Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Nutanix Certified Professional - Business Continuity v7.5 NCP-BC Exam Questions

Last updated: · 15 practice questions with answers and explanations

Page: 1 / 11 Total 109 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Interpret and Configure Business Continuity & Disaster Recovery (BCDR) Requirements

Skill tested: Translate application RPO and RTO requirements into an appropriate Nutanix protection policy.

A payments application runs across several Nutanix AHV VMs at the primary site. The business requires recovery point objectives (RPOs) of no more than 15 minutes and recovery within two hours after a site loss. The target site has sufficient capacity, and the WAN can support continuous replication, but the application owner cannot accept scheduled outages to create recovery points. The current protection policy creates daily snapshots and replicates them asynchronously. Which change best meets the stated recovery requirements while retaining policy-based protection?

Correct Answer: B. Configure a protection policy with a recovery-point schedule no greater than 15 minutes and replicate its snapshots to the target site.
Explanation:

An RPO is bounded by how frequently recoverable points are created and replicated, so a policy schedule no greater than 15 minutes is needed to meet this requirement. Policy-based replication makes those recovery points available at the target without depending on post-outage manual work. Setting an RTO does not change snapshot frequency, so A leaves the RPO unmet. More capacity does not correct the daily recovery-point interval in C, and D adds operational delay and outage dependence rather than providing continuous policy-driven protection.

Question 2

New Multiple answers

Topic: Interpret and Configure Business Continuity & Disaster Recovery (BCDR) Requirements

Skill tested: Identify network and storage prerequisites for reliable policy-based replication between Nutanix sites.

A company is preparing to protect a production VM category between two Nutanix clusters. The clusters can reach each other over the routed WAN, but the network team has not yet validated the replication path or the target storage container. The security team requires replication traffic to use an approved, restricted path, and the target must be able to hold replicated data without competing with an unrelated workload. Which two checks should the administrator complete before enabling protection? Select TWO.

Correct Answer: D. Verify required inter-site connectivity and firewall allowances for the selected Nutanix replication workflow.; E. Confirm that the target cluster has an appropriate storage container and sufficient capacity for the protected data and recovery points.
Explanation:

Replication depends on a functioning, permitted inter-site path, so the team must validate connectivity and firewall rules for the configured workflow rather than broadly removing restrictions. The destination also needs a suitable storage container and enough capacity for incoming replicated data and retained recovery points. Public addressing on the protected VM is unrelated to cluster-to-cluster replication. Disabling restrictions violates the security constraint, while categories are used to organize and select workloads for protection, not to identify individual snapshots.

Question 3

New Single answer

Topic: Interpret and Configure Business Continuity & Disaster Recovery (BCDR) Requirements

Skill tested: Select BCDR hardening measures that reduce administrative and network exposure.

A healthcare provider is reviewing its BCDR design before placing regulated workloads under protection. Both sites are operational, but several administrators share a broad account, replication-related network access has not been reviewed, and recovery operations have no documented approval process. The provider wants to reduce the chance that compromised credentials or an overly permissive path could disrupt both sites. It cannot introduce a separate product solely for this project. Which action is the best first hardening improvement?

Correct Answer: D. Use individual administrative identities with least-privilege access and require strong authentication for privileged access.
Explanation:

Individual identities, least privilege, and strong authentication reduce credential-sharing risk and make privileged actions attributable. They are a foundational hardening step that can be implemented without adding another product. A shared account weakens accountability and remains vulnerable for too long; unrestricted inter-site traffic violates network segmentation; and an unencrypted credential document exposes recovery access. Network rules and approval procedures still require review, but the best listed first improvement is to secure privileged identity and access.

Question 4

New Single answer

Topic: Test Business Continuity & Disaster Recovery (BCDR) Solutions

Skill tested: Plan an isolated DR failover test without disrupting protected production workloads.

