Question 1

New Single answer

Topic: Implementation Preparation

Skill tested: Selects AAMS media-server deployment options for SIP-enabled AACC implementations.

A contact center is being designed for SIP-enabled voice routing through Avaya Aura Contact Center (AACC). The customer already operates an Avaya Aura environment and wants to use Avaya Aura Media Server (AAMS) for media services. The initial deployment is a single AACC site, and the customer has not required media-server redundancy in this phase. The design team must avoid assuming that an existing AAMS is automatically suitable; it must confirm that the selected media-server arrangement is supported and configured for the intended AACC integration. Which design decision is most appropriate before proceeding with the AACC installation?

Correct Answer: C. Plan the SIP-enabled AACC integration with a supported AAMS deployment and validate the required connectivity and configuration for the site.
Explanation:

A SIP-enabled AACC design must account for the media-server role and ensure the selected AAMS deployment is suitable for the AACC integration. Confirming the supported arrangement and required connectivity before installation prevents a design based on an assumed, unverified media path. AAMS is not a replacement for agent desktop software or generic Windows audio services. An existing enterprise AAMS may be reusable, but its presence alone does not establish that it is correctly configured or appropriate for this contact-center deployment.

Question 2

New Single answer

Topic: Implementation Preparation

Skill tested: Evaluates AACC server hardware against the selected installation requirements.

A customer is preparing a production AACC installation on Windows Server 2012. A proposed server was selected because it has ample disk capacity, but its processor, memory, and other specifications were chosen from a similarly sized non-Avaya application server rather than the AACC requirements. The customer wants to avoid purchasing additional hardware after the installation begins, and the project is not permitted to rely on unsupported configurations. What should the implementation specialist do first?

Correct Answer: B. Compare the complete server configuration with the applicable AACC hardware requirements and revise the proposal where necessary.
Explanation:

AACC server suitability must be established against the applicable product hardware requirements before installation. Processor, memory, storage, and other specified characteristics all matter; excess disk capacity cannot compensate for an unsupported configuration elsewhere. Installing first and assessing performance later risks building an unsupported system and creating costly rework. Changing the operating system does not resolve an unverified hardware design and may introduce another compatibility issue.

Question 3

New Multiple answers

Topic: Implementation Preparation

Skill tested: Identifies prerequisites for integrating AACC with Avaya Aura UC components.

An organization is adding AACC to an existing Avaya Aura Unified Communications platform. The voice team has confirmed that the platform is already in service, but the project has not yet verified whether its components, network relationships, and integration settings meet the AACC design. The implementation window is short, and the customer requires a supported configuration rather than trial-and-error commissioning. Which two activities should the team complete during preparation before installing and integrating AACC? Select TWO.

Correct Answer: A. Verify the relevant Avaya Aura components and their supported relationship to the planned AACC deployment.; D. Confirm the required integration prerequisites and connectivity between the AACC and UC platform components.
Explanation:

Preparation requires both confirming that the existing Avaya Aura components fit the planned AACC architecture and verifying the integration prerequisites, including the relevant connectivity and configuration. These checks reduce commissioning risk and avoid discovering incompatibilities during a constrained installation window. An agent login occurs too late to serve as a prerequisite check. A single endpoint registration does not validate all platform relationships, and disabling existing services is not a substitute for planned integration.

Question 4

New Single answer

Topic: Installation

Skill tested: Plans AACC installation and Ignition Wizard configuration in the required sequence.

During a new AACC deployment, the installation team has completed the operating-system preparation and is ready to install the application. The site configuration values and system roles have been reviewed, but the team proposes to skip the Ignition Wizard to save time and enter only the settings it remembers from a previous site. The customer wants a repeatable installation that matches the current design and can be commissioned without undocumented assumptions. What is the best implementation approach?

Correct Answer: A. Use the Ignition Wizard as part of the installation, supplying the values verified for this deployment.
Explanation:

The Ignition Wizard is part of establishing the intended AACC installation configuration. Using values verified against the current design gives the installation a deliberate, consistent foundation and avoids relying on memory or another site's assumptions. Skipping it and postponing configuration until a failure occurs can leave required settings incomplete. Reusing prior values without validation is risky because deployment-specific details may differ.

