Free Exin Agile Scrum Master ASM Exam Questions

Last updated: · 15 practice questions with answers and explanations

Page: 1 / 16 Total 230 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Agile Way of Thinking

Skill tested: Applies empirical feedback to balance delivery predictability with changing requirements.

A financial-services team is building an internal claims portal. Senior leaders want a fixed annual delivery date, while claims staff expect policy changes during development. Earlier projects missed deadlines because teams spent months finalizing requirements before testing a working system. The organization can release increments to a limited group of staff, but regulatory approval is required before broad production use. Which approach best combines useful predictability with the flexibility needed to respond to new information?

Correct Answer: B. Deliver small, reviewable increments, use feedback and measured team capacity to forecast, and reassess priorities regularly.
Explanation:

Incremental delivery makes progress visible and gives claims staff opportunities to provide evidence-based feedback, while measured capacity and regular replanning support forecasts rather than false certainty. Regulatory approval remains a real release constraint; feedback can be gathered through controlled reviews without bypassing it. Fixing all scope upfront recreates the assumptions that caused earlier failures. Delaying forecasts until requirements are stable sacrifices adaptability, and releasing directly to all users ignores the stated approval requirement.

Question 2

New Single answer

Topic: Agile Way of Thinking

Skill tested: Distinguishes Kanban flow management from timeboxed Scrum delivery and role structures.

A support organization receives an unpredictable stream of small requests. Work items vary considerably in size, and urgent incidents regularly interrupt planned work. The organization wants to expose bottlenecks and reduce excessive work in progress. It does not want to introduce fixed-length iterations, formal sprint planning, or Scrum accountabilities because the team must continually pull the next highest-priority request. Which approach best fits these needs?

Correct Answer: A. Use Kanban, visualize the workflow, limit work in progress, and manage flow as work is pulled.
Explanation:

Kanban is suited to managing a continuous flow of variable incoming work. Visualizing workflow and limiting work in progress help reveal bottlenecks and discourage starting more work than the team can complete. Scrum is organized around Sprints and a Sprint Goal, which conflicts with the stated desire for continuous pull-based service. XP provides engineering practices but does not by itself address the requested flow-management model. DSDM's timeboxed project approach is not the best fit for this continuous queue.

Question 3

New Single answer

Topic: Scrum Master accountability

Skill tested: Facilitates impediment removal while preserving the Developers' ownership of their work.

During a Sprint, Developers report that a shared test environment is unstable because another department applies unannounced changes. The team has already isolated the failures and agreed on a temporary testing sequence, but it cannot secure a stable environment without help from department leadership. The Product Owner asks the Scrum Master to take over testing and instruct each Developer on daily assignments so the Sprint Goal can be met. What is the most appropriate response?

Correct Answer: B. Facilitate the team's agreed workaround and work with the other department to resolve the organizational impediment, while leaving task decisions to Developers.
Explanation:

The Scrum Master serves the team by helping remove impediments and enabling effective Scrum use. Here, the team has already selected a temporary technical response; the Scrum Master can support that work and address the external coordination problem. Taking over testing and assigning tasks undermines Developers' self-management. The Product Owner may discuss scope changes with Developers, but automatic removal of items is not the Scrum Master's decision. Waiting until the retrospective allows a known impediment to continue harming progress.

Question 4

New Multiple answers

Topic: Scrum Master accountability

Skill tested: Selects facilitation techniques that improve collaboration without directing team decisions.

A newly formed Scrum Team has productive technical discussions but repeatedly ends refinement sessions with unresolved dependencies and no shared understanding of the next steps. Two senior Developers dominate, while remote colleagues contribute little. The organization requires the Scrum Master to support collaboration, but the Scrum Master must not decide the solution or assign work. Which TWO actions are most appropriate? Select TWO.

