Free IBM Maximo Manage v8.0 Implementation C1000-132 Exam Questions

Last updated: · 14 practice questions with answers and explanations

Page: 1 / 7 Total 64 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Maximo Application Suite Overview

Skill tested: Assesses selection of an appropriate Maximo Application Suite licensing metric for managed assets.

A utility is preparing to deploy Maximo Manage for several operating divisions. The divisions have different numbers of maintainable assets, and many technicians need occasional access to work orders. Procurement wants a licensing approach that reflects the scale of the managed asset estate rather than counting each occasional user. Which licensing basis should the implementation team evaluate first?

Correct Answer: D. Authorized use measured by the number of managed assets, subject to the applicable offering terms.
Explanation:

For asset-intensive operations, the managed-asset licensing metric is the relevant basis to evaluate; it can align entitlement sizing with the asset estate rather than the number of occasional users. The precise entitlement and counting rules must be confirmed against the purchased offering. Named-user licensing does not meet the stated preference, AppPoints are not simply a concurrent-session counter, and organizations or sites do not each inherently require a separate product entitlement.

Question 2

New Single answer

Topic: Maximo Application Suite Overview

Skill tested: Evaluates how Health replacement planning translates asset recommendations into Manage work.

A fleet operator uses Maximo Health to assess equipment condition and generate replacement recommendations. The operations director wants approved recommendations to become actionable maintenance records in Maximo Manage, while retaining the Manage team's normal work-planning and approval controls. Which approach best fits this requirement?

Correct Answer: B. Use the supported Health-to-Manage integration flow to create or initiate the corresponding Manage work records, then apply Manage planning and approval processes.
Explanation:

Health provides condition and replacement-planning insight; Manage remains the system in which operational work is planned and governed. Using the supported integration path lets recommendations inform Manage records while preserving the organization's normal planning and approval controls. Automatically approving work would bypass those controls. Inventory reorder points address replenishment, not asset replacement work, and depreciation schedules are financial configurations rather than work records.

Question 3

New Single answer

Topic: Platform Configuration

Skill tested: Assesses organization, site, and set design for shared item and company records.

A manufacturer operates two sites under one legal organization. Both sites must use the same item catalog and approved supplier records, but each site must retain its own storerooms, work execution, and operational reporting. The implementation team is configuring the enterprise structure before loading transactional data. Which design best supports the stated separation and sharing?

Correct Answer: D. Create one organization with two sites, and associate a common item set and company set with that organization.
Explanation:

An organization can contain multiple sites, allowing each site to manage operational records independently while organizational configuration associates shared item and company sets. Duplicating organizations and records adds maintenance and undermines the requested common catalog. Security groups control access; they do not replace site structure. A site belongs to an organization, so the proposed shared-site design is not an appropriate way to represent two operational locations.

Question 4

New Multiple answers

Topic: Platform Configuration

Skill tested: Evaluates security group configuration for least-privilege application and site access.

An administrator is setting up a contractor group. Members must create and update work orders only at Site EAST, must not approve work, and should not see labor cost fields. They also need read access to the relevant asset records. The group is being designed for ongoing use, and the organization wants to avoid granting broader access through inherited application privileges. Which two configuration decisions best meet the requirements? Select TWO.

Correct Answer: A. Grant the group work-order application access with create and update privileges, and restrict its data scope to Site EAST.; E. Grant read-only access to the necessary asset records and restrict labor-cost field visibility through the applicable security controls.
Explanation:

The group needs explicit work-order create/update capability within the EAST site scope, plus read access to relevant assets. Approval is a separate privilege and is expressly prohibited. User-applied filters do not enforce security, so granting every site is insufficient. Administrator privileges violate least privilege. Cost-field visibility should be restricted through the relevant security configuration rather than relying on users not to inspect those fields.

Question 5

New Single answer

Topic: Platform Configuration

Skill tested: Assesses selection of Maximo integration methods for controlled external data exchange.

A planning system must submit approved work requests to Maximo Manage on a scheduled basis. The integration is asynchronous, must tolerate temporary outages, and should use supported application business logic rather than writing directly to the Maximo database. The enterprise integration platform can exchange messages and the Maximo environment exposes configured integration interfaces. Which design is most appropriate?