Question 5

New Multiple answers

Topic: Installation

Skill tested: Assesses the installation impact of service updates and subsequent AACC patches.

A project plan calls for installing AACC from its installation media and applying maintenance afterward. The team has identified a Service Update intended for the installation process and a separate AACC patch package intended for a system that is already installed. The maintenance window is limited, and the customer requires the team to preserve the intended installation sequence rather than treating all update packages as interchangeable. Which TWO statements should guide the plan? Select TWO.

Correct Answer: C. Determine the effect and required placement of the Service Update in the installation workflow before starting the installation.; E. Treat the post-installation patch as a separate maintenance action and follow its applicable installation instructions after AACC is installed.
Explanation:

Service Updates can affect the installation workflow, so their applicability and required timing must be established before the installation begins. A patch specified for an already installed AACC system is a distinct post-installation task and must be applied according to its own instructions. Applying packages before the operating system is in place or assuming the installer automatically handles all updates ignores the package's intended context. The names alone do not make the two maintenance mechanisms interchangeable.

Question 6

New Single answer

Topic: Installation

Skill tested: Distinguishes AAMS high-availability design from a non-HA deployment.

A contact center requires SIP media services to remain available if one media-server instance becomes unavailable. The proposed design installs one AAMS and labels it "high availability" because the AACC system itself has a standby server. The customer will not accept a design in which a single media-server failure removes the media service, and the implementation must address the AAMS layer explicitly. Which action best satisfies the requirement?

Correct Answer: B. Implement the supported AAMS high-availability solution and validate the media-server redundancy and integration.
Explanation:

High availability must be designed at the AAMS layer when the requirement is to tolerate a media-server instance failure. AACC standby protects AACC availability but does not, by itself, turn a single AAMS into a redundant media-server deployment. Agent desktop software is not a media-server failover mechanism. The non-HA AAMS design does not satisfy the explicit requirement, regardless of AACC server redundancy.

Question 7

New Single answer

Topic: Installation

Skill tested: Plans AACC high availability with installation and configuration dependencies in mind.

A customer requires an AACC high-availability deployment with active and standby systems. The implementation team has prepared the primary server but has not yet confirmed that the standby server, network configuration, and HA-specific installation prerequisites are aligned with the intended design. The project manager suggests installing the primary as a standalone system first and "adding HA later," although no approved conversion plan has been established. What is the most appropriate next step?

Correct Answer: C. Confirm the supported HA design, prerequisites, and coordinated configuration for both systems before proceeding.
Explanation:

AACC HA depends on a deliberately prepared and coordinated deployment, including the required server and network configuration. The team should verify the supported HA procedure and prerequisites for both systems before committing to a standalone installation that may not be suitable for later conversion. A standby server does not automatically discover or configure itself, and AAMS redundancy addresses media-server availability rather than AACC server HA.

Question 8

New Single answer

Topic: Configuration

Skill tested: Configures agent workstation software dependencies for AAD and desktop displays.

Agents at a new site will use Avaya Agent Desktop (AAD) and Avaya Desktop Displays (ADD). The workstation image is being prepared centrally, but the desktop team has installed the client applications without checking the AACC-specific workstation requirements or testing the intended configuration against a representative endpoint. The contact-center manager requires a consistent, supportable rollout and does not want agent desktops used as the first troubleshooting environment. What should the implementation team do next?

Correct Answer: D. Validate the required workstation software and configuration, then test AAD and ADD on a representative workstation before rollout.
Explanation:

A controlled workstation rollout requires confirming the required software and configuration for AAD and ADD, then validating the result on a representative client before broad deployment. This exposes dependency or configuration issues early and supports a consistent agent experience. Production-wide deployment makes failures harder to isolate. ADD does not replace AAD, and the scenario provides no basis for assuming AACC automatically installs all workstation prerequisites at login.

Question 9

New Multiple answers

Topic: Configuration

Skill tested: Plans recurring AACC backups and verifies the recovery value of backup files.

A contact center processes configuration changes throughout the week and must be able to recover its AACC database after an operational failure. Backups are currently created manually when an administrator remembers, and the manager wants a repeatable process with evidence that the files can be used for recovery. The organization cannot accept a schedule that depends on one employee's availability. Which TWO actions best address the requirement? Select TWO.

