Question 1
Topic: Project Development
Skill tested: Evaluates occupancy classification and scope review against the adopted building and fire codes.
A design team is preparing a sprinkler proposal for a mixed-use building with a small warehouse, a showroom, and offices. The owner's narrative calls the entire facility "ordinary hazard," but the architectural plans show high-piled storage in part of the warehouse and the specifications refer to a separate storage-protection design. The contract requires the designer to identify code-driven scope conflicts before issuing permit documents. What should the designer do FIRST?
The designer must establish the actual use, storage arrangement, and applicable code and standard criteria before fixing the system scope. The owner's label does not override documented high-piled storage or the specification's separate design requirement; the conflict should be identified and resolved with the responsible project parties. Applying the highest criteria everywhere may create an unjustified scope and does not resolve the contract conflict. Deferring classification until shop drawings or installation risks producing permit documents that do not meet the adopted requirements.