Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Avaya Contact Center Select Implementation and Maintenance Exam 78950X Exam Questions

Last updated: · 10 practice questions with answers and explanations

Page: 1 / 7 Total 65 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Architecture

Skill tested: Relates ACCS components to their roles in an integrated contact center solution.

A regional service provider is designing a contact center using Avaya Contact Center Select (ACCS) with IP Office. Its requirements include voice call handling, centralized contact-center treatment, agent and supervisor administration, and access to reporting. The team proposes moving all call-control and contact-center functions into ACCS, leaving IP Office in place only for endpoints. Before approving the design, the architect must clarify the product roles and avoid assigning functions to the wrong component. Which description best reflects the solution architecture?

Correct Answer: A. IP Office provides the telephony platform, while ACCS supplies contact-center capabilities such as routing, agent administration, and reporting integration.
Explanation:

The integrated design uses IP Office as the telephony platform and ACCS to add contact-center capabilities, including contact handling and agent- and supervisor-oriented functions. This division of responsibility is central to a sound deployment. ACCS does not replace IP Office call control, so B reverses the roles. C understates ACCS by restricting it to prompts and reports. D describes conflicting call control rather than a coordinated integration.

Question 2

New Multiple answers

Topic: IP Office Configurations

Skill tested: Identifies the IP Office integration prerequisites for ACCS agent and call handling.

A company has completed the ACCS installation and can reach the IP Office over the network, but agent call control and contact-center handling do not work reliably. The IP Office configuration was copied from a general office deployment and has not been reviewed for ACCS integration. The implementation team wants to verify the telephony-side prerequisites before changing ACCS routing or rebuilding the server. Select the TWO actions that directly address the IP Office integration configuration. Select TWO answers.

Correct Answer: C. Verify that the IP Office is configured with the appropriate ACCS integration settings and that its identity and connection details match those configured for ACCS.; D. Verify the required telephony resources and licensing on IP Office for the intended contact-center operation.
Explanation:

A working integration depends on correctly configured IP Office connection/integration details and on IP Office having the telephony resources and licensing needed for the intended deployment. These are appropriate checks before reworking ACCS applications. B incorrectly assumes ACCS skills are defined in IP Office. D assigns IP Office call control to ACCS scripts and bypasses the intended architecture. E confuses voicemail storage with ACCS prompt and application handling.

Question 3

New Single answer

Topic: Implementation

Skill tested: Selects the appropriate deployment sequence for AAMS, WebLM, and ACCS dependencies.

An implementation team is preparing a new ACCS deployment and must coordinate the supporting Avaya Aura Media Server (AAMS), WebLM licensing, and ACCS installation. The change window is limited, and the team wants to avoid installing a dependent component before its supporting services are available. The deployment plan must also leave time to verify that ACCS can obtain its licenses and use the media services required by the design. Which plan is the most appropriate?

Correct Answer: B. Prepare and verify the supporting AAMS and WebLM services required by the design, then install and configure ACCS and validate service and license connectivity.
Explanation:

A dependent deployment is best planned by preparing the supporting media and licensing services first, then installing and configuring ACCS against those services and validating the resulting connections. This reduces avoidable installation failures and provides an opportunity to confirm licensing before production. A and C defer prerequisites until after installation or production. D incorrectly treats WebLM as an ACCS application component and assumes ACCS replaces AAMS.

Question 4

New Single answer

Topic: Implementation

Skill tested: Chooses secure transport configuration for ACCS-to-IP Office communications.

A contact center is moving from a restricted test network to a production network where traffic between ACCS and IP Office crosses shared infrastructure. The security team requires the link to be protected in transit. The IP Office deployment supports the secure integration method required by the installed ACCS release, and there is no requirement to change routing logic or agent privileges. What should the implementation team do?

Correct Answer: C. Enable the supported secure communication configuration at both endpoints, verify certificate or trust requirements, and confirm that the configured connection uses the protected transport.
Explanation:

Protecting the link requires configuring the supported secure communication mechanism for the ACCS-IP Office connection at both ends and validating the necessary trust settings and actual transport. Securing an unrelated administration or licensing connection does not protect this link. B leaves the traffic unprotected, C confuses separate connections, and D sacrifices the integrated operation rather than securing it.

Question 5

New Multiple answers

Topic: Administration

Skill tested: Configures ACCS agent and supervisor access through appropriate privileges and roles.

A contact center is restructuring access after an audit found that several agents could change configuration and some supervisors lacked access to the operational functions they need. The organization wants agents to perform their assigned contact-handling work, supervisors to perform their authorized supervisory tasks, and only designated administrators to change system configuration. The security team also requires a least-privilege review after changes are applied. Which TWO actions best meet these requirements? Select TWO answers.