Correct Answer: A. Help the participants make dependencies and assumptions visible, then facilitate agreement on follow-up questions and owners.; B. Set a clear purpose and timebox for the session, then use structured turn-taking so every participant can contribute.
Explanation:

A clear purpose and timebox give the session focus, while structured participation can make it easier for remote and less senior members to contribute. Making assumptions and dependencies visible helps the team identify what remains unknown and agree on useful follow-up. Presenting a predetermined design, assigning tasks, or imposing a preferred solution shifts decision-making away from the Developers. Ending discussion at disagreement avoids the collaboration the team needs rather than facilitating it.

Question 5

New Single answer

Topic: Scrum Master accountability

Skill tested: Separates the Product Owner's value decisions from Developers' delivery decisions.

A Product Owner wants a high-value feature included in the next Sprint and gives the Developers a detailed sequence of implementation tasks. The Developers say the sequence ignores a technical dependency and want to choose a different implementation approach. The Scrum Master is asked to settle the disagreement. Which response best respects the Scrum accountabilities while helping the team move forward?

Correct Answer: C. Facilitate discussion so the Product Owner clarifies the desired outcome and value, while Developers determine how to accomplish the work and assess what they can forecast.
Explanation:

The Product Owner is accountable for maximizing product value and ordering the Product Backlog, while Developers decide how to turn selected work into an Increment and create their plan. Facilitating a discussion allows the Product Owner to clarify the outcome and Developers to explain dependencies and technical options. The Product Owner's product accountability does not extend to directing individual implementation tasks. Excluding the Product Owner from planning or having the Scrum Master choose the design would also misuse the accountabilities.

Question 6

New Single answer

Topic: Agile Estimating, Planning, Monitoring and Control

Skill tested: Uses a shared Definition of Done to make Increment quality and completion transparent.

A product group has three Scrum Teams working on the same service. Each team reports a Product Backlog Item as complete under a different standard: one has tested code, another has merged code awaiting integration, and the third has deployed to a test environment. Stakeholders cannot tell which work is genuinely usable, and integration failures appear late. The teams want a consistent basis for inspection without allowing local shortcuts to be hidden in status reports. What should they do?

Correct Answer: D. Agree on a shared Definition of Done that describes the quality state required for an Increment, and make incomplete work visible as not Done.
Explanation:

A shared Definition of Done creates a common, transparent understanding of the quality state required for work to count as part of an Increment. It helps teams and stakeholders inspect progress consistently and exposes integration or testing work that remains. Averaging incomparable status measures conceals rather than resolves the problem. The Product Owner's review does not replace the Definition of Done, and dates alone say nothing about whether the work meets the required quality standard.

Question 7

New Multiple answers

Topic: Agile Estimating, Planning, Monitoring and Control

Skill tested: Improves user stories by expressing user value, acceptance expectations, and manageable scope.

A team maintains a Product Backlog item titled "Upgrade the customer account screen." During refinement, Developers discover that the title does not identify who needs the change, what outcome matters, or how to determine whether the work is complete. The change may involve several unrelated screen behaviors, and the team needs to discuss it with the Product Owner before deciding what to forecast. Which TWO actions best improve this item? Select TWO.

Correct Answer: A. Rewrite it to describe a relevant user or stakeholder, the desired outcome, and the value or reason for the change.; E. Add examples or acceptance expectations that make the intended behavior discussable and testable.
Explanation:

A useful user story communicates who needs something, what outcome is desired, and why it matters; examples or acceptance expectations help clarify behavior without prescribing every implementation detail. These changes support a productive conversation and reveal whether the item needs further refinement or splitting. A detailed design and task assignment prematurely constrain Developers. Increasing an estimate does not resolve missing requirements, and placing an unclear item in a Sprint does not make it ready for effective planning.

Question 8

New Single answer

Topic: Agile Estimating, Planning, Monitoring and Control

Skill tested: Orders Product Backlog items based on value, risk, dependencies, and newly discovered information.

A Product Owner maintains a backlog for a logistics product. A compliance-related change has become urgent because a regulator clarified an upcoming requirement. A high-revenue feature is already near the top, while a low-value technical enabler must be completed before either item can be safely released. The Scrum Master is asked to reorder the backlog before the next planning event. Which action is most appropriate?

