Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Huawei Certified Pre-sales Associate Server H19-307 Exam Questions

Last updated: · 11 practice questions with answers and explanations

Page: 1 / 11 Total 155 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Huawei Server Architecture and Components

Skill tested: Evaluates server component selection for memory-intensive, multi-socket workloads.

A financial-services customer is sizing a compute node for a licensed analytics application. Its working set is larger than the memory capacity of a typical single-socket configuration, and the application is designed to use multiple processor sockets. The customer requires redundant power supplies and hot-swappable system fans, but has not specified a particular model or generation. The proposal must explain how the server architecture addresses both compute and memory requirements without treating storage capacity as a substitute for RAM. Which recommendation is most appropriate?

Correct Answer: D. Select a multi-socket server platform whose supported processor and DIMM configuration provides the required memory capacity, and validate the target model's power and fan redundancy options.
Explanation:

A multi-socket platform can provide the processor and memory-channel architecture needed for a large in-memory workload, but the exact supported DIMM capacity and population rules depend on the selected server model and processor configuration. Power and fan redundancy must also be confirmed against that model's options. Higher-capacity drives do not become application RAM, and filling slots without checking supported DIMMs can produce an invalid or suboptimal configuration. An empty processor socket does not provide the memory channels associated with an installed processor.

Question 2

New Multiple answers

Topic: Huawei Server Architecture and Components

Skill tested: Assesses balanced DIMM population and memory configuration planning for server workloads.

A customer is configuring a Huawei rack server for a virtualization host. The workload requires a large memory footprint and sustained memory bandwidth, while the project must remain within the selected server model's supported configuration. The procurement team wants to avoid an unbalanced installation and has asked the pre-sales representative to identify the checks required before finalizing the DIMM bill of materials. Select TWO actions that best meet these requirements. (Select TWO.)

Correct Answer: A. Distribute DIMMs across the memory channels according to the model's population rules, using a balanced configuration where supported.; C. Verify that the processor and server model support the proposed DIMM capacity, type, and operating configuration.
Explanation:

Memory capacity, supported DIMM characteristics, processor configuration, and population order are platform-specific, so those compatibility rules must be checked before purchasing. Balanced placement across supported channels is important for achieving the intended bandwidth and avoiding an unnecessarily asymmetric layout. Installing memory on only one socket does not give the other socket equivalent local memory access. Arbitrary DIMM mixing can be unsupported or force a common operating mode, and leaving channels empty generally sacrifices available bandwidth rather than improving it.

Question 3

New Single answer

Topic: Huawei Server Products and Solutions

Skill tested: Selects an out-of-band management approach for remote server monitoring and maintenance.

A regional retailer operates servers in small sites with no local IT staff. Its support team needs to inspect hardware health and perform remote maintenance even when the host operating system is unavailable. Production traffic is segmented from the management network, and the customer does not want host-based monitoring software to be the only means of access. Which design is the best fit?

Correct Answer: B. Connect the server management interfaces to an appropriately isolated management network and use the supported out-of-band management functions for health monitoring and remote operations.
Explanation:

A dedicated out-of-band management interface is designed to provide hardware management independently of the host operating system, subject to the server's supported management capabilities and configuration. Placing it on a restricted management network preserves separation from production traffic while enabling remote administrators to monitor and maintain systems. Host agents are useful for in-OS data but cannot be the sole path when the OS is unavailable. Public exposure increases risk, and exported OS logs cannot report live hardware state when the host is down.

Question 4

New Single answer

Topic: Huawei Server Products and Solutions

Skill tested: Matches management-tool workflows to firmware inventory and controlled maintenance planning.

Before a planned maintenance window, an operations team must review server firmware inventory, identify systems requiring updates, and coordinate the work across multiple sites. The customer requires an auditable process and wants to avoid updating a server during a critical business period. The representative is asked to recommend an operational approach, not a firmware version or a specific update command. Which recommendation is most appropriate?

