Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Nutanix Certified Professional - Database Automation v7.5 NCP-DB Exam Questions

Last updated: · 14 practice questions with answers and explanations

Page: 1 / 10 Total 95 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Deploy and Configure an NDB Solution

Skill tested: Plans an NDB deployment that satisfies network reachability and availability requirements.

A company is preparing to deploy Nutanix Database Service (NDB) in a production environment. The NDB VM must manage database VMs on two Nutanix clusters, and administrators require uninterrupted database-management access if the primary NDB instance becomes unavailable. The security team allows only approved management and database network paths; it will not permit broad routing between networks. Before deployment, the architect must identify the design decision that most directly supports a viable NDB deployment and later high availability. Which approach is best?

Correct Answer: B. Plan the required network connectivity for NDB management and database operations, then deploy and configure NDB HA according to supported prerequisites.
Explanation:

NDB must have the network reachability required to manage its registered clusters and database VMs; an isolated appliance cannot be assumed to reach them through Prism Central. HA should be designed and configured using the supported NDB procedure and its prerequisites, rather than by creating competing independent management instances. The scenario also requires narrowly scoped approved paths, so the connectivity plan should identify and authorize only the necessary flows. Options A and D make unsupported assumptions about reachability, while C risks inconsistent management of the same resources.

Question 2

New Single answer

Topic: Deploy and Configure an NDB Solution

Skill tested: Configures NDB instance settings to match operational and administrative requirements.

A database-operations team has completed the initial NDB deployment. During commissioning, the team discovers that the instance is not aligned with the organization's approved operational design: administrators need a reliable management endpoint, the instance must use the approved infrastructure resources, and the team wants to avoid registering database VMs until the NDB configuration is verified. Which action should the team take next?

Correct Answer: B. Complete and validate the NDB instance configuration, including its required infrastructure and management settings, before onboarding database resources.
Explanation:

The NDB instance needs to be configured and validated before operational onboarding so that resources are managed against the intended infrastructure and management settings from the start. Registering systems before this validation can create avoidable rework and obscure whether later failures arise from onboarding or the base configuration. Profiles describe database provisioning characteristics; they do not establish the NDB appliance endpoint. Deploying separate instances for each cluster is not a substitute for correctly configuring the intended NDB instance.

Question 3

New Multiple answers

Topic: Deploy and Configure an NDB Solution

Skill tested: Evaluates the prerequisites and operational design for NDB high availability.

A financial-services company wants NDB high availability because database provisioning and recovery operations must remain manageable during an appliance failure. Its infrastructure team has prepared the required NDB HA design and is reviewing the change plan. The plan must preserve a single coherent management service and avoid unsupported workarounds. Which two actions are appropriate? Select TWO.

Correct Answer: A. Follow the supported NDB HA deployment and configuration workflow and validate its documented prerequisites.; D. Validate that the HA deployment can meet the organization's network and infrastructure requirements before placing it into production.
Explanation:

NDB HA should be implemented through its supported workflow, with the documented prerequisites and the organization's network and infrastructure constraints validated before production use. HA improves availability of NDB management; it does not replace backup and recovery protection for managed databases. Independently managing the same resources from competing instances or relying on ad hoc switching introduces operational ambiguity rather than a coherent HA design. The supported approach and readiness validation are both necessary to meet the stated reliability goal.

Question 4

New Single answer

Topic: Monitor Alerts and Storage Usage within an NDB Implementation

Skill tested: Prioritizes NDB alerts by validating affected resources and operational impact.

After a maintenance window, an NDB administrator sees several alerts in the console. One reports a failed database operation on a production database; another is informational and relates to a nonproduction resource. The production team reports that the database is still available, but a scheduled change is blocked. The organization requires the administrator to resolve operational risk without dismissing alerts based only on database availability. What is the best first response?

Correct Answer: A. Review the failed operation's alert details and related operation status, identify the affected resource and cause, and act on the production impact first.
Explanation:

An online database does not prove that the failed NDB operation is harmless; the blocked scheduled change is a meaningful operational impact. The administrator should use the alert and operation details to establish the affected resource and failure context, then prioritize the production issue. Clearing alerts or disabling notifications removes useful evidence without resolving the cause. Restarting the NDB VM is premature because a failed managed operation does not by itself establish an appliance-wide fault.