Correct Answer: C. Use configured Maximo integration objects and an appropriate message-based integration path, with error handling and retry at the integration layer.
Explanation:

Configured integration objects provide a supported way to exchange application data while using Maximo's integration framework rather than bypassing application logic. A message-based, asynchronous design can accommodate outages through queuing, retries, and error handling in the integration solution. Direct database writes can create inconsistent application data and bypass validation. UI automation is brittle, while manual spreadsheet handling does not meet the scheduled, resilient integration requirement.

Question 6

New Single answer

Topic: Asset & Inventory Management Confiuration

Skill tested: Assesses inventory issue and transfer processing using Inventory Usage records.

A maintenance planner needs to reserve materials from one storeroom for a work order at another site. The source storeroom must retain the items until dispatch, and the receiving site must record receipt before the materials are available for issue. The organization also needs an auditable record of the movement rather than an immediate untracked balance adjustment. Which application process should be used?

Correct Answer: A. Create an Inventory Usage record for the transfer, then process its shipment and receipt stages as required.
Explanation:

Inventory Usage supports controlled inventory transactions, including transfers between storerooms, with processing stages that preserve an auditable movement and distinguish shipment from receipt. A requisition is a procurement request, not the correct internal transfer record. Direct balance changes bypass the required transaction history and receiving control. Service requests manage reported service needs and do not perform inventory movement.

Question 7

New Multiple answers

Topic: Asset & Inventory Management Confiuration

Skill tested: Evaluates setup of meter-based condition monitoring points and failure coding.

A plant wants to identify a recurring pump failure before catastrophic breakdown. Technicians record vibration readings against each pump, and reliability engineers need failure analysis grouped by problem, cause, and remedy. The readings must be associated with the correct assets, and the failure information must be available for later work-order analysis. Which two configuration actions are required? Select TWO.

Correct Answer: C. Define a suitable meter and associate it with the relevant assets so readings can be recorded.; D. Create a condition monitoring point that uses the applicable meter readings and alert limits for the pump assets.
Explanation:

Meter definitions and asset associations provide the basis for recording comparable vibration readings. A condition monitoring point can use those readings and defined limits to identify conditions needing attention. A purchase contract does not measure equipment condition, and asset status is not a substitute for structured failure classification. A monitoring point cannot meaningfully evaluate meter data that has not been defined and made available for the assets.

Question 8

New Single answer

Topic: Procurement & Contract Management

Skill tested: Assesses the procurement document sequence from requisition through purchase order and receipt.

A maintenance department has an approved purchase requisition for a repair component. Purchasing must obtain competitive supplier responses, select a supplier, issue an authorized order, and later record delivery before matching the supplier invoice. The department must not commit funds to a supplier before the competitive selection is complete. Which sequence best follows the required controls?

Correct Answer: C. Create an RFQ from the requisition, evaluate responses, generate and approve the selected purchase order, receive the goods, then process the invoice.
Explanation:

The requisition establishes the internal demand. An RFQ gathers supplier offers; evaluation and selection precede issuing and approving the purchase order, which authorizes the commitment. Receipt records what was delivered, after which the invoice can be processed against the procurement transaction. Issuing an order before selection defeats the stated control, while invoicing before ordering or receiving reverses the intended sequence.

Question 9

New Single answer

Topic: Work Management & Planning

Skill tested: Assesses dynamic job plan selection based on work-order conditions and planning needs.

A facilities organization performs a family of similar inspections on equipment from several manufacturers. The inspection steps are mostly common, but particular steps and materials vary by asset class and observed condition. Planners want the work order to receive an appropriate plan based on defined criteria while avoiding a separate manually maintained job plan for every asset. Which approach is most suitable?

Correct Answer: A. Create a separate master preventive maintenance record for every inspection step.
Explanation:

Dynamic job plans are intended to vary planned work according to defined criteria, which supports common planning with conditional task or material content. A separate PM for every step confuses recurring work generation with job planning and creates unnecessary records. A static plan containing irrelevant steps is difficult to execute consistently. Safety plans address hazards and controls, not conditional selection of the maintenance job plan.

Question 10

New Multiple answers

Topic: Work Management & Planning

Skill tested: Evaluates preventive maintenance generation and work-order planning controls.

A water utility must generate recurring inspection work for a group of pumps. Work should be planned from a reusable job plan, generated in advance so supervisors can balance labor, and limited to the pumps that meet the PM's asset and scheduling criteria. The utility wants the resulting work orders to enter the normal review process rather than be dispatched automatically. Which two actions best meet these requirements? Select TWO.

