Free APICS Certified in Planning and Inventory Management (Part 2) CPIM-Part-2 Exam Questions

Last updated: · 14 practice questions with answers and explanations

Page: 1 / 11 Total 151 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Align the Supply Chain to Support the Business Strategy

Skill tested: Aligns supply-chain capabilities and performance measures with a chosen business strategy.

A manufacturer is shifting from competing primarily on low cost to offering rapid customization for a narrow set of high-value customers. Its current network uses large, centralized plants and measures success mainly through equipment utilization and unit cost. The executive team wants the supply chain to support the new strategy without abandoning cost discipline for standard products. Which change is the best strategic response?

Correct Answer: C. Segment products and customers, establish a responsive flow for high-value customization, and use differentiated service, lead-time, and cost measures.
Explanation:

A segmented supply-chain design links operating capabilities and KPIs to distinct value propositions. A responsive flow for customized, high-value demand supports the new strategy, while the standard-product flow can continue to emphasize cost. Applying one model to all products, as in A, ignores meaningful differences in demand and value. C may add substantial fixed cost without evidence that every product needs regional speed. D changes a measure but leaves the network and operating processes misaligned with customization.

Question 2

New Single answer

Topic: Align the Supply Chain to Support the Business Strategy

Skill tested: Prioritizes supply-chain risks using business impact and likelihood to select mitigation.

A global producer relies on one supplier for a specialized component with a long qualification cycle. A disruption would stop its highest-margin product line, although the component represents little spend. The supplier is in a region exposed to severe weather, and no technically approved substitute exists. Finance resists holding additional inventory because the component's purchase value is high relative to its size. What should the supply-chain risk team do FIRST?

Correct Answer: D. Assess probability and business impact, then evaluate practical mitigations such as qualification, continuity planning, and targeted protection stock.
Explanation:

Risk prioritization should consider both likelihood and consequence, including the lost contribution and customer impact of stopping the highest-margin line. The team should validate exposure and compare feasible mitigations, including a second source, continuity measures, and targeted buffer stock. A focuses on spend and misses the business consequence. B commits to an arbitrary inventory quantity without assessing disruption scenarios, carrying cost, or other mitigations. D may provide compliance information but does not establish operational resilience.

Question 3

New Single answer

Topic: Conduct Sales and Operations Planning (S&OP) to Support Strategy

Skill tested: Reconciles aggregate demand, supply, and financial plans through executive S&OP decisions.

At the monthly executive S&OP meeting, the demand plan rises 18% for a new product. The supply plan can meet only 10% growth during the next two quarters without a second shift or outside production. The proposed shift would increase labor and conversion costs, while delaying some customer orders risks losing launch momentum. The portfolio team also proposes reducing a mature product to free capacity, but its forecasted margin and customer commitments have not been reviewed. Which action best supports an effective S&OP decision?

Correct Answer: B. Have the demand, supply, portfolio, and finance owners compare feasible scenarios, quantify service and financial consequences, and recommend a reconciled plan for executive approval.
Explanation:

S&OP reconciles demand, supply, portfolio, and financial plans at an aggregate level so executives can make informed trade-offs. Scenario analysis can compare added capacity, controlled allocation, delayed demand, and portfolio changes against margin, cost, and service objectives. A treats an unconstrained forecast as executable and shifts the gap to costly expediting. C hides the demand and financial implications rather than reconciling them. D changes the portfolio without evaluating customer commitments or the economic effect.

Question 4

New Single answer

Topic: Plan and Manage Demand

Skill tested: Selects a forecast approach that accounts for launch demand and separates causal inputs from history.

A company is preparing a demand plan for a replacement appliance. The predecessor has five years of relatively stable sales history, but retailers will receive the new model in phases and marketing will run a promotion in the first quarter. The new model also has different features and a higher price. The planning team must produce a forecast before meaningful sales history exists and update it as launch results arrive. Which approach is most appropriate?

Correct Answer: B. Use a launch forecast informed by predecessor history, planned distribution, price and promotion assumptions, then update it using actual sales and forecast error.
Explanation:

A new product lacks its own stable history, so an initial forecast should combine relevant analog data with known causal inputs such as distribution timing, pricing, and promotion. Actual launch results and forecast error then support disciplined updates. A assumes the replacement will behave exactly like its predecessor despite different features and price. C extrapolates a single potentially distorted launch month. D discards information that materially affects demand and undermines cross-functional demand planning.

Question 5

New Single answer

Topic: Plan and Manage Supply

Skill tested: Uses master scheduling and rough-cut capacity planning to validate a feasible production plan.

A plant's master schedule shows a major increase in a family of products during a promotion. The schedule is within the aggregate monthly production limit, but the products all use the same bottleneck packaging line, which runs only two shifts. Purchasing has already received planned orders for the required materials. The plant manager wants to release the schedule immediately because material availability is adequate. What is the best next step?

Correct Answer: D. Run rough-cut capacity planning against the key packaging resource and revise the master schedule or capacity plan for any overload.
Explanation:

A master schedule must be checked against critical resources, not just aggregate output or material availability. Rough-cut capacity planning identifies whether the packaging line can support the proposed production timing; the plan can then be adjusted through rescheduling, overtime, or another feasible capacity response. A overlooks the shared bottleneck. C adds inventory without ensuring it can be produced. D confuses procurement with internal capacity and cannot resolve a packaging-line overload.

Question 6

New Single answer

Topic: Plan and Manage Supply

Skill tested: Applies time-phased material requirements planning to respond to a component shortage.

A planner discovers that a purchased component will arrive one week after the planned start of an assembly order. The component has no approved substitute, and the supplier confirms that the late date is firm. The affected assembly is not yet released, and the final customer due date is important but has some schedule flexibility. Several other orders use the same component in later periods. What should the planner do FIRST?

Correct Answer: B. Review the time-phased material requirements and order priorities, then reschedule the affected order or negotiate a feasible recovery plan.
Explanation:

The planner should use the time-phased requirements and order priorities to determine the shortage's actual impact and select a feasible recovery, such as rescheduling the unreleased order or agreeing on a supplier recovery plan. A relies on an unconfirmed expedite. C does not address the current dated shortage and may create excess later. D sacrifices other commitments without establishing that it would solve the immediate timing problem or represent the best priority decision.

Question 7

New Single answer

Topic: Plan and Manage Supply

Skill tested: Selects a supplier performance and relationship response based on total cost and delivery risk.

A buyer is evaluating two sources for a critical purchased assembly. Supplier X has the lowest quoted price but has repeatedly delivered late and requires frequent expediting. Supplier Y charges more per unit but has stable lead times, lower defect rates, and provides timely capacity information. The business cannot tolerate recurring line stoppages, but procurement is measured on purchase-price variance. Which recommendation best supports the organization's supply objectives?

Correct Answer: A. Compare total cost and supply risk, then establish a supplier relationship and performance plan that accounts for delivery, quality, and continuity.
Explanation:

Supplier selection should consider total cost of ownership and risk, not purchase price alone. Late deliveries, defects, expediting, and line stoppages can outweigh a lower quote. A would reinforce a narrow metric and ignore operational cost. C overstates what a higher price guarantees and removes performance accountability. D may diversify exposure in some circumstances, but an arbitrary split and no review do not address capability, qualification, or ongoing supplier performance.

Question 8

New Multiple answers

Topic: Plan and Manage Inventory

Skill tested: Balances cycle stock, safety stock, and replenishment parameters against service and cost objectives.

A distributor is revising inventory policy for a group of high-volume items. Demand is reasonably stable, replenishment lead time varies modestly, and the target service level is based on cycle service rather than a fixed fill rate. The company wants to avoid excess working capital while protecting against normal demand and lead-time variation. Which TWO planning actions are most appropriate? Select TWO.

Correct Answer: C. Set safety stock using demand and lead-time variability at the target cycle service level, and review it as those inputs change.; E. Calculate the order quantity using relevant ordering and carrying costs, then review it when those cost assumptions change.
Explanation:

Order quantity should reflect the relevant trade-off between replenishment effort and carrying cost, while safety stock should protect against uncertainty in demand and lead time at the chosen service objective. These parameters should be revisited when their underlying inputs change. C confuses expected lead-time demand with protection against variability. D ignores item-specific economics and demand. E may increase average inventory without correcting causes such as poor forecasts, supplier delays, or inaccurate records.

Question 9

New Multiple answers

Topic: Plan and Manage Inventory

Skill tested: Applies inventory classification and control methods to prioritize managerial attention.

A manufacturer has thousands of stocked items but limited staff for cycle counting and inventory analysis. A small share of items represents most inventory value, while some low-value components can still stop production if unavailable. Demand patterns also differ, with some items consumed steadily and others intermittently. Management wants a practical control policy that improves attention allocation without treating all items identically. Which TWO actions are best? Select TWO.

Correct Answer: B. Consider operational criticality and demand variability alongside value when selecting review and replenishment controls.; E. Classify items by value contribution and use more frequent review and tighter controls for the most consequential classes.
Explanation:

Value-based classification directs managerial effort toward items with the greatest inventory investment, while criticality and demand behavior identify low-value items that can nevertheless disrupt production or require different control methods. Together, these approaches support differentiated counting and replenishment policies. C creates potentially excessive stock across the portfolio. D leaves critical low-value items vulnerable and undermines record accuracy. E ignores differences in consumption, lead time, and operational consequence.

Question 10

New Single answer

Topic: Plan and Manage Inventory

Skill tested: Selects an appropriate disposition path for returned inventory based on condition and recoverable value.

A retailer receives returned small appliances after a seasonal promotion. The return reason is mixed: some units are unopened, some have damaged packaging but appear functional, and some have reported electrical faults. The company must protect customers, recover value where feasible, and prevent unsuitable stock from re-entering available inventory. Which process is most appropriate?