Question 5

New Single answer

Topic: Monitor Alerts and Storage Usage within an NDB Implementation

Skill tested: Uses NDB storage metrics to identify and address database storage growth.

A platform team notices that the storage consumed by an NDB-managed database environment is increasing faster than its approved forecast. The database remains healthy, and there is no immediate capacity outage. The team must determine which managed resources and retained data are driving consumption before changing retention or capacity plans. Which approach is most appropriate?

Correct Answer: C. Use NDB's storage monitoring information to inspect usage trends and the relevant database and Time Machine storage consumption before choosing remediation.
Explanation:

The correct first step is to use NDB's available storage monitoring to identify where consumption is occurring, including relevant database and Time Machine usage, before changing retention or capacity. The scenario explicitly calls for attribution, not an immediate destructive or costly action. Deleting snapshots without assessing retention requirements can undermine recovery objectives, while adding capacity without understanding the growth driver may not address the cause. Disabling monitoring removes the information needed for sound capacity management.

Question 6

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Registers database server VMs and databases using the appropriate NDB onboarding workflow.

A team has several existing database server VMs that were built outside NDB. The servers are running supported database software, but NDB does not yet manage them. The organization wants to bring them under NDB management without reprovisioning their data or disrupting application service. Which approach should the administrator use?

Correct Answer: B. Register the existing database server VMs and databases with NDB, supplying the required credentials and configuration details for discovery and management.
Explanation:

For existing systems that must remain in place, NDB's registration workflow is the appropriate way to onboard supported database server VMs and databases for management. It does not require replacing the production database with a newly provisioned copy. Cloning is an operation on managed database resources, not a prerequisite for registering existing systems. Adding network information alone does not register a database or establish the required database-level management context.

Question 7

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Selects provisioning profiles and settings appropriate to a database deployment request.

An application team requests a new database through NDB. Its requirements specify a database engine and version, a target Nutanix cluster, an approved network, and performance and storage characteristics established by the platform team. The database must be reproducible and conform to the organization's standard build. What should the database administrator do?

Correct Answer: B. Provision the database using an appropriate NDB profile and the request's approved target, network, and database-specific settings.
Explanation:

NDB provisioning should use a profile that represents the approved database build characteristics, together with the requested target and network configuration. This promotes repeatability and alignment with the platform standard. Manually building a placeholder VM bypasses the intended NDB provisioning workflow, and an arbitrary profile may violate the workload's engine, performance, or storage needs. Cloning an unrelated production database is not a general replacement for provisioning a compliant new database.

Question 8

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Plans patching of NDB-managed database entities while preserving operational controls.

A database fleet has a vendor patch available, and the security team requires remediation during the current maintenance cycle. The fleet contains production and test databases, with different maintenance windows and recovery requirements. The systems are managed by NDB, and the team wants to use the managed patching process rather than make untracked changes inside each VM. Which plan is best?

Correct Answer: A. Use the NDB patching workflow for the targeted managed entities, following the applicable prerequisites and scheduling by environment and maintenance window.
Explanation:

NDB-managed entity patching should be performed through the applicable NDB workflow and coordinated with each environment's change and recovery requirements. Separating test and production windows reduces the blast radius and allows validation before broader rollout. Updating the NDB appliance does not inherently apply database engine patches to managed entities. Manual changes followed by alert suppression undermine the managed state and remove signals that could reveal drift or failure.

Question 9

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Diagnoses failed NDB operations using operation details before applying remediation.

A database clone request fails during execution. The application owner asks the administrator to retry immediately because the source database is still serving traffic. The NDB console shows a failed operation, but the failure stage and affected resource have not yet been reviewed. The team must avoid repeated failures and protect the production source. What should the administrator do next?

Correct Answer: B. Inspect the failed operation's details and logs, identify the failure stage and relevant prerequisites, and then choose a targeted remediation or retry.
Explanation:

The failure details provide the evidence needed to distinguish a configuration, resource, or workflow issue before another attempt. An online source does not establish that the clone prerequisites are satisfied, and blind retries can waste resources or repeat the same failure. Restoring the source is unrelated and potentially disruptive; deleting and re-registering its record is also an unjustified response that could complicate management. A targeted diagnosis is the safest next step.

Question 10

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Chooses a database clone workflow that protects the source and meets isolation needs.

