Free US Green Building Council LEED AP Interior Design + Construction V4 LEED-AP-ID-C Exam Questions
Page: 1 / 10Total 100 questions
Want more questions? Get Premium Access.
Question 1
For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to
Correct Answer:B. at least eight diverse uses
Explanation:
For the Location and Transportation Credit concerning Bicycle Facilities, the LEED v4.1 reference guide specifies that the bicycle network must connect to at least eight diverse uses. This requirement ensures that cyclists have access to a variety of services and amenities, promoting the use of bicycles as a sustainable mode of transportation.
Question 2
When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?
A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?
To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?
Correct Answer:B. Items that are demolished and not replaced
In the context of LEED AP Interior Design + Construction, especially under Materials and Resources Credit for Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, the aim is to encourage the reuse of interior nonstructural elements to reduce the need for new materials and minimize waste. The calculation for this credit involves determining the area of interior nonstructural elements that are reused. Items that are demolished and not replaced are included in this calculation because their non-replacement implies a reduction in the demand for new materials, thereby contributing to resource conservation and waste minimization. This approach aligns with the LEED principles of sustainable materials management and waste reduction. It's important to note that the calculation excludes elements that are not part of the interior nonstructural scope, such as exterior windows, doors, and structural floor assemblies. Hazardous materials remediated as part of the project are also excluded, as their handling is governed by specific environmental and health safety regulations.
Reference:
LEED v4 for Interior Design and Construction Reference Guide
LEED v4 BD+C Reference Guide, specifically the sections related to Materials and Resources Credit, Interiors Life Cycle Impact Reduction
Question 5
Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?
Correct Answer:B. A sink in a private office bathroom
Explanation:
Within the context of the Water Efficiency Credit for Indoor Water Use Reduction in LEED, a private lavatory faucet refers to a sink that serves a non-public, individual space. This typically includes faucets in bathrooms that are designated for use by a single person or a specific occupant and are not accessible to the general public or shared among multiple users. A sink in a private office bathroom fits this definition as it is intended for the exclusive use of the occupant of the private office. In contrast, sinks in shared office restrooms, employee restrooms in retail stores, or even in private hotel room bathrooms are accessible to a broader group of users and do not meet the criterion of being a 'private lavatory faucet' for the purpose of this credit.
Reference:
LEED v4 for Interior Design and Construction Reference Guide, particularly the section on Water Efficiency Credit, Indoor Water Use Reduction, which details the fixture types and their classifications.
Question 6
Which of the following statements is correct when defining the project boundary?
Correct Answer:D. Contiguous land that is associated with the project that is altered as a result of construction must be included
A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.
Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?
Correct Answer:C. ANSI/ASHRAE/IESNA Standard 90.1-2010
Explanation:
The ANSI/ASHRAE/IESNA Standard 90.1-2010 is the benchmark for energy efficiency in building design, providing minimum requirements for the energy-efficient design of buildings except low-rise residential buildings. It is directly referenced in LEED v4 for the Energy and Atmosphere Credit, Optimize Energy Performance, as it sets the baseline for energy performance.
Question 8
A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities. Providing which of the following is a minimum requirement to earn the credit?
Correct Answer:B. At least one on-site shower and changing facility for employees
A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?
Correct Answer:B. Not an employee of the project design firm
Explanation:
The Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning, must be independent of the project's design and construction management to avoid conflicts of interest. This ensures that the Cx agent can objectively assess the project's performance and adherence to design intentions.
Question 10
A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
Correct Answer:D. The Cx agent for the project must return and conduct or oversee the commissioning of the PV system
Explanation:
For LEED projects, the commissioning (Cx) process is critical to ensure that all building systems are designed, installed, tested, and capable of being operated and maintained according to the owner's operational needs, including energy efficiency and sustainability goals. If a photovoltaic (PV) system is installed after the initial commissioning process has been completed, it is essential for the original Commissioning Authority (CxA) to return and either conduct or oversee the commissioning of the newly installed PV system. This ensures that the PV system is integrated properly into the building's overall energy management strategy and that it performs according to design specifications, contributing to the building's energy efficiency and sustainability goals as outlined in the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification.
Reference:
LEED v4 for Building Design and Construction Reference Guide, specifically the section on Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification