Free ASQ Six Sigma Green Belt CSSGB Exam Questions

Last updated: · 12 practice questions with answers and explanations

Page: 1 / 14 Total 200 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: I. Overview: Six Sigma and the Organization

Skill tested: Connects project selection and process metrics to organizational goals and customer value.

A regional medical-supply distributor has seen declining customer satisfaction because orders arrive late, while leadership is also concerned about rising operating costs. A proposed project would reduce order-to-delivery time, but its initial charter measures only warehouse picking speed. The process crosses sales, inventory, and transportation, and no single department controls the full customer outcome. Before approving the project, what is the best action to ensure that it supports organizational goals?

Correct Answer: A. Link the project charter to customer delivery performance and cost goals, define end-to-end process measures, and obtain cross-functional ownership.
Explanation:

A Six Sigma project should connect its measures and scope to organizational drivers such as customer satisfaction, efficiency, and cost. Because the customer outcome depends on a process spanning several functions, end-to-end measures and cross-functional ownership are needed; improving picking speed alone could simply shift delays downstream. A company-wide effort is too broad for a manageable project, and optimizing transportation cost before considering delivery performance risks worsening the stated customer problem.

Question 2

New Single answer

Topic: II. Define Phase

Skill tested: Uses SIPOC and stakeholder analysis to define cross-functional process boundaries and customers.

A bank wants to reduce the time required to resolve disputed debit-card transactions. The proposed team has representatives from customer service and investigation, but the current draft charter begins when an investigator opens a case and ends when the investigator enters a decision. Customers, however, judge the experience from their first contact until they receive the resolution, and payment operations sometimes performs a final adjustment. No reliable baseline has yet been collected. What should the team do FIRST in the Define phase?

Correct Answer: A. Develop a SIPOC with the end-to-end boundary, identify the affected customers and process owners, and validate the scope with stakeholders.
Explanation:

The draft boundary excludes customer contact and payment operations, even though both affect the outcome customers experience. A SIPOC and stakeholder review can establish suppliers, inputs, process steps, outputs, customers, owners, and a defensible end-to-end scope before measurement begins. Setting a target or launching a productivity change before scope is agreed risks optimizing only one function. A control chart requires suitable data and a defined measure, while a competitor target does not resolve the boundary problem.

Question 3

New Multiple answers

Topic: II. Define Phase

Skill tested: Translates voice-of-customer evidence into measurable critical-to-quality requirements.

A software-support organization is defining a project to improve resolution of high-priority incidents. Interviews repeatedly include phrases such as "keep us informed," "fix it quickly," and "do not make us repeat information." The project team must convert these statements into requirements that can be measured consistently across different support agents. It cannot treat satisfaction scores alone as proof that every requirement is met. Which TWO actions are most appropriate? Select TWO.

Correct Answer: A. Translate each customer statement into an operational definition with a measurable indicator, such as update interval or time to resolution.; D. Validate the proposed CTQs with representative customers and distinguish customer requirements from internal solution preferences.
Explanation:

Voice-of-customer statements must be translated into operational, measurable CTQs, then validated to ensure they represent customer needs rather than assumptions about solutions. Indicators such as time to resolution and update interval can be defined with clear start points and recording rules. A satisfaction average is too aggregated to prove each requirement is met. Prescribing a workflow prematurely confuses a possible solution with the need, and counting phrases without operational definitions produces inconsistent data.

Question 4

New Single answer

Topic: III. Measure Phase

Skill tested: Selects and interprets an attribute measurement-system study for defect classification.

A packaging plant classifies each sealed pouch as acceptable or defective based on whether a seal leak is detected. Three inspectors independently evaluate the same set of 40 pouches twice, in randomized order, using the production inspection method. The team wants to determine whether inspection decisions are repeatable for each inspector and reproducible across inspectors before using defect rates to compare shifts. Which analysis is most appropriate?

