Question 1
Your consulting firm has recently been hired to complete a site survey for a company desiring an indoor coverage WI-AN. Your engineers use predictive design software for the task, but the company insists on a pre-design site visit.
What task should be performed as part of the pre-design visit to prepare for a predictive design?
A pre-design site visit in preparation for a predictive wireless LAN design is essential for gathering physical and environmental data about the site. The key tasks to be performed during such a visit include:
Evaluating Building Materials: Different materials (concrete, glass, wood, etc.) have varying effects on RF signal propagation. Understanding the materials present helps in accurately predicting how signals will behave within the environment.
Floor Plan Verification: Ensuring that the floor plan documents are an accurate representation of the actual building layout is crucial. Discrepancies between the floor plans and the physical layout can lead to inaccuracies in the predictive design.
The other options, while potentially valuable in other contexts, are not directly related to preparing for a predictive design:
Installing APs (option A) for testing co-channel interference is more aligned with an active site survey rather than a pre-design visit for a predictive design.
Collecting information about security requirements (option B) is important but is not directly related to the physical aspects of the site that would impact a predictive design.
Testing antenna types (option C) would typically be part of an active site survey or the actual deployment phase, not a pre-design visit for predictive modeling.
Therefore, option D is the correct answer, focusing on evaluating physical aspects crucial for accurate predictive modeling.
CWNA Certified Wireless Network Administrator Official Study Guide: Exam CWNA-109, by David D. Coleman and David
A . Westcott.
Best practices for conducting pre-design site visits in wireless network planning.