Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Atlassian Managing Jira Projects for Cloud Exam ACP-620 Exam Questions

Last updated: · 14 practice questions with answers and explanations

Page: 1 / 6 Total 56 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Project Creation

Skill tested: Select a Jira project type based on configuration ownership and team autonomy requirements.

A product organization is onboarding a newly formed team that needs its own backlog, board, and issue types. The team should be able to adjust its workflow and project settings without changing configurations used by other teams. A central Jira administrator must still retain platform-level administration, and the team does not need to share a standardized workflow with existing projects. Which implementation best meets these requirements?

Correct Answer: C. Create a team-managed project and grant the team appropriate project access.
Explanation:

A team-managed project is suited to a team that needs to manage project-level configuration independently, including its own issue types and workflow settings. Project access can be granted to the team without granting platform-wide Jira administration. A separate board in an existing project does not provide the requested configuration isolation. Company-managed projects use schemes and configurations administered centrally; granting global Jira administration or exposing shared configuration management is excessive and violates the stated boundary.

Question 2

New Single answer

Topic: Project Creation

Skill tested: Choose issue hierarchy levels that represent initiatives, deliverable work, and child tasks.

A company-managed delivery project needs to represent three distinct layers: a large feature grouping several deliverables, the deliverables themselves, and small implementation steps that must be tracked beneath individual deliverables. The organization wants these layers to use Jira's standard issue hierarchy rather than custom hierarchy levels. Which issue-type structure should the project use?

Correct Answer: A. Use epics for the large grouping, standard issue types for deliverables, and subtasks beneath the standard issues.
Explanation:

In Jira's standard hierarchy, epics group standard-level work, while subtasks are children of standard issues. This structure represents the requested grouping, deliverables, and implementation steps without introducing custom hierarchy levels. An epic is not the standard parent for subtasks, so placing subtasks directly beneath an epic is unsuitable. The other arrangements invert the hierarchy or place a higher-level issue beneath a lower-level issue.

Question 3

New Single answer

Topic: Project Creation

Skill tested: Configure project details and sidebar navigation without changing project permissions.

A project lead has been asked to correct the project description and make the Releases section easier for delivery managers to find. The project uses company-managed configuration, and the lead has permission to administer this project but is not a Jira administrator. The lead must not change who can access the project or modify shared schemes. What is the most appropriate approach?

Correct Answer: C. Edit the project details and adjust the project sidebar navigation using the project's settings.
Explanation:

Project administration supports managing project-specific details and navigation, subject to the administrator's granted permissions. Updating the description and sidebar directly addresses the request without changing access or shared schemes. A permission-scheme change is unnecessary because access is not the problem, and recreating the project adds risk. The global navigation is not the project sidebar, and workflow schemes do not control project descriptions or whether the Releases navigation entry is presented.

Question 4

New Multiple answers

Topic: Board Configuration

Skill tested: Design a cross-project Scrum board filter and quick filters for a multi-team view.

Two delivery teams work in separate Jira projects but use a common Scrum board for quarterly planning. The board should include only active work from both projects, and users should be able to quickly narrow the backlog to one team or to unassigned work. The underlying projects and their workflows must remain independent. Which TWO configuration actions best meet these requirements? Select TWO.

Correct Answer: B. Add quick filters that further restrict the board filter, such as a project/team criterion and an assignee-is-empty criterion.; E. Create a saved filter that selects the required issues from both project keys, and create the Scrum board from that filter.
Explanation:

A cross-project board can be based on a saved filter that selects issues from multiple projects, while the projects retain separate workflows and administration. Quick filters further narrow the issues already selected by the board filter, making team-specific and unassigned views practical. Moving issues is unnecessary and would disrupt project ownership. Quick filters cannot add issues excluded by the board filter, and a cross-project board does not require the projects to share a workflow.

Question 5

New Single answer

Topic: Board Configuration

Skill tested: Map workflow statuses to board columns and identify unrepresented statuses.

A Scrum team has workflow statuses To Do, Selected, In Progress, Code Review, and Done. Its board has columns Backlog, In Progress, and Done. During review, issues in Code Review appear in the board's unmapped-status area instead of in the active-work column. The team wants those issues visible in progress without changing the workflow, and wants to avoid creating a new status. What should the board administrator do?

Correct Answer: B. Map the Code Review status to the existing In Progress column in the board's column configuration.
Explanation:

Board columns are visual groupings of workflow statuses. Mapping Code Review to the existing In Progress column makes those issues appear in the intended board area without altering the workflow or introducing another status. Creating a column is possible but unnecessary when the team wants the existing In Progress view. Removing a workflow status and moving issues changes the process, while a quick filter only narrows displayed issues and does not map statuses to columns.

Question 6

New Multiple answers

Topic: Board Configuration

Skill tested: Distinguish board-filter scope, sub-filters, and quick-filter behavior.

A Kanban board is driven by a saved filter that includes issues from several projects. A service owner asks for two views: a stable board scope limited to work with a particular component, and optional one-click views for a selected assignee or high-priority work. The owner also wants to understand what happens if the saved filter is edited. Which TWO statements are accurate? Select TWO.

Correct Answer: B. A board sub-filter can further restrict the issues displayed within the board's saved-filter scope.; C. Quick filters are optional JQL-based views that narrow the issues already selected for the board.
Explanation:

A sub-filter can narrow the board's base scope, and quick filters provide optional ways to further narrow the displayed issues, such as by assignee or priority. Neither mechanism expands the board beyond issues selected by its underlying filter. Editing the saved filter can change the board's issue scope because the board depends on that filter. A board does not have to become project-specific to use a sub-filter.

Question 7

New Single answer

Topic: Board Configuration

Skill tested: Select the appropriate estimation statistic for Scrum planning and sprint reporting.

A Scrum team estimates work in story points and uses a Scrum board to plan sprints. A new board administrator is considering changing the estimation statistic to Original Time Estimate because some issues have time estimates. The team wants sprint planning and velocity reporting to reflect its established story-point estimates, while preserving time tracking data for operational use. What is the best configuration?

Correct Answer: B. Set the board estimation statistic to Story Points and leave the time-tracking fields available for their separate purpose.
Explanation:

The board's estimation statistic determines the unit used for estimation and related Scrum planning and reporting. Selecting Story Points preserves the team's established estimation practice; the presence of time-tracking fields does not require replacing that statistic. Original Time Estimate would shift the board's estimation basis to time, while issue count would discard the team's story-point measure. The team can continue recording time-tracking information independently of the board's estimation statistic.

Question 8

New Single answer

Topic: Managing Projects

Skill tested: Apply project roles and permissions using least-privilege project administration.

A project has a project role named Release Coordinators. Members must be able to create and edit versions, but they must not manage project details, components, or project permissions. The current permission scheme grants Administer Projects to a broader group that should retain its access. Which change most narrowly satisfies the requirement?

Correct Answer: A. Grant the Release Coordinators project role the permissions needed to manage versions, without granting Administer Projects.
Explanation:

Project permissions can be granted to project roles, allowing the required version-management capability to be assigned to Release Coordinators without broad project administration. Administer Projects is significantly broader than the stated need, and Jira administrator is a global privilege that is even less appropriate. Adding users to an existing administrator group provides no least-privilege control and leaves them able to access unrelated project settings.

Question 9

New Single answer

Topic: Managing Projects

Skill tested: Assess how unreleased version scope changes affect release tracking and reporting.

A release manager has created version 4.2 and linked several issues to it. Before the version is released, testing reveals that one issue will not be included. The issue must remain open and continue to be tracked, while release reports should no longer count it as part of version 4.2. What should the release manager do?

Correct Answer: D. Change the issue's Fix Version/s to the appropriate later version or clear the field if no release is committed.
Explanation:

Fix Version/s identifies the release in which the issue is intended to be delivered, so changing or clearing that field removes the issue from version 4.2's planned scope while keeping the issue open. Deleting the issue is unnecessary. Releasing version 4.2 would falsely report a completed release, and Affects Version/s records versions in which a problem affects users rather than the planned delivery version.

Question 10

New Multiple answers

Topic: Managing Projects

Skill tested: Select Agile reports that reveal sprint outcomes and cumulative flow bottlenecks.

A delivery manager wants to answer two questions for a Scrum team: whether a completed sprint met its commitment, and where work has been accumulating across workflow stages over the last several weeks. The manager has access to the team's board reports but does not need a forecast for a future release. Which TWO reports are the best fit? Select TWO.