A retailer must demonstrate that a protected three-VM application can start at the recovery site and communicate with its test database. Production at the primary site must remain online, and test systems must not advertise conflicting production IP addresses on the corporate network. The recovery team has a current protection plan and test capacity, but has not run a failover test before. What is the most appropriate approach?

Correct Answer: D. Run a test failover using an isolated or appropriately mapped test network, then verify application startup and inter-VM connectivity.
Explanation:

A test failover is intended to validate recovery without taking the production workload offline. Using an isolated or deliberately mapped test network prevents duplicate production addressing from affecting live services, while startup and connectivity checks validate more than VM power state. A planned failover is a production transition and would interrupt service. An unplanned failover and DNS change exceed the test objective, and testing only the database does not prove the multi-VM application works.

Question 5

New Multiple answers

Topic: Test Business Continuity & Disaster Recovery (BCDR) Solutions

Skill tested: Evaluate replication-path throughput and connectivity using meaningful test measurements.

During a scheduled DR exercise, administrators find that replication completes later than the protection schedule requires. The route between sites is reachable, but the team does not know whether the WAN path, packet loss, or available bandwidth is responsible. The network team will permit an agreed test window but will not allow production traffic to be interrupted. Which two measurements or checks most directly help assess the replication path? Select TWO.

Correct Answer: A. Verify end-to-end connectivity and inspect latency or packet loss on the source-to-target path.; C. Measure available inter-site throughput during the test window and compare it with the replication demand.
Explanation:

Available throughput indicates whether the path can carry the replication load, while end-to-end connectivity, latency, and loss help identify path quality problems that can delay transfers. Both checks can be performed during an approved window without stopping production. VM vCPU count and guest free space do not measure WAN capacity. Disabling a firewall is unsafe and would not establish that the production security rules permit the required path; tests should use the intended network configuration.

Question 6

New Single answer

Topic: Test Business Continuity & Disaster Recovery (BCDR) Solutions

Skill tested: Interpret test recovery-point results against the application's stated RPO.

A DR test report shows that the latest recovery point available at the target was created 28 minutes before the test began. The application owner has an RPO of 20 minutes. The target VMs booted successfully and users could complete a test transaction, but no newer recovery point was present. The replication policy is configured for a 15-minute interval. What should the recovery team conclude from this test?

Correct Answer: C. The test demonstrates application startup, but the observed recovery point exceeds the 20-minute RPO and requires investigation.
Explanation:

A successful boot and transaction verify important recovery behavior, but they do not establish that the recovered data is recent enough. The observed recovery point is 28 minutes old, which is outside the stated 20-minute RPO. A configured 15-minute interval is an intended schedule, not proof that replication completed successfully or that a sufficiently recent point arrived. The test need not shut down production merely to compare the available recovery point with the requirement.

Question 7

New Single answer

Topic: Test Business Continuity & Disaster Recovery (BCDR) Solutions

Skill tested: Validate application recovery and network mappings after a non-disruptive DR test.

An engineering team tests recovery of a web service and its database at the secondary site. Both VMs power on, but the web tier cannot reach the database. The recovery run used a test network mapping, and the protected production environment remains healthy. The team must determine whether the problem is caused by recovery configuration rather than an application defect. What should it verify next?

Correct Answer: C. Verify that the test network mapping places both VMs on networks with the intended addressing and that required inter-VM routes and access rules exist.
Explanation:

Because the failure appeared during a test that used a network mapping, first validate the mapping, addressing, routing, and rules required for web-to-database communication. This directly isolates a likely recovery-network configuration issue without changing healthy production. An unplanned failover is disproportionate and risks service disruption. Increasing memory does not address connectivity, and deleting the policy or recreating VMs would destroy useful diagnostic context without resolving a demonstrated network cause.

Question 8

New Single answer

Topic: Perform Business Continuity & Disaster Recovery (BCDR) Tasks

Skill tested: Restore a VM to a selected recovery point while preserving the active workload.

