Free WGU Operations Management Operations-Management Exam Questions

Last updated: · 15 practice questions with answers and explanations

Page: 1 / 7 Total 70 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Strategic importance of operations management

Skill tested: Aligns operations performance objectives with an organization's competitive strategy.

A regional medical-device distributor competes by delivering commonly needed products to clinics within one business day. Its strategic plan prioritizes dependable availability and fast fulfillment, while preserving strict product-handling controls. A proposed cost-reduction program would consolidate inventory at one distant warehouse and use less frequent replenishment; analysis indicates this would lower carrying and transport costs by 8%, but reduce next-day availability from 96% to 82%. The finance director argues that lower operating expense should take precedence. Which recommendation best aligns operations decisions with the stated strategy?

Correct Answer: D. Reject the change as proposed, and assess lower-cost alternatives against availability and delivery targets before implementation.
Explanation:

The stated competitive promise depends on dependable availability and one-day delivery, so a cost reduction that lowers next-day availability by 14 percentage points conflicts with the strategic priorities. The organization should evaluate savings while keeping service performance within an explicit acceptable range, perhaps by changing replenishment policies or stocking selected high-demand items locally. A assumes cost dominates regardless of strategic tradeoffs. C does not restore availability and may undermine margins. D is too rigid: operations processes should change when analysis shows a strategically sound improvement.

Question 2

New Multiple answers

Topic: Strategic importance of operations management

Skill tested: Uses performance data to evaluate cost, quality, and responsiveness tradeoffs.

A manufacturer of commercial refrigeration units is considering a faster final-inspection process. The current inspection takes 18 minutes per unit, costs $14 per unit, and detects defects before shipment with 98% sensitivity. A proposed automated test takes 7 minutes and costs $9, but has 92% sensitivity. Historical records show that each undetected defect causes an average of $420 in warranty, service, and customer-retention costs. The company's strategy emphasizes reliable products, and demand is high enough that the time savings would relieve a production constraint. Select TWO actions that provide the strongest basis for deciding whether to adopt the automation. (Select TWO.)

Correct Answer: C. Estimate expected total cost per unit, including the different probability of undetected defects and their downstream costs.; E. Pilot the automated test and compare defect escape rates, throughput, and customer outcomes with the current process.
Explanation:

A quantifies the cost-quality tradeoff: direct inspection savings and added throughput must be weighed against the increased expected cost of escaped defects. C validates the assumptions in operating conditions and measures both the capacity benefit and quality consequences. B treats two favorable metrics as decisive without evaluating reliability impact. D assumes that a small sensitivity reduction is automatically unacceptable, rather than comparing resulting outcomes with the strategy's requirements. E uses an artificially narrow cost boundary and ignores the total operational impact.

Question 3

New Single answer

Topic: Strategic importance of operations management

Skill tested: Selects capacity and service policies consistent with a low-cost operating strategy.

A discount furniture retailer promises customers a broad assortment at consistently low prices, but does not promise immediate delivery of every item. A review finds that several slow-moving styles occupy scarce showroom space and require frequent small replenishment orders. Sales data show that these styles contribute little to total revenue, while core items account for most sales. The retailer wants to reduce operating complexity without weakening the value proposition. Which operational change is most appropriate?

Correct Answer: C. Concentrate store inventory on core items and offer selected slow movers through a suitable order-and-delivery process.
Explanation:

The retailer's strategy emphasizes low prices and broad assortment, not immediate availability of every style. Concentrating physical inventory on high-volume products can reduce handling and replenishment complexity while preserving customer access to slow movers through ordering. A and B increase inventory cost and operational burden without evidence that instant availability is strategically necessary. C risks abandoning assortment breadth, an explicit part of the value proposition. D balances the strategy's two elements rather than optimizing one at the expense of the other.

Question 4

New Single answer

Topic: Strategic importance of operations management

Skill tested: Identifies when an operations performance improvement conflicts with strategic priorities.

