cloud operations visibility.

An operations group manages a vSphere-based private cloud and workloads in two public clouds. It needs a consolidated view of infrastructure health, capacity, and workload performance, plus recommendations to identify overprovisioned virtual machines. The organization is not asking for a new hypervisor or a tool that only automates application deployment. Which solution capability is the best fit for this requirement?

Correct Answer: A. Use VMware Aria Operations to analyze infrastructure health, capacity, and performance across supported environments.
Explanation:

VMware Aria Operations is designed for operations management, including health, performance, capacity, and optimization analytics across supported environments. That aligns with the need for consolidated operational visibility and rightsizing insights. vSphere Lifecycle Manager manages lifecycle operations for vSphere components rather than cross-cloud analytics. Aria Automation focuses on automation and self-service provisioning, not serving as the primary health and capacity analytics engine. vCenter Server manages vSphere environments and does not provide a universal management plane for all public-cloud providers.

Question 3

New Single answer

Topic: Planning and Designing

Skill tested: Plans vSphere cluster capacity using workload demand, reservations, and high-availability headroom.

A company is designing a production vSphere cluster for a critical application tier. Its peak measured workload consumes nearly all CPU and memory across the proposed hosts, and the business requires the cluster to tolerate the loss of one host without violating the applications' resource commitments. Procurement has not approved additional hosts, and the design team must determine whether the current proposal is viable before implementation. What is the best next design decision?

Correct Answer: B. Reassess demand and add sufficient cluster capacity to cover the expected workload while preserving one-host failure headroom.
Explanation:

High availability requires real capacity on surviving hosts; HA restarts affected VMs but does not create CPU or memory. A design must account for the workload's resource demand and the capacity lost when one host fails, including any reservations or commitments. Admission control can help enforce a failover-capacity policy, but it cannot make an undersized cluster adequate. Limits and shares influence allocation behavior; neither creates physical capacity, so B and D do not solve the design shortfall.

Question 4

New Multiple answers

Topic: Installing, Configuring, and Setup

Skill tested: Configures vSphere networking with redundant uplinks and appropriate traffic segmentation.

During a new vSphere deployment, an administrator is building a distributed switch configuration for production workloads. Management and vMotion traffic must use distinct VLANs, and loss of one physical NIC or switch path must not isolate either traffic type. The physical switches support the required VLANs, and the administrator wants to use standard vSphere networking mechanisms rather than separate, uncoordinated host configurations. Which two actions should the administrator take? Select two.

Correct Answer: B. Configure redundant physical uplinks on the distributed switch and use an appropriate teaming and failover policy.; D. Create separate distributed port groups for management and vMotion, assigning each its intended VLAN.
Explanation:

Separate distributed port groups with the intended VLAN IDs provide the required Layer 2 segmentation while keeping configuration consistent across hosts. Redundant physical uplinks, paired with an appropriate teaming and failover policy, provide path resilience if a NIC or switch path fails. Different IP subnets alone do not replace VLAN separation. Separate clusters are unnecessary for this networking requirement, and placing both VMkernel adapters in one VLAN-backed port group would not provide the requested VLAN distinction.

Question 5

New Single answer

Topic: Performance-Tuning, Optimization, and Upgrades

Skill tested: Uses vSphere performance counters to distinguish CPU contention from guest-level demand.

A virtual machine's application has become intermittently slow after other workloads were added to its ESXi host. Guest CPU utilization is high, but the application team cannot determine whether the VM needs more vCPU or is waiting for physical CPU scheduling. The operations team wants to make a measured change rather than enlarge the VM based on guest utilization alone. Which metric should it examine first to assess CPU scheduling contention?

Correct Answer: C. CPU ready time for the VM, because it indicates time the VM was ready to run but waiting for physical CPU.
Explanation:

CPU ready time measures time during which a VM is ready to run but is waiting for physical CPU scheduling. It helps distinguish host-side CPU contention from high CPU demand inside the guest and should inform decisions about host loading or VM sizing. Guest utilization alone does not measure scheduler wait, so A is insufficient. Datastore latency concerns storage I/O, and balloon activity reflects memory reclamation rather than CPU scheduling, making C and D unrelated to the stated diagnostic question.

Question 6

New Single answer

Topic: Troubleshooting and Repairing

Skill tested: Diagnoses vSphere HA restart failures by checking admission control and available failover capacity.

After an ESXi host fails, vSphere HA successfully detects the failure, but several affected virtual machines do not restart on the remaining hosts. The cluster has adequate datastore access, and the VMs are visible in inventory. The failed host contained VMs with reservations, and the cluster is configured to preserve failover capacity. What should the administrator investigate first to identify why HA could not restart the VMs?