A finance analyst accidentally overwrote a configuration file inside a production VM. The VM is still running and has continued processing valid transactions since the overwrite. The team needs the file as it existed at the previous recovery point, but must not roll the entire VM back and discard later valid data. The file is available in a Nutanix snapshot. Which recovery method best satisfies the requirement?

Correct Answer: D. Use the supported self-service or guest-level restore workflow to retrieve the required file from the recovery point.
Explanation:

The requirement is to recover one file while retaining later valid VM activity. A file-level or self-service restore from the snapshot addresses that scope without reverting the whole VM. Reverting or replacing the VM would roll back unrelated changes and could disrupt ongoing transactions. A new recovery point would capture the current state, including the overwritten file, rather than retrieve its prior contents.

Question 9

New Multiple answers

Topic: Perform Business Continuity & Disaster Recovery (BCDR) Tasks

Skill tested: Complete safe post-failover cleanup after a DR exercise or recovery event.

After a controlled failover exercise, the application is running at the recovery site and the business has approved returning normal operations to the primary site. The test created temporary recovery VMs and used a test network. The team must avoid duplicate active instances, preserve the intended production data, and restore the normal protection relationship. Which two actions belong in a disciplined cleanup and return process? Select TWO.

Correct Answer: A. Remove temporary test resources and test network artifacts after confirming they are no longer needed.; D. Confirm the authoritative application instance and data state, then follow the supported reverse or return workflow before resuming normal protection.
Explanation:

A safe return establishes which instance contains authoritative writes and uses the supported workflow to synchronize or return service before normal protection resumes. Removing temporary test VMs and network artifacts prevents clutter and accidental exposure once they are no longer needed. Simultaneously activating both copies risks conflicting writes or duplicate identities. Deleting retained recovery points can violate retention requirements, and blindly restarting replication without establishing data authority risks propagating the wrong state.

Question 10

New Single answer

Topic: Perform Business Continuity & Disaster Recovery (BCDR) Tasks

Skill tested: Migrate legacy protection domains to policy-based protection with verified workload coverage.

An administrator is moving several workloads from a legacy protection-domain workflow to policy-based protection. Some VMs are protected by multiple legacy arrangements, and the application owners require continuity of protection throughout the change. The organization also wants to use categories to apply consistent policies to workload groups. Which migration approach is most appropriate?

Correct Answer: B. Inventory workload membership and recovery requirements, assign the intended categories and policies, verify protection at the destination, and retire legacy protection only after coverage is confirmed.
Explanation:

A continuity-preserving migration starts by understanding workload membership and requirements, then applies the intended policy and verifies that each workload has the expected protection and destination recovery points. Legacy arrangements should not be removed until replacement coverage is confirmed. Deleting protection first creates an avoidable gap. Cluster-wide policy assignment is not a substitute for confirming workload selection, and categories organize workloads rather than representing individual snapshots.

Question 11

New Single answer

Topic: Perform Business Continuity & Disaster Recovery (BCDR) Tasks

Skill tested: Choose the correct restore scope when recovering workload data from a snapshot.

A database administrator must recover a VM to a known-good state after an operating-system update made it unbootable. The application team confirms that no business data written after the selected snapshot needs to be preserved, and maintenance approval permits replacement of the current VM state. The recovery point is available and the target environment has sufficient resources. Which action most directly meets the request?

Correct Answer: D. Restore the VM from the selected recovery point, validating the intended target and network settings before returning it to service.
Explanation:

The failure affects the VM's bootable operating-system state, and the owner has explicitly accepted rollback of later writes. Restoring the VM from the selected recovery point is therefore the appropriate recovery scope. A single-file restore is insufficient unless the exact repairable file is known, which is not the stated case. A new snapshot would preserve the damaged state, while changing network settings does not repair the operating system.

Question 12

New Single answer

Topic: Troubleshoot Business Continuity & Disaster Recovery (BCDR) Failures

Skill tested: Trace replication state and error indications to isolate a stalled protection workflow.