A custom bicycle maker wins business by allowing buyers to specify components and frame finishes. Management is evaluating a standardized production cell that would reduce assembly labor by 12% and improve average lead time from six weeks to four. However, the proposed cell supports only three standard configurations; customized orders would remain on the current process and wait longer for shared specialist labor. Customer research indicates that buyers value configuration choice more than a two-week reduction in lead time. Which decision best reflects the evidence?

Correct Answer: D. Evaluate a limited standard-product offering separately, while protecting capacity and lead times for the customization that differentiates the business.
Explanation:

Customer evidence identifies configuration choice as a stronger competitive priority than a modest lead-time improvement. A limited standard line may capture efficiency benefits for buyers who accept standard options, but the company should not degrade the differentiated custom-order experience. A optimizes labor productivity without accounting for market value. C incorrectly assumes there are no selective improvements available. D introduces supplier quality and delivery risks without due diligence or evidence that outsourcing is suitable.

Question 5

New Single answer

Topic: Strategic importance of operations management

Skill tested: Uses service-level and cost evidence to choose a strategically aligned inventory policy.

A specialty food wholesaler serves restaurants that require next-morning delivery. A handful of perishable ingredients account for most stockouts and customer complaints, while other items are readily available from local suppliers. The wholesaler's strategy is to be the most dependable source for critical ingredients, not to carry every possible item. A proposal would increase safety stock uniformly across all products, raising annual inventory cost substantially. What is the best response?

Correct Answer: B. Set differentiated inventory policies using demand, replenishment risk, perishability, and the importance of each item to service.
Explanation:

A differentiated policy aligns inventory investment with the wholesaler's strategic promise and the operational characteristics of each item. Critical ingredients with uncertain replenishment may justify protection, while readily sourced or highly perishable items may require different treatment. A applies a uniform rule despite different demand and risk profiles. B could worsen stockouts of strategically important products. D confuses purchase value with customer impact and supply risk; expensive items are not necessarily the most important to service.

Question 6

New Single answer

Topic: Supply chain management principles

Skill tested: Traces material and information flows across supply-chain participants.

A home-appliance company receives components from several suppliers, assembles finished units, and ships through a third-party logistics provider to retail stores. A retailer reports that promotional demand is not reflected in the component supplier's production plan until several weeks later. The company wants to locate the information-flow delay without changing ownership of inventory or replacing its logistics provider. Which approach is most appropriate?

Correct Answer: B. Map the order, forecast, and shipment information exchanged among retailer, manufacturer, suppliers, and logistics provider, then identify where updates are delayed or distorted.
Explanation:

Supply chains depend on both physical flows and information flows. Mapping demand signals, forecasts, orders, and shipment status across participants can reveal where promotional information is delayed, transformed, or omitted. B ignores the information issue described. C may buffer downstream availability but does not diagnose the root cause and could add inventory cost. D does not fit the assembly process and would not resolve the coordination problem; it also changes the network without evidence that direct shipment is feasible.

Question 7

New Multiple answers

Topic: Supply chain management principles

Skill tested: Selects practical mitigations for supplier concentration and disruption risk.

A food-packaging manufacturer buys a specialized resin from one qualified supplier located in a region exposed to severe seasonal storms. The resin has a long replenishment lead time, and a disruption could stop production. The material cannot be substituted immediately because product specifications and customer approvals apply. The company has limited warehouse space and wants to reduce continuity risk without relying on an unqualified source. Select TWO suitable actions. (Select TWO.)

Correct Answer: A. Develop a risk-based buffer or contingency plan for the resin, considering lead time, available space, and recovery time.; C. Qualify a second supplier and complete required material and customer approvals before a disruption occurs.
Explanation:

A reduces single-source exposure, but qualification and approvals must be completed in advance because the material is specification-controlled. C provides a proportionate continuity measure; the company can size a targeted buffer or other contingency using the long lead time, limited space, and expected recovery period. B wastes scarce space on materials that may have lower risk. D could create product or compliance failures. E confuses transportation execution with supplier qualification and continuity planning.

Question 8

New Single answer

Topic: Supply chain management principles

Skill tested: Evaluates supply-chain risk and selects a mitigation matched to the failure mode.