A development team needs a short-lived copy of a production database for testing a release. The copy must not interfere with production availability, and developers must be able to use it independently. The organization manages the source database through NDB and has approved the required target capacity. Which action best meets the request?

Correct Answer: A. Use NDB to clone the managed source database to the approved target, then validate the clone before granting development access.
Explanation:

An NDB-managed clone provides a separate database copy for testing while leaving the production source available. Validating the clone before access confirms that the intended independent test resource is ready. Restoring the source in place risks production data and availability; duplicate registration does not create an independent database; and an uncoordinated live file copy can produce an inconsistent copy and bypass management controls.

Question 11

New Single answer

Topic: Operate and Maintain an NDB Environment

Skill tested: Selects a source database restore action aligned with recovery requirements.

A production database has an application-level data issue, and the incident commander has approved recovery to a known-good point before the error occurred. The database is managed by NDB, and the recovery must be performed on the source database rather than used to create a separate test copy. Which action is most appropriate?

Correct Answer: B. Use the NDB source-database restore workflow to recover the source to the approved recovery point, following the workflow's impact and validation requirements.
Explanation:

The requirement is to recover the source database itself to an approved point in time, so the source restore workflow is appropriate. The administrator should follow its impact and validation steps because restoring a source can affect current data and availability. A clone may be useful when a separate copy is needed, but it leaves the source unchanged and does not meet this incident's objective. Deleting recovery points is destructive, and engine patching does not reverse the application-level data issue.

Question 12

New Multiple answers

Topic: Operate and Maintain an NDB Environment

Skill tested: Manages Time Machine retention and recovery points according to database protection objectives.

A platform owner is reviewing Time Machine protection for several NDB-managed databases. Recovery-point retention must comply with business requirements, and the team wants to reduce unnecessary storage growth without compromising the approved recovery window. The owner is also asked to verify that protection remains operational after any policy change. Which two actions are appropriate? Select TWO.

Correct Answer: A. Review the databases' Time Machine policies and retained recovery points against the approved recovery objectives before changing retention.; C. Adjust the applicable Time Machine policy within the approved retention requirements and verify subsequent protection activity.
Explanation:

Retention should be evaluated against the required recovery window before modification, and the resulting policy should be checked by confirming that protection continues as expected. These actions manage storage deliberately while preserving business recovery objectives. Deleting all recovery points first can violate those objectives and is not a safe general optimization. An external backup does not automatically change NDB's Time Machine policy or status, and blanket disablement ignores database-specific protection requirements.

Question 13

New Single answer

Topic: Administer an NDB Environment

Skill tested: Maintains NDB profiles to enforce consistent database provisioning standards.

A database platform team has updated its standard storage and performance requirements for newly provisioned databases. Existing database instances must remain unchanged, while future deployments should use the revised standard consistently. Administrators currently select profiles during NDB provisioning. What should the platform owner do?

Correct Answer: A. Update the relevant NDB profile for future provisioning and validate that its settings represent the revised standard.
Explanation:

Profiles are the appropriate place to maintain standardized settings used for provisioning. Updating the relevant profile allows future deployments to follow the revised standard while respecting the explicit requirement not to change existing instances. The scenario does not establish that profile edits retroactively alter managed databases, so option B makes an unsafe assumption. Separate NDB instances add unnecessary complexity, and network settings do not define the stated storage and performance characteristics.

Question 14

New Single answer

Topic: Administer an NDB Environment

Skill tested: Plans an NDB software upgrade using compatibility and maintenance controls.

An organization plans to upgrade its NDB software because a newer release is approved for production. The environment manages multiple database clusters and is subject to formal change control. Operations staff want to avoid discovering compatibility or readiness issues during the maintenance window. Which preparation is most appropriate?

Correct Answer: D. Review the applicable NDB upgrade prerequisites and compatibility requirements, prepare the change and recovery plan, and execute the supported upgrade procedure.
Explanation:

A controlled NDB upgrade requires readiness checks against the applicable prerequisites and compatibility requirements, along with a planned change and recovery approach. This reduces the risk of consuming the maintenance window on avoidable blockers. Starting without preparation is unnecessarily risky. Database engine patching is a separate managed-entity activity and is not established here as a prerequisite for an NDB software upgrade. An unrelated second instance does not constitute a supported upgrade path.