A protected VM has not produced a recent recovery point at the target. The protection interface reports that replication is pending, while recent transfers for other workloads succeed. The source and target clusters are reachable, and target capacity is available. The team wants to identify the VM-specific cause before changing policy settings or network rules. What should the administrator do first?

Correct Answer: A. Inspect the affected entity's protection and replication status details, including the reported task or error, and correlate them with the relevant event information.
Explanation:

The issue is isolated to one VM while other transfers and basic site reachability work. Examining its replication state, task or error details, and correlated events is the least disruptive way to identify a workload-specific cause before changing shared infrastructure. Broad firewall changes are unjustified and unsafe. Increasing frequency may add load without resolving the pending operation, and removing protection destroys coverage and diagnostic evidence.

Question 13

New Multiple answers

Topic: Troubleshoot Business Continuity & Disaster Recovery (BCDR) Failures

Skill tested: Diagnose replication failures by separating path, destination-capacity, and policy causes.

A protection policy reports repeated replication failures for a group of VMs. Some workloads complete successfully, but a subset repeatedly falls behind its recovery-point objective. The target cluster is online and the policy remains assigned. The operations team must narrow the fault without changing the schedule blindly. Which two checks are most useful next? Select TWO.

Correct Answer: B. Check target storage capacity and the relevant inter-site network path for the affected transfers.; D. Inspect the failed entities' replication task details and event or error indications to identify a common failure stage.
Explanation:

Task and event details can distinguish a policy, entity, or transfer-stage error, while checking destination capacity and the path addresses common causes of failed or delayed replication. The fact that some workloads succeed makes targeted comparison especially useful. Shortening every schedule can increase transfer pressure and does not diagnose the fault. Deleting unrelated recovery points and changing VM memory do not address the reported replication failure and can introduce additional risk.

Question 14

New Single answer

Topic: Troubleshoot Business Continuity & Disaster Recovery (BCDR) Failures

Skill tested: Identify network configuration issues that prevent recovered VMs from reaching required services.

A failover completed and the recovered VMs are running, but application clients at the recovery site cannot reach the service. The recovery operation used the documented network mapping, and VM console access works. The security team confirms that the relevant service ports are permitted between the recovery subnet and client network. No comparable production-network issue exists. What is the most appropriate next troubleshooting step?

Correct Answer: D. Check the recovered VMs' IP configuration, gateway, DNS settings, and the recovery network's routing to the client subnet.
Explanation:

The VMs are running and permitted service ports are confirmed, so the next useful checks are addressing, default gateway, DNS, and route reachability in the recovered network context. These settings can differ from production even when a documented mapping was used. Repeating failover without diagnosing the network risks reproducing the issue. Disabling all security controls is excessive, and CPU allocation does not correct an incorrect address or route.

Question 15

New Single answer

Topic: Troubleshoot Business Continuity & Disaster Recovery (BCDR) Failures

Skill tested: Troubleshoot third-party backup integration failures using job status and integration error details.

A backup team reports that its third-party backup workflow no longer captures new Nutanix VM recovery points. Nutanix replication between the two sites is healthy, and the VMs remain protected by their BCDR policy. The backup application shows failed jobs, but the team has not yet confirmed whether the failure is authentication, connectivity, or a change in the backup integration configuration. What should the administrator do next?

Correct Answer: C. Review the failed backup job and integration error details, then validate the configured credentials, permissions, and connectivity required by that integration.
Explanation:

Healthy BCDR replication shows that the site-to-site protection path is functioning, but it does not prove that the separate backup integration can authenticate or communicate successfully. The failed job details should guide targeted checks of credentials, permissions, and connectivity for that integration. Deleting the protection policy is unrelated and would reduce resilience. Changing replication frequency or rebooting VMs does not address a backup job's integration failure and could disrupt service.