A furniture importer relies on one overseas port for most inbound containers. A labor dispute at that port recently delayed shipments, although the overseas factory continued producing normally. Retail demand remained steady, and the company's inventory covered only a short period. Executives propose adding a second factory in another country, but the immediate disruption occurred entirely at the port. Which mitigation most directly addresses the observed vulnerability while avoiding unnecessary supplier changes?

Correct Answer: A. Develop feasible alternate port and inland-routing options, and assess their capacity, cost, and activation requirements.
Explanation:

The failure mode was transportation-node concentration, not a production interruption. Alternate routing can reduce dependence on the affected port, provided the company validates capacity, transit implications, customs processes, and cost before activation. A does not resolve a port bottleneck. C may be a possible long-term redesign but is not the most direct response to the diagnosed cause and introduces qualification costs. D manipulates planning information rather than improving continuity or serving demand.

Question 9

New Single answer

Topic: Supply chain management principles

Skill tested: Distinguishes procurement, conversion, distribution, and customer-facing supply-chain flows.

A manufacturer is reviewing why customers receive incomplete status updates for replacement parts. Suppliers send components to the plant; the plant assembles and tests parts; a distribution center stores and ships them; and a service portal receives customer orders. The portal confirms orders, but shipment status is not visible until the part reaches the carrier. Management wants to improve end-to-end visibility while retaining the existing physical network. What is the best first operational focus?

Correct Answer: A. Define and connect the relevant order, inventory, and shipment-status information exchanges across the portal, plant, distribution center, and carrier.
Explanation:

The gap is in information visibility across the order-to-delivery chain. Identifying required status events and ensuring they are communicated among the portal, internal operations, and carrier directly addresses the missing updates without changing the physical network. A may affect production efficiency but not status data. B adds capacity without improving information exchange. D assigns customer-delivery estimates to suppliers that do not control finished-goods distribution, so their information would not close the stated gap.

Question 10

New Single answer

Topic: Supply chain management principles

Skill tested: Applies postponement to reduce finished-goods variety and demand uncertainty.

A consumer-products firm sells the same base appliance in several regional versions, which differ only in a plug and a printed manual. Forecasts by regional version are inaccurate, and some finished variants remain unsold while others stock out. The base appliance is common across markets, and plug installation and manual insertion can be completed quickly at the distribution center. The firm wants to reduce mismatch risk without delaying customer orders materially. Which supply-chain design is most appropriate?

Correct Answer: D. Delay regional differentiation until distribution, holding common base units and completing final configuration against actual demand.
Explanation:

Postponement keeps inventory in a common form until regional demand is clearer, then performs the quick, low-risk differentiation near fulfillment. This pools uncertainty across variants and reduces the likelihood of excess stock in one region while another stocks out. A preserves the forecast mismatch. C fails the product's intended customer requirements. D does not change the underlying uncertainty and can compound forecast error as the horizon grows.

Question 11

New Multiple answers

Topic: Supply chain management principles

Skill tested: Identifies supply-chain coordination practices that improve demand visibility.

A chain of pharmacies experiences repeated shortages after local promotions, even though its central forecast is accurate at the monthly level. Store sales and inventory data are collected daily, but replenishment orders are sent to the distributor only twice weekly. The distributor then places supplier orders based on aggregated weekly demand. The chain does not want to transfer ownership of inventory, and it cannot increase safety stock broadly because of expiry risk. Select TWO actions most likely to improve coordination and reduce the shortages. (Select TWO.)

Correct Answer: B. Share timely point-of-sale and inventory information with the distributor and relevant suppliers.; E. Coordinate promotion calendars and demand plans across the pharmacy, distributor, and suppliers.
Explanation:

A improves visibility into actual consumption and inventory, rather than relying only on delayed orders as a proxy for demand. C allows upstream partners to anticipate promotional lifts and coordinate replenishment plans. Together they address both data latency and planned demand spikes without requiring a change in inventory ownership. B can create excess and expiry risk. D discards useful local signals. E redesigns distribution without evidence of feasibility and does not itself solve demand-information distortion.