Correct Answer: A. Assign each user the appropriate ACCS role or privilege set for the user's operational responsibilities.; C. Separate agent, supervisor, and administrator access according to required functions, and remove privileges not needed by each role.
Explanation:

ACCS access should reflect each user's responsibilities: agents receive agent-level capabilities, supervisors receive the supervisory functions they need, and configuration privileges remain with authorized administrators. Reviewing and removing excess permissions implements least privilege. B grants excessive access and depends on user restraint. D substitutes telephony membership for ACCS application authorization. E prevents accountability and gives agents access through a shared elevated account.

Question 6

New Multiple answers

Topic: Administration

Skill tested: Selects the correct operational workflow for creating and scheduling ACCS reports.

A service manager needs a recurring report for weekly operational reviews. The report must use the relevant contact-center data, be available to the intended recipients, and run on a predictable schedule without an administrator manually generating it each week. The manager is not authorized to change system-wide security or create a new reporting data source. Which TWO steps are the most appropriate? Select TWO answers.

Correct Answer: A. Verify that the manager or intended recipients have the required access to view the report and its output.; C. Select the report and parameters that meet the operational requirement, then configure its recurring schedule using the available reporting administration functions.
Explanation:

Recurring reporting requires selecting appropriate report criteria and configuring the supported schedule, while ensuring intended users can access the resulting report. Those steps meet the recurring operational need without expanding the task into database redesign or broad administration. B introduces an unsupported and unnecessary data architecture change. D produces only a static result. E grants excessive privileges when report access and scheduling should be handled through appropriate permissions.

Question 7

New Single answer

Topic: Administration

Skill tested: Uses Outbound Campaign Management Tool settings to configure an outbound campaign.

A contact center is preparing a small outbound campaign using ACCS. The campaign manager has a defined contact list and business hours, but the first test run attempted to process records outside the intended calling window. The organization wants to configure the campaign through the Outbound Campaign Management Tool and prevent calls from being scheduled outside its approved operating period. Which action is the best next step?

Correct Answer: D. Configure the campaign's applicable operating schedule and calling-window parameters in the Outbound Campaign Management Tool, then validate the campaign with a controlled test.
Explanation:

Outbound campaign behavior should be controlled through the campaign configuration, including the applicable schedule or calling-window settings, followed by a controlled validation. Changing the system clock can disrupt unrelated services and does not correctly configure campaign policy. Manual dialing defeats the campaign requirement, while Prompt Management handles prompts rather than outbound scheduling.

Question 8

New Single answer

Topic: Administration

Skill tested: Modifies and validates an ACCS sample application using Orchestration Designer.

A development team must adapt a supplied ACCS sample application to play a new service message and route callers according to an existing business rule. The team wants to preserve the sample as a recoverable baseline and test the change before making it available to callers. Which workflow is most appropriate?

Correct Answer: C. Use Orchestration Designer to create a working copy, implement the required application changes, validate the application, and then deploy it through the supported ACCS workflow.
Explanation:

Orchestration Designer is used to work with and modify the application flow. Maintaining a separate working copy preserves the original sample, and validating the changed application before deployment reduces the risk of exposing callers to an untested flow. A removes the baseline and skips testing. C changes a different component and does not ensure the ACCS application inherits the modification. D confuses application logic with reporting.

Question 9

New Single answer

Topic: Business Continuity

Skill tested: Plans AAMS high availability using the deployment's supported media-server redundancy configuration.

A contact center relies on AAMS media services and has a business requirement to continue operation if one media server becomes unavailable. The organization can provision a second AAMS and maintain the required network connectivity, but it cannot accept a design that depends on operators manually changing every ACCS media reference during an outage. Which design approach best addresses the requirement?

Correct Answer: C. Configure the AAMS high-availability arrangement supported by the deployment, verify the ACCS media-service references and network reachability, and test failover behavior.
Explanation:

A high-availability design must use the supported AAMS redundancy arrangement, ensure the relevant media services are reachable and correctly referenced, and verify behavior during a failure. Simply installing another instance on the same host does not provide meaningful host-level resilience. A single-server design with manual changes fails the stated recovery constraint, and WebLM provides licensing services, not media-server failover.

Question 10

New Single answer

Topic: Troubleshooting

Skill tested: Diagnoses ACCS license assignment issues using entitlement and service checks.

After a licensing change, ACCS starts successfully, but a newly configured contact-center capability is unavailable. Administrators confirm that the relevant feature was selected in the configuration, yet the expected licensed capacity does not appear. The deployment uses WebLM, and the team wants to identify the licensing fault before altering application settings or rebuilding ACCS. What should the administrator do first?

Correct Answer: D. Check ACCS license assignment and entitlement availability in WebLM, then verify that ACCS can communicate with the configured licensing service.
Explanation:

A feature that is configured but unavailable after a licensing change warrants checking the relevant WebLM entitlement and its assignment or availability, along with ACCS connectivity to the licensing service. These checks distinguish a licensing problem from an application configuration issue. IP Office extension capacity is not a substitute for ACCS licensing. Recreating an application cannot create an entitlement, and AAMS is not the ACCS license assignment service.