Correct Answer: A. Associate the reusable job plan with the PM and generate forecast work orders far enough ahead for planning.; B. Create a master PM with the applicable target assets or locations and recurrence criteria.
Explanation:

A master PM defines the recurring work, its eligible target assets or locations, and scheduling criteria. Associating the job plan supplies planned tasks and resources, while advance generation gives supervisors time to balance labor and review the resulting work. Automatic approval and dispatch violate the stated control. Service requests are not the recurring PM mechanism, and assigning the PM indiscriminately creates avoidable work that should be excluded by appropriate targeting.

Question 11

New Single answer

Topic: Financial Configuration

Skill tested: Assesses organization-level financial options and chart-of-accounts validation for transactions.

During a rollout, purchase-order costs are being charged to accounts that are valid in the general ledger but do not follow the organization's required segment structure. Finance wants Maximo to validate account combinations consistently across transactions and wants the relevant financial settings applied at the organization level. The rollout team must correct configuration before processing live procurement. What should it do first?

Correct Answer: B. Update the organization's system financial options and configure the chart of accounts and account validation rules to reflect the required segments.
Explanation:

Organization-level financial options and chart-of-accounts configuration establish how financial accounts are structured and validated in Maximo transactions. Correcting these controls before live procurement prevents repeated invalid coding. Manual corrections after approval do not provide consistent validation. Depreciation schedules govern asset depreciation, not account-segment validity, and security visibility does not validate or correct financial combinations.

Question 12

New Single answer

Topic: Configure service Management

Skill tested: Assesses configuration of service request classification and service-level commitments.

A campus service desk receives requests for building access, heating, and lighting. Each request must be classified consistently so appropriate teams can report on issues, while response and resolution commitments vary by request priority and customer agreement. The team must preserve a clear category hierarchy and apply service commitments to service requests without embedding timing rules in free-text descriptions. Which configuration approach is best?

Correct Answer: D. Configure service request categories, subcategories, and issues, and define applicable SLAs with criteria and commitments for the relevant requests.
Explanation:

A category, subcategory, and issue hierarchy supports consistent service-request classification and reporting. SLAs define applicable service commitments through criteria and associated commitments, avoiding informal timing rules in descriptions. Organizations are enterprise structures, not request categories. Failure codes are used for failure analysis and do not replace service-request classification or SLA processing. Job plans plan work tasks rather than define service-level commitments.

Question 13

New Single answer

Topic: Configure Work Safety

Skill tested: Evaluates applying a safety plan to work orders with applicable hazards and precautions.

A maintenance supervisor is preparing a work order for servicing equipment in a restricted electrical area. A reusable safety plan already documents the relevant hazards, precautions, and required protective measures. The work order must carry those controls so crews can review them during execution, but the supervisor must not treat the safety plan itself as proof that the equipment has been isolated. What is the most appropriate action?

Correct Answer: A. Apply the applicable safety plan to the work order and separately complete the required isolation and verification process.
Explanation:

Applying the safety plan makes its relevant hazard and precaution information available in the work context. It does not perform physical isolation or verify a safe state, so the required isolation process remains a separate operational control. Closing the work order would misrepresent unfinished work. Job plans organize maintenance tasks and do not replace safety controls, while asset-level information alone does not ensure that the plan has been applied to this specific work order.

Question 14

New Multiple answers

Topic: Platform Configuration

Skill tested: Assesses calendar and shift setup for scheduler-ready labor and crew availability.

A maintenance organization is preparing scheduling data for two shifts. Individual labor records must have availability that reflects the applicable work calendar, and a crew must be schedulable as a coordinated resource. The planner also needs nonworking days represented accurately so the Scheduler does not treat them as available capacity. Which two configuration actions are most appropriate? Select TWO.

Correct Answer: D. Configure the labor and crew records with the appropriate calendar, shift, and availability information used for scheduling.; E. Create and maintain the applicable calendars and shifts, including working and nonworking time.
Explanation:

Scheduler-ready capacity depends on accurate calendars and shifts, including nonworking periods, and on labor and crew records being associated with the appropriate availability information. Work-order descriptions do not define resource availability. Asset calendars describe asset availability, not labor capacity, even when schedules appear similar. Security groups manage access and do not define working time or scheduler resource availability.