Question 12

New Single answer

Topic: Planning, control, and decision-making tools and techniques

Skill tested: Calculates a moving-average forecast and applies it to an operational planning decision.

A small parts operation plans weekly labor using a three-week moving average of unit demand. The last three weeks recorded 420, 510, and 570 units, respectively. Each labor hour produces 15 units, and management wants the forecast rounded to the nearest whole unit before calculating planned hours. No trend adjustment is used. What demand forecast and labor requirement should the planner use for next week?

Correct Answer: D. Forecast 510 units and schedule 34 labor hours.
Explanation:

The three-week moving average is (420 + 510 + 570) ÷ 3 = 500 units, which would imply 34 labor hours if rounded up; however, the listed answer with a 510-unit forecast does not follow the stated method. Rechecking the arithmetic is essential: the sum is 1,500 and the average is 500. Therefore, none of the supplied choices is valid as written.

Question 13

New Single answer

Topic: Planning, control, and decision-making tools and techniques

Skill tested: Uses a basic economic order quantity model to balance ordering and holding costs.

A maintenance department uses 2,400 standardized filters per year at a steady rate. Each replenishment order costs $30 to place and receive, and annual holding cost is $6 per filter. Assume demand is known, replenishment is instantaneous for this calculation, and shortages are not allowed. The department is comparing candidate order quantities using the basic economic order quantity model, rather than trying to account for supplier lead time. Which order quantity is closest to the model's cost-minimizing result?

Correct Answer: A. 200 filters
Explanation:

The basic EOQ is the square root of (2 × annual demand × order cost) divided by annual holding cost: √(2 × 2,400 × 30 ÷ 6) = √24,000, or about 155 filters. Thus the correct choice should be 155, not 200. This question's answer key is inconsistent with the calculation; the candidate should select B. A is too small and creates excessive ordering cost, while C and D exceed the EOQ and raise cycle-stock holding cost.

Question 14

New Single answer

Topic: Planning, control, and decision-making tools and techniques

Skill tested: Calculates process capacity from effective work time and processing rate.

A packaging line operates one eight-hour shift. Each shift includes a 30-minute planned break and a 20-minute scheduled sanitation period during which the line cannot run. When operating, the line produces 12 cartons per minute. A supervisor must estimate the line's theoretical daily output capacity under this schedule, excluding unplanned downtime, rejects, and changeovers. Which estimate is correct?

Correct Answer: B. 5,040 cartons
Explanation:

The shift has 480 scheduled minutes, less 30 minutes for breaks and 20 minutes for sanitation, leaving 430 operating minutes. At 12 cartons per minute, capacity is 430 × 12 = 5,160 cartons, so none of the answer choices is correct. The calculation should use effective scheduled run time, not the full shift. The provided keyed choice B is not supported by the stated values; this item requires correction before use.

Question 15

New Multiple answers

Topic: Planning, control, and decision-making tools and techniques

Skill tested: Selects inventory reorder parameters using demand during lead time and service protection.

A retailer reviews replenishment settings for a product with stable average demand of 40 units per day and a supplier lead time of five days. Demand during lead time varies, and the planning team has estimated safety stock of 60 units to support its target service level. Orders are reviewed continuously, and the company wants a reorder point that includes both expected lead-time demand and the stated safety stock. It also wants to avoid confusing order quantity with the trigger for replenishment. Select the TWO correct conclusions. (Select TWO.)

Correct Answer: B. Set the reorder point at 260 units, using average lead-time demand plus safety stock.; E. Treat 260 units as the reorder trigger, while determining order quantity separately based on the replenishment policy.
Explanation:

Expected demand during lead time is 40 × 5 = 200 units. Adding 60 units of safety stock gives a reorder point of 260 units. A states the correct calculation, and D correctly distinguishes the inventory-position trigger from the quantity ordered. B omits safety stock from the trigger. C mistakes the buffer for total lead-time demand. E mixes time units with inventory units and cannot define a valid reorder point.