Correct Answer: C. Use the supported server-management tooling to collect inventory and health information, validate applicable updates and dependencies, then schedule controlled maintenance with a documented change and rollback plan.
Explanation:

A controlled maintenance process begins with accurate inventory and health review, then validates applicability and dependencies before changes are made. Supported management tooling can assist with server inventory and operational oversight; the precise functions available depend on the product and deployment. Scheduling updates through change control avoids business-critical periods and provides a recovery plan. Blind updates can introduce compatibility or availability risks. OS package management is not a universal firmware mechanism, and disabling monitoring removes useful evidence rather than validating success.

Question 5

New Single answer

Topic: Huawei Server Performance Optimization

Skill tested: Uses workload measurements to diagnose CPU, memory, and I/O bottlenecks before resizing.

A customer reports that a virtualized application is slow after its VM allocation was increased. During the affected period, host CPU utilization is moderate, memory pressure is low, and storage latency rises sharply; the application's busiest data set is on the same storage pool as several batch jobs. The customer asks whether to add processor cores to the host immediately. The change window is limited, and the team wants evidence that identifies the limiting resource before buying hardware. What should be done first?

Correct Answer: A. Collect time-correlated host, VM, and storage performance metrics during the slowdown, then isolate the I/O contention and workload pattern before selecting a capacity change.
Explanation:

The evidence points toward a storage I/O issue rather than CPU or memory saturation. Correlating host, VM, and storage metrics during the actual incident helps distinguish latency, queueing, contention, and workload timing before committing to a change. Adding cores is an expensive intervention unsupported by the observed CPU data; more VM memory does not address a storage bottleneck. Disabling monitoring destroys evidence, while permanently co-locating batch jobs may worsen the contention.

Question 6

New Multiple answers

Topic: Huawei Server Performance Optimization

Skill tested: Plans server capacity using measured utilization, growth, and resilience requirements.

A customer is consolidating several application servers onto a smaller server pool. The current sizing spreadsheet uses peak CPU figures from different months, assumes all workloads peak simultaneously, and leaves no capacity for a server outage. The customer wants a defensible recommendation that controls cost while maintaining service during a single-host failure. Which TWO actions should the pre-sales team take? (Select TWO.)

Correct Answer: B. Collect representative utilization and workload-pattern data over time, including CPU, memory, and I/O demand.; D. Model the consolidated workload against the required failure scenario and retain sufficient capacity for the surviving hosts to carry the agreed load.
Explanation:

Representative measurements reveal sustained demand, peaks, and correlations among workloads; CPU alone is not enough for a balanced server design. The capacity model must then include the customer's stated resilience requirement so surviving hosts can accommodate the agreed workload after one host fails. Summing unrelated historical peaks can substantially overstate demand, while averaging CPU can conceal memory and I/O constraints. A cluster can provide availability mechanisms, but it cannot create compute or memory capacity that was not provisioned.

Question 7

New Single answer

Topic: Huawei Server Security and Disaster Recovery

Skill tested: Designs protected management access using network isolation and least privilege.

A manufacturer's security review finds that server management interfaces share a subnet with user workstations. Administrators use shared credentials, and the customer wants to improve security without interrupting production workloads. Remote support is required, but only a small operations group should perform management actions. Which change provides the strongest practical improvement?

Correct Answer: C. Place management interfaces on a restricted management network, limit access through approved administrative paths, and use named accounts with role-appropriate privileges and credential controls.
Explanation:

Separating management traffic limits exposure to ordinary user devices, while controlled administrative paths and individual, least-privilege accounts improve access control and accountability. Credential controls should follow the organization's policy and supported management capabilities. Publishing management interfaces externally increases the attack surface. A network location is not a substitute for authentication, and shared administrator credentials undermine attribution and make inappropriate access harder to contain.

Question 8

New Single answer

Topic: Huawei Server Security and Disaster Recovery

Skill tested: Distinguishes backup, replication, and recovery objectives in disaster-recovery planning.

A customer's business-critical database must recover after a site outage. The customer currently replicates data to a second site but has no independent historical backups, and an administrator is concerned that accidental deletion or corruption could be propagated. The business requires a documented recovery approach, but has not yet specified recovery-time or recovery-point objectives. What is the best next recommendation?