Correct Answer: B. Schedule regular AACC backups using an operationally owned, documented process.; E. Include a validation step that checks backup completion and periodically verifies the restore procedure.
Explanation:

A recurring, documented backup process avoids dependence on an individual remembering to run a manual task. Checking job completion and periodically validating the restore procedure provides evidence that the backup is useful for recovery, not merely that a schedule exists. Installation media does not contain the current site database. A single commissioning backup becomes stale as configuration changes, and an untested backup process does not establish recoverability.

Question 10

New Single answer

Topic: Configuration

Skill tested: Performs CCMA commissioning using deployment-specific configuration and validation.

After AACC installation, an implementation specialist begins CCMA commissioning. Several values are copied from a lab system, and the specialist plans to defer verification of site-specific settings until agents report problems. The production site has a different deployment design, and the customer expects commissioning to establish a usable system before agent acceptance testing. What is the best course of action?

Correct Answer: D. Complete commissioning using values confirmed for the production design and validate the resulting configuration.
Explanation:

Commissioning should establish the production system using the deployment's verified values, followed by validation that the resulting configuration is appropriate. Lab settings are not automatically transferable to a different site, and delaying verification until agents encounter problems increases operational risk. The Ignition Wizard is associated with installation configuration and does not remove the need for post-installation commissioning. Direct reactive changes during live operation are not a controlled commissioning approach.

Question 11

New Single answer

Topic: Implementation Validation

Skill tested: Validates AAD operation using Web Based Statistics and agent activity.

A deployment has completed installation and commissioning, and an agent can sign in to Avaya Agent Desktop (AAD). The contact-center manager is not satisfied with a successful login alone; the acceptance test must provide evidence that AAD is functioning in the configured environment and that agent activity can be observed. Web Based Statistics is available for validation. Which test is the most appropriate?

Correct Answer: A. Have the agent perform a controlled activity and verify the corresponding agent information in Web Based Statistics.
Explanation:

A controlled agent activity followed by checking the corresponding information in Web Based Statistics validates more than application launch or successful authentication: it provides evidence that AAD activity is reflected in the contact-center reporting view. Opening the application alone does not verify operational behavior. Restarting the server is disruptive and is not a meaningful client validation. Accessing CCMA does not establish that AAD agent activity is functioning correctly.

Question 12

New Multiple answers

Topic: Implementation Validation

Skill tested: Tests Orchestration Designer scripts through controlled execution and outcome verification.

A team has created an Orchestration Designer script for a new contact-center interaction. The script compiles or saves successfully in the design environment, but the business owner needs evidence that the interaction follows the intended logic before release. Testing must remain controlled, and the team must be able to distinguish a script defect from a general AACC availability issue. Which TWO validation actions are most appropriate? Select TWO.

Correct Answer: A. Execute the script through a controlled test path that exercises the intended interaction flow.; D. Verify the observed result at the relevant points in the flow against the expected behavior.
Explanation:

A successful save or design-time check does not establish that runtime behavior matches the business requirement. Controlled execution exercises the script in a test path, while checking the resulting behavior against expected outcomes helps localize defects in the script logic. Immediate production release exposes customers to unvalidated behavior. Changing unrelated server settings without evidence can obscure the cause instead of isolating a script problem.

Question 13

New Single answer

Topic: Implementation Validation

Skill tested: Plans an AACC HA active/standby switchover test and verifies service recovery.

An AACC HA deployment is ready for acceptance, but the customer has not yet observed a planned transition between the active and standby systems. The test must demonstrate that the configured HA behavior works while limiting business impact and recording the result. The contact center is operating, so an uncontrolled interruption during peak traffic is unacceptable. What is the best test approach?

Correct Answer: C. Schedule a controlled switchover test, observe the active/standby transition, and verify expected service behavior afterward.
Explanation:

A planned, controlled switchover exercises the actual active/standby behavior while respecting the operational constraint against a peak-period interruption. The team should observe the transition and verify service behavior after it occurs, recording the outcome as acceptance evidence. Installation of both servers does not prove that HA operation works. Simultaneously interrupting both systems does not test a normal active-to-standby switchover and creates unnecessary risk.