Correct Answer: A. A crossed attribute agreement analysis comparing each inspector's repeated ratings and agreement among inspectors.
Explanation:

The measurement is an attribute classification, and the repeated, randomized evaluations allow the team to assess within-inspector repeatability and between-inspector reproducibility. A crossed attribute agreement analysis is suited to this design and can also compare decisions with a reference standard if one is established. Variable gage R&R applies to continuous measurements, not the accept/defective judgment. ANOVA of repeated ratings ignores their categorical nature and dependence, while detector pressure capability does not evaluate the inspectors' classification system.

Question 5

New Multiple answers

Topic: III. Measure Phase

Skill tested: Applies probability rules to independent events and combinations without replacement.

A quality engineer reviews a shipment containing 20 circuit boards, of which 4 have a known cosmetic defect. Two boards are selected at random without replacement for an audit. The engineer needs to calculate both the probability that both selected boards are defective and the number of distinct two-board samples that could be selected from the shipment. Which TWO statements are correct? Select TWO.

Correct Answer: B. The number of distinct two-board samples is 20 choose 2, because the order of the two boards does not matter.; D. The probability that both boards are defective is (4/20) × (3/19).
Explanation:

Without replacement, the first defective selection leaves 3 defective boards among 19, so the joint probability is (4/20)(3/19). The draws are dependent, making the repeated 4/20 multiplication incorrect. For distinct samples where order does not matter, the count is the combination 20 choose 2, not the ordered product 20 × 19. The events are not mutually exclusive: both selected boards can be defective.

Question 6

New Single answer

Topic: IV. Analyze Phase

Skill tested: Interprets regression significance and distinguishes association from causal evidence.

A delivery company analyzes 48 weeks of data and models late-delivery percentage as a function of average weekly rainfall. The fitted slope is positive, with a p-value of 0.01 and a strong correlation. Dispatch managers propose reducing the number of routes on rainy days because they believe fewer routes will cause the late-delivery rate to fall. The dataset contains no measurements of traffic, volume, driver availability, or route changes, and no intervention was conducted. What is the most defensible conclusion?

Correct Answer: A. The analysis supports a statistically significant association in these data, but it does not establish that changing route count will cause an improvement.
Explanation:

A p-value of 0.01 provides evidence against a zero slope under the fitted model, indicating a statistically significant association in this sample. It does not establish causation or justify the proposed route intervention: omitted factors such as traffic and delivery volume may confound the relationship, and the analysis did not manipulate route count. Observational data can still yield a statistically significant estimate, so B is incorrect. Strong correlation does not rule out other explanations.

Question 7

New Single answer

Topic: IV. Analyze Phase

Skill tested: Chooses an appropriate hypothesis test for comparing mean outcomes across multiple groups.

A manufacturer compares the mean tensile strength produced by four curing temperatures. Independent samples of material are collected at each temperature, the response is continuous, and process conditions are otherwise held stable. The engineering team wants to test whether any temperature produces a different mean strength while controlling the overall false-positive risk for the comparison. Which analysis should be used first?

Correct Answer: C. Use a one-way ANOVA to test whether the four population means are all equal.
Explanation:

One-way ANOVA is the appropriate initial test for comparing a continuous response across four independent groups. Its overall test evaluates whether all population means are equal while avoiding the inflated familywise error that would result from unadjusted pairwise t-tests. If the ANOVA is significant, suitable follow-up comparisons can identify which temperatures differ. A chi-square test requires categorical data, and an F-test for variances addresses dispersion rather than differences in means.

Question 8

New Single answer

Topic: V. Improve Phase

Skill tested: Interprets factorial-design interaction plots to select a factor combination.

A coating line runs a designed experiment with two factors: oven temperature (low or high) and conveyor speed (slow or fast). The response is coating adhesion, and higher values are preferred. The interaction plot shows the temperature lines crossing: high temperature improves adhesion at slow speed, but reduces adhesion at fast speed. The team must recommend settings for the next confirmation run and cannot assume that the independent best main-effect settings will work together. What should it do?

Correct Answer: D. Select a combination based on the observed simple effects, then run a confirmation trial under that combination.
Explanation:

Crossing lines indicate an interaction: the effect of temperature depends on conveyor speed. Therefore, marginal main effects cannot reliably identify the best joint settings. The team should compare the observed combinations using their response values, select the promising combination consistent with the objective, and confirm it in a subsequent run. Choosing factor levels independently or averaging settings can miss the interaction and may create an untested condition.