Correct Answer: A. Segregate returns, inspect and classify condition, route units to suitable resale, repair, supplier return, recycling, or disposal, and update inventory status.
Explanation:

A controlled returns process separates inventory from available-to-promise stock until it has been evaluated. Condition and safety determine whether an item can be resold, repaired, returned, recycled, or disposed of, and the system status must reflect the disposition. A does not adequately address reported electrical faults. C discards recoverable value without assessment. D risks shipping defective or unsuitable units and relies on an ineffective downstream check.

Question 11

New Multiple answers

Topic: Plan, Manage, and Execute Detailed Schedules

Skill tested: Sequences finite production schedules using constraints, setup effects, and material readiness.

A job shop must schedule several orders through a constrained work center for the coming week. Each order has a customer due date, different processing time, and sequence-dependent setup requirements. One order has all materials available, while another is waiting for a critical component with an uncertain arrival date. The supervisor wants a schedule that is executable, limits avoidable setup loss, and makes service risk visible rather than relying on nominal due dates alone. Which TWO actions should the scheduler take? Select TWO.

Correct Answer: A. Check material readiness and resource capacity before committing orders to the detailed schedule.; E. Sequence feasible orders using the relevant due-date and setup trade-offs, then monitor progress and revise when conditions change.
Explanation:

A useful detailed schedule must be executable, so material readiness and finite capacity need to be checked before release. Among feasible orders, the scheduler should balance due-date performance with sequence-dependent setup consequences and then manage exceptions as actual conditions change. C creates an infeasible plan. D can reduce setups while missing customer commitments. E confuses stability with rigidity; a schedule needs controlled updates when material or operating conditions change.

Question 12

New Single answer

Topic: Plan, Manage, and Execute Detailed Schedules

Skill tested: Coordinates incoming-material schedules with production requirements and supplier delivery constraints.

A production line runs with little space for incoming material, and several suppliers deliver by appointment. One critical component is consumed daily, while another arrives in large lots and can block the receiving area. Recent shortages have occurred even though total weekly deliveries were adequate, because arrivals did not match the production sequence. What is the best improvement to the incoming-material schedule?

Correct Answer: A. Coordinate delivery timing and quantities with the production schedule, supplier lead times, and receiving capacity, while monitoring exceptions.
Explanation:

Incoming-material scheduling should synchronize deliveries with actual production needs and the facility's receiving and storage constraints. Coordinated timing and quantities can reduce shortages and congestion without requiring blanket inventory increases. A concentrates volume and can overwhelm both space and handling capacity. C raises working capital and may not resolve congestion. D sacrifices coordination and makes it more likely that receipts will arrive at the wrong time or exceed receiving capacity.

Question 13

New Single answer

Topic: Plan and Manage Distribution

Skill tested: Prioritizes customer orders using allocation rules, available inventory, and promised delivery commitments.

A distributor has a short-term shortage of a popular item after a supplier shipment is delayed. Several customer orders are due, including a contractual customer with a committed delivery window and routine orders from long-standing accounts. The sales team requests that its newest, highest-revenue prospect receive all available units, while customer service asks planners to preserve the original promise dates. The company has documented allocation rules and wants to minimize both contractual exposure and arbitrary treatment. What should the planner do?

Correct Answer: C. Apply the established allocation and priority rules, assess order commitments, and communicate feasible revised dates for affected orders.
Explanation:

Documented allocation rules provide a consistent basis for managing constrained supply, while contractual commitments and customer impact must be considered in the order-level decision. Planners should communicate credible revised dates where the available inventory cannot meet all promises. A substitutes sales preference for governance and may breach commitments. C ignores agreed priorities. D may unnecessarily delay customers who could be served now and does not resolve the allocation decision.

Question 14

New Multiple answers

Topic: Manage Quality, Continuous Improvement, and Technology

Skill tested: Uses process data and root-cause methods to reduce recurring defects and verify improvement.

A packaging operation has a rising rate of damaged cartons. Defects appear concentrated on one shift, but the plant has not confirmed whether the cause is equipment condition, material variation, or work-method differences. Leaders are considering purchasing an automated inspection system. They want to reduce defects sustainably and avoid investing in technology before identifying the process failure. Which TWO actions should be taken first? Select TWO.

Correct Answer: A. Investigate likely causes with the operators and test corrective actions, then monitor results against a baseline.; C. Define the defect and collect consistent, stratified data by shift, equipment, material lot, and operating conditions.
Explanation:

A sound improvement effort first defines the problem and establishes reliable data that can reveal patterns across shifts, equipment, materials, and conditions. Root-cause investigation and controlled corrective-action trials then address the process, with results compared to a baseline. C detects defects but does not prevent their cause and commits to technology prematurely. D relies on containment and waits for external evidence. E changes multiple factors at once, making it difficult to determine which change produced an effect.