Question 1

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correct answe rs to this question.

Correct Answer: B. Check the log files written in the SUM directory, subdirectory abap, subdirectory log.; D. Check the Charts Control Center in the SUM UI.

Question 2

You want to use the Custom Code Migration Worklist via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?

Correct Answer: C. Download it from the SAP Support Portal.

Question 3

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answe rs to this question.

Correct Answer: B. SAP S/4HANA conversion without DMO; C. Prerequisite check; E. SAP S/4HANA conversion including DMO

Question 4

You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

Correct Answer: A. Using R3load and memory pipes

Question 5

You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answe rs to this question.

Correct Answer: A. Import a transport request from the development system that contains the recording of the activation.; B. During conversion, SUM delivers some business functions already activated.

Question 6

You are executing as SAP S/4HANA Conversion with scenario strategy Standard.When will the shadow instance be stopped for the last time?

Correct Answer: D. At the end of the downtime