Correct Answer: C. Whether the remaining hosts have sufficient unreserved CPU and memory to satisfy the VMs' admission requirements.
Explanation:

HA restart placement must satisfy resource requirements, including reservations, on the surviving hosts. Admission control protects failover capacity, but a host failure can leave insufficient unreserved CPU or memory for some VMs to power on. Checking that capacity is therefore the first relevant step. CPU limits do not cause HA to ignore reservations, and shares do not override admission control. vMotion connectivity is not required to restart VMs after a host failure, so D does not address the likely constraint.

Question 7

New Multiple answers

Topic: Administrative and Operational Tasks

Skill tested: Applies least-privilege vCenter roles and scopes privileges to delegated administration.

A service desk must be able to power-cycle VMs in one application folder and inspect their basic status, but it must not edit VM hardware, change networking, or administer other folders. The organization uses centralized vCenter identity management and requires permissions to remain easy to audit. Which two actions best implement this delegation? Select two.

Correct Answer: A. Create or select a role containing only the required VM power and read privileges.; D. Grant the limited role on the specific application folder and enable propagation only as needed for its VMs.
Explanation:

A narrowly scoped role limits the privileges available, and assigning it to the application folder confines its effective scope to the intended inventory. Propagation should be enabled where necessary so the permissions reach the folder's VMs, while avoiding broader objects. An administrator role at the vCenter root and a global permission grant excessive scope. Hiding interface controls does not remove privileges, and datacenter-level configuration rights exceed the service desk's stated duties.

Question 8

New Single answer

Topic: Architecture and Technologies

Skill tested: Distinguishes vSphere HA restart protection from fault-tolerant continuous availability.

A business service runs on a VM whose operating system and application cannot be modified. The service owner requires the VM to resume operation automatically after an ESXi host fails, but accepts a brief interruption while the VM restarts. The cluster has shared storage and is configured for host failure detection. The owner does not require uninterrupted execution or zero loss of in-memory state. Which vSphere capability most directly meets the requirement?

Correct Answer: C. vSphere HA, configured to restart the VM on a surviving host after detecting the failure.
Explanation:

vSphere HA detects host failure and restarts affected VMs on surviving hosts, which matches the accepted interruption and automatic recovery requirement. Fault Tolerance is intended for continuous availability with a secondary execution instance and is not necessary when a restart is acceptable. DRS can place or migrate running VMs under suitable conditions, but it cannot migrate a VM after its host has failed. Storage DRS manages datastore placement and does not provide host-failure VM restart protection.

Question 9

New Single answer

Topic: Products and Solutions

Skill tested: Chooses vSphere Lifecycle Manager image management for consistent cluster software remediation.

An administrator manages a homogeneous group of ESXi hosts in a cluster and wants to standardize the ESXi version, vendor add-on, and firmware or driver components represented in the cluster's desired state. The current hosts were patched individually, and drift has made future maintenance difficult. The team wants to validate compliance and remediate hosts through vCenter while retaining a consistent cluster-level definition. Which approach is most appropriate?

Correct Answer: A. Use a vSphere Lifecycle Manager cluster image to define the desired software state and remediate hosts against it.
Explanation:

A vSphere Lifecycle Manager cluster image provides a desired-state model for supported ESXi software components, including the ESXi version and applicable vendor add-on or component selections. Compliance checking and remediation help address host drift consistently through vCenter. Roles govern access, not host software state. DRS places and balances VMs; it does not manage ESXi images or firmware. Storage DRS manages virtual machine storage placement, so it cannot enforce host software consistency.

Question 10

New Single answer

Topic: Planning and Designing

Skill tested: Plans workload migration by validating compatibility, dependencies, and cutover constraints.

A company plans to move a business-critical workload from one vSphere environment to another. The migration window is short, the source workload has strict availability requirements, and the target uses a different vSphere release and network design. The project team has not yet confirmed guest compatibility, storage placement, or application dependencies. Management asks the operations lead to approve a cutover date immediately. What is the best response?

Correct Answer: B. Complete a migration assessment covering compatibility, dependencies, target capacity and networking, then validate the migration and rollback plan before scheduling cutover.
Explanation:

A constrained production migration should be based on a validated assessment of guest and virtual hardware compatibility, application dependencies, target capacity, networking, storage, and the planned migration method. Testing and a rollback plan reduce the risk of an outage during the narrow window. Scheduling before resolving these unknowns shifts discovery into the highest-risk period. Copying files does not validate dependencies or make incompatible configurations work, and source reservations do not correct target-side constraints.