Correct Answer: A. Ask the Product Owner to consider the new information, value, risk, and dependency when ordering the items, including the enabler where it supports valuable work.
Explanation:

The Product Owner is accountable for ordering the Product Backlog and should use current information about value, risk, urgency, and dependencies. A technical enabler can be important because it makes valuable or compliant work possible, even if users do not see it directly. Automatically ranking by one factor overlooks trade-offs. Developers' estimates can inform ordering, but effort alone does not determine product value. Freezing the backlog prevents adaptation to the regulator's clarification.

Question 9

New Single answer

Topic: Agile Estimating, Planning, Monitoring and Control

Skill tested: Uses historical velocity as a forecasting aid without treating it as a commitment or individual performance measure.

A Scrum Team has completed five Sprints with varying amounts of work accepted as Done. The Product Owner asks for a forecast of how many similarly sized backlog items could fit into the next Sprint. A manager proposes increasing the team's target by 20 percent because the last Sprint had unusually high output. The upcoming Sprint also includes two new Developers who are unfamiliar with the product. What is the best response?

Correct Answer: A. Average the historical velocities, discuss relevant changes in capacity and uncertainty, and let Developers forecast work for the Sprint.
Explanation:

Historical velocity can help a team forecast the amount of comparable work, but it is not a quota or a guarantee. Considering a range or average alongside known changes - such as new team members - produces a more responsible forecast, which Developers make during Sprint Planning. Using the highest Sprint as a minimum turns an outlier into a commitment. Individual velocity targets undermine teamwork, while ignoring available evidence and committing to every high-ranked item overstates certainty.

Question 10

New Multiple answers

Topic: Agile Estimating, Planning, Monitoring and Control

Skill tested: Combines progress indicators and direct impediment management to support transparent monitoring.

Midway through a Sprint, a delivery dashboard shows that several items remain in progress and the burndown line is above the team's expected trend. A database migration is blocked by an external approval, while another item has been completed but not updated on the board. Executives request a reliable status report, and the team wants to preserve the Sprint Goal rather than disguise the delay. Which TWO actions should the Scrum Master encourage? Select TWO.

Correct Answer: A. Make the board reflect the actual state of work and discuss progress toward the Sprint Goal with the team.; C. Help surface and address the external approval impediment, while communicating material risks and uncertainty transparently.
Explanation:

A trustworthy view requires the board to reflect reality; otherwise, both the team and stakeholders make decisions using inaccurate information. The Scrum Master can help the team address the external approval impediment and communicate its impact honestly. Changing estimates to improve a chart manipulates the measure rather than improving delivery. Reporting an uncertain forecast as achieved is misleading, and adding work does not resolve the impediment or protect progress toward the Sprint Goal.

Question 11

New Single answer

Topic: Complex Projects

Skill tested: Applies Nexus integration practices to manage dependencies and produce an integrated Increment across Scrum Teams.

Four Scrum Teams build components of one product and frequently discover integration problems near the end of each Sprint. Their separate Sprint Reviews show local progress, but stakeholders cannot inspect a complete, integrated product Increment. The organization wants to scale Scrum without creating a separate project-management layer or treating each team's output as independently releasable. Which approach best addresses the problem using Nexus?

Correct Answer: C. Maintain one Product Backlog, coordinate cross-team dependencies through Nexus events and the Nexus Integration Team, and focus on an integrated Increment that meets the shared Definition of Done.
Explanation:

Nexus extends Scrum for multiple teams working on one product. A single Product Backlog supports coherent ordering, while Nexus coordination and the Nexus Integration Team help address cross-team dependencies and integration. The goal remains an integrated Increment that meets the applicable Definition of Done. Separate backlogs and late aggregation preserve the very silos causing the problem. A task-assigning architecture committee adds a command layer and local definitions do not ensure an integrated, usable result.

Question 12

New Single answer

Topic: Complex Projects

Skill tested: Assesses Agile suitability by evaluating uncertainty, feedback access, and the ability to deliver incremental value.