Correct Answer: A. Define business-approved recovery objectives and retention requirements, then design and test independent backups alongside replication where appropriate.
Explanation:

Replication can help restore service at another site, but it may also reproduce deletion or corruption and does not by itself provide historical recovery points. Business owners should establish recovery-time and recovery-point objectives and retention needs; the solution can then combine appropriately protected backups with replication and regular restore testing. Treating replication as a complete backup leaves a logical-failure gap. A single local copy is inadequate for site loss, and extra CPU does not address recovery design.

Question 9

New Multiple answers

Topic: Huawei Server Pre-sales and Consulting

Skill tested: Elicits workload, availability, and growth requirements before server sizing.

A sales team is preparing a server proposal for a customer replacing an aging application environment. The customer has supplied its current server count and a target budget but has not described workload peaks, data growth, availability expectations, or application dependencies. The team must avoid an oversized design while ensuring the proposal can be validated and compared fairly. Which TWO steps should the representative take before finalizing the configuration? (Select TWO.)

Correct Answer: D. Gather workload and utilization evidence, including peak patterns, memory needs, storage performance, and expected growth.; E. Clarify business-critical services, outage tolerance, recovery expectations, and relevant application or virtualization dependencies.
Explanation:

A credible server design needs both technical demand data and business service requirements. Utilization, workload peaks, memory, storage behavior, and growth inform capacity, while availability and recovery expectations determine the required architecture and resilience. Existing inventory can be useful evidence but does not prove that its capacity is appropriate or sufficient. Selecting hardware before validation risks either overbuying or failing to meet the workload. Treating all applications identically ignores differences in criticality and dependencies.

Question 10

New Multiple answers

Topic: Huawei Server Pre-sales and Consulting

Skill tested: Builds a defensible server proposal by validating compatibility and lifecycle assumptions.

A customer requests a server solution for a new virtualization deployment. The preferred hypervisor and operating-system versions are known, but the customer has not confirmed the exact server model, network adapter, or storage controller. The proposal must be supportable and avoid unexpected component substitutions after purchase. Which TWO actions are most appropriate before presenting a final bill of materials? (Select TWO.)

Correct Answer: C. Validate the proposed server and component combination against the relevant compatibility and support information for the intended software stack.; E. Confirm interface, capacity, redundancy, and growth requirements with the customer, then document any assumptions and dependencies in the proposal.
Explanation:

Physical fit alone does not establish software support or correct operation, so the proposed server, adapters, controller, and intended software stack need compatibility validation. Requirements for bandwidth, capacity, redundancy, and future growth also shape the bill of materials. Documenting assumptions makes the proposal reviewable and reduces surprises during delivery. Omitting component detail weakens acceptance and supportability, while choosing maximum-capacity parts without validating need can increase cost or result in an unsupported configuration.

Question 11

New Single answer

Topic: Huawei Server Architecture and Components

Skill tested: Explains RAID trade-offs when selecting local storage for server workloads.

A customer wants local storage for an application server. Its priority is continued operation after a single drive failure, while the purchasing team is comparing RAID 0, RAID 1, and parity-based RAID options. The application data is valuable, but the customer has separately requested a backup plan and understands that local RAID is not a substitute for backup. The server's drive count and controller capabilities have not yet been confirmed. Which advice is most responsible at this stage?

Correct Answer: A. Confirm the supported controller and drive configuration, then compare a redundant RAID level against the required usable capacity and workload; retain independent backups.
Explanation:

The requirement calls for fault tolerance, but the appropriate RAID level depends on the supported controller, number and type of drives, usable-capacity needs, and workload characteristics. Those details must be validated before a specific layout is recommended. RAID 0 provides no drive-failure redundancy. RAID 1 can tolerate a drive failure in supported configurations but should not be prescribed without confirming requirements and platform support. Backups protect recoverability; they do not necessarily maintain immediate service during a drive failure.