Question 9

New Multiple answers

Topic: V. Improve Phase

Skill tested: Selects Lean countermeasures that address recurring setup loss and prevent operating errors.

A fabrication cell loses substantial production time when operators change between product families. The changeover sequence varies by operator, tools are often missing from the work area, and one adjustment is frequently set incorrectly before the first acceptable part is produced. Demand is variable, so producing large batches in advance would increase work in process. Which TWO improvement actions best address the described causes without creating excess inventory? Select TWO.

Correct Answer: B. Use a mistake-proofing feature or verification step to prevent or immediately detect the incorrect adjustment.; D. Standardize the changeover sequence and prepare required tools and materials through workplace organization and visual controls.
Explanation:

Standard work and organized, visually controlled tools reduce variation and wasted searching during setup. A mistake-proofing feature or an effective verification step addresses the recurring incorrect adjustment at its source. Large buffers and larger batches may conceal the problem but conflict with variable demand and increase inventory. Final inspection detects defects only after the setup error has affected production; it does not prevent or reliably reduce the underlying loss.

Question 10

New Single answer

Topic: VI. Control Phase

Skill tested: Selects an attribute control chart based on varying sample sizes and defect proportions.

After improving an invoice-review process, a finance team monitors the fraction of invoices with at least one error. Each day, auditors inspect a different number of invoices because daily volume varies substantially. Each invoice is classified as error-free or containing an error; the team does not count the number of separate errors on an invoice. Which control chart is most appropriate for monitoring process stability?

Correct Answer: C. A p chart, because the proportion of erroneous invoices is monitored with varying sample sizes.
Explanation:

A p chart monitors the proportion of nonconforming units and accommodates varying subgroup sizes, which matches the daily error fraction and changing audit volume. An np chart is designed for the count of nonconforming units with a constant sample size. A c chart monitors defect counts per constant inspection unit, not the fraction of invoices with at least one error. X-bar and R charts require continuous measurements rather than binary invoice classifications.

Question 11

New Multiple answers

Topic: VI. Control Phase

Skill tested: Develops control-plan responses that sustain a stable improvement and assign operational ownership.

A call center has reduced repeat contacts by introducing a standardized case-closure checklist. The team has demonstrated improvement, but it will disband next month. Supervisors need a practical control plan that identifies how the process will be monitored and what to do if performance deteriorates. The center already has a reliable daily count of repeat contacts and a clear operational owner. Which TWO control-plan elements are most important to establish? Select TWO.

Correct Answer: A. Define the process owner's responsibility for maintaining the checklist and reviewing performance, with documented corrective-action escalation.; C. Specify the repeat-contact measure, its data source and frequency, the responsible owner, and an agreed response to a meaningful signal of deterioration.
Explanation:

A sustainable control plan defines the measure and data-collection method, monitoring frequency, process owner, and a pre-agreed response when performance signals a problem. Assigning responsibility for checklist maintenance and escalation ensures the improvement is embedded in daily operations after the project team leaves. Ad hoc decisions create inconsistent responses. Control limits are derived from process behavior and are not automatically customer specification limits, and monitoring should not stop merely because the project ends.

Question 12

New Single answer

Topic: III. Measure Phase

Skill tested: Selects a sampling distribution and standard error for a confidence interval on a mean.

A laboratory is establishing a confidence interval for the mean fill volume of a new product. The fill-volume population is approximately normal, the sample is random, and the population standard deviation is unknown. Only 12 containers have been measured, and the team must quantify uncertainty without substituting the sample standard deviation as if it were the known population value. Which method is appropriate?

Correct Answer: B. Use a Student's t interval with 11 degrees of freedom and standard error s divided by the square root of 12.
Explanation:

With a small random sample from an approximately normal population and an unknown population standard deviation, the confidence interval for the mean uses Student's t with n - 1 = 11 degrees of freedom and standard error s/√n. The standard normal method is appropriate when the population standard deviation is known or when justified by large-sample conditions, not simply because the data appear normal. Chi-square intervals apply to population variance under normality, while Poisson models count data rather than continuous fill volume.