A public agency is considering Scrum for two initiatives. One is a new eligibility service whose policy interpretation and user needs are still evolving; users can review prototypes, and the agency can approve limited releases. The other is a one-time replacement of a sealed, certified hardware component with an exact externally mandated specification and no ability to alter or test intermediate versions. Leadership wants a blanket rule that every initiative must use Agile. What is the most appropriate recommendation?

Correct Answer: B. Use Scrum for the service where feedback and incremental learning are feasible, and assess the hardware replacement using its constraints rather than imposing Agile categorically.
Explanation:

Scrum is especially useful when teams can inspect results, obtain feedback, and adapt toward value, which fits the evolving service and controlled user reviews. The sealed hardware replacement may have constraints that prevent meaningful incremental inspection or adaptation; its suitability should be assessed rather than assumed. A fixed specification does not automatically make Scrum appropriate, and public-sector work can still involve uncertainty. A blanket mandate ignores the different delivery conditions.

Question 13

New Single answer

Topic: Adopting Agile

Skill tested: Transfers coordination and impediment-removal support without turning the Scrum Master into a project manager.

An organization is moving a software project from command-and-control management to Scrum. The former project manager currently assigns daily work, consolidates progress reports, and escalates cross-team blockers. Executives expect the Scrum Master to keep the same delivery plan and guarantee its dates, while Developers want to take responsibility for organizing their work. Which transition is most appropriate?

Correct Answer: A. Have the Scrum Master support Scrum events, transparency, coaching, and impediment removal; let the Product Owner order product work and Developers plan their delivery.
Explanation:

Some coordination and impediment-removal activities may shift to the Scrum Master, but that does not make the role a traditional project manager who directs work or guarantees outcomes. The Product Owner is accountable for product value and backlog ordering; Developers plan how to deliver selected work and inspect progress. Retaining command-and-control authority while adding Scrum ceremonies changes little. Scrum still uses planning and transparency, so eliminating coordination and progress information would also be inappropriate.

Question 14

New Multiple answers

Topic: Adopting Agile

Skill tested: Builds self-management and cross-functionality by enabling shared ownership and removing capability bottlenecks.

A team transitioning to Scrum relies on a functional manager to assign tasks. Only one specialist can deploy the service, and other Developers avoid deployment work because it is outside their former job descriptions. Work regularly queues behind that specialist, and team members wait for instructions even when they can see a bottleneck. The organization wants a sustainable move toward self-management without sacrificing necessary deployment controls. Which TWO actions best support that transition? Select TWO.

Correct Answer: A. Build broader skills through pairing or training, while retaining appropriate deployment controls and quality standards.; C. Coach the Developers to organize their work toward the Sprint Goal and decide collaboratively how to address the bottleneck.
Explanation:

Self-management means the Developers organize and adapt their work rather than waiting for an external manager to assign tasks. Building skills through pairing or training increases the team's ability to deliver across the work it needs to complete, reducing a capability bottleneck. Appropriate deployment controls and quality standards remain necessary; removing safeguards is not the same as becoming cross-functional. Renaming a command-and-control manager does not change the operating model, and a separate end-of-Sprint deployment queue preserves the bottleneck.

Question 15

New Single answer

Topic: Agile Way of Thinking

Skill tested: Establishes continuous improvement through focused retrospective actions and follow-up inspection.

A team's retrospectives produce lengthy lists of possible improvements, but the same integration delays recur and few actions are completed. Members say the meetings feel like status reviews, while managers ask the Scrum Master to publish a department-wide improvement plan. The Scrum Master wants the team to make retrospectives useful and maintain its ownership of improvement. What should happen next?

Correct Answer: B. Facilitate an evidence-based discussion of a recurring issue, help the team select a small actionable improvement, and inspect its effect in subsequent work.
Explanation:

Continuous improvement is more likely when the team examines evidence, identifies a meaningful cause, chooses an actionable change, and follows up to see whether it helped. A small, testable improvement is more useful than a long unowned list. Managers assigning actions weakens the team's ownership, while postponing retrospectives removes a regular opportunity to adapt. An executive progress report does not replace the retrospective's purpose of improving the team's way of working.