Correct Answer: B. Sprint Report, to review completed-sprint work and scope changes against the sprint plan.; D. Cumulative Flow Diagram, to inspect work distribution over time and identify growing queues.
Explanation:

The Sprint Report summarizes a sprint's completed and incomplete work and helps reveal scope changes, making it appropriate for reviewing sprint outcomes against the plan. The Cumulative Flow Diagram shows issue counts across workflow states over time and can expose growing bottlenecks. A Version Report concerns release progress, not sprint commitment. A Control Chart focuses on cycle or lead time, while a Velocity Chart summarizes completed estimation over sprints rather than the location of accumulating work.

Question 11

New Single answer

Topic: Automation

Skill tested: Configure an automation rule that updates a related issue through a branch.

When a bug is transitioned to Done, a project wants to set a related task's status field to a specified value if that task is linked to the bug. The project automation rule can be edited by a project administrator, and the rule actor has permission to edit issues but not to transition them. The linked task's workflow requires a transition to change its status. What is the best rule design?

Correct Answer: D. Use an issue-transition trigger, branch to linked issues, and perform an available workflow transition on each linked issue.
Explanation:

The trigger can detect the bug's transition to Done, and a related-issues branch can run the action in the context of each linked issue. Since workflow status changes are governed by transitions, the rule should execute an available transition rather than directly edit the Status field. The rule actor must have the necessary transition permission as well as access to the linked issue; its stated lack of transition permission must be corrected. A schedule or comment does not implement the required event-driven transition.

Question 12

New Multiple answers

Topic: Automation

Skill tested: Diagnose common automation failures involving rule scope, actor permissions, and branching.

An automation rule is intended to run when an issue enters In Progress, then update every issue linked to it. The audit log shows the rule triggered successfully, but no linked issue changes. The project administrator confirms that the related issues are within the rule's project scope and that the rule's branch condition matches the link type. What TWO checks should be prioritized? Select TWO.

Correct Answer: C. Verify that the rule has a suitable related-issues branch and that the edit action is configured in that branch's issue context.; D. Verify that the rule actor has permission to edit the linked issues and that issue security does not prevent access.
Explanation:

A successful trigger does not prove that later actions can access or edit related issues. The automation actor needs the relevant issue permissions, and issue security can also prevent access. The rule must branch to related issues and place the edit action within that branch so it operates on each linked issue rather than the trigger issue. Transition triggers can start automation rules, board quick filters do not control rule issue lookup, and granting global administration to all users is insecure and unnecessary.

Question 13

New Single answer

Topic: Automation

Skill tested: Choose a filter subscription to notify users when saved JQL criteria match issues.

A support operations lead wants a daily email to a defined group whenever unresolved issues meet a saved JQL filter for a particular component and priority. The lead does not require a field update, workflow transition, or immediate notification after every change. The group already has access to the matching issues. Which approach is most appropriate?

Correct Answer: A. Create a filter subscription for the saved filter and configure its recipient and schedule.
Explanation:

A filter subscription is designed to send scheduled notifications based on the results of a saved filter, matching the need for a daily email to a defined group without modifying issues. An automation rule that transitions issues would introduce unwanted workflow changes, and a post function tied to issue changes would not provide the requested scheduled filter-based summary. Quick filters only change what a user sees on a board; they do not send subscriptions.

Question 14

New Single answer

Topic: Reporting

Skill tested: Construct JQL using fields, operators, and functions to filter assigned work by project and status.

A delivery analyst needs a reusable filter for unresolved work in project ORION that is assigned to members of the user's current team. The Jira site has a team field that supports the membersOf() function, and the analyst wants the results ordered by priority first and then by oldest update. Which JQL best meets the requirement?

Correct Answer: B. project = ORION AND resolution = Unresolved AND assignee in membersOf("current-team") ORDER BY priority DESC, updated ASC
Explanation:

The filter combines project scope, unresolved issues, and membership-based assignee selection with AND, then orders by descending priority and ascending update time. In Jira, resolution = Unresolved is commonly used to identify unresolved issues, including issues in statuses other than a particular named status. B uses OR and incorrect function comparison, broadening the results; C selects completed work and reverses the requested ordering; D excludes unresolved issues and sorts by a different field.