Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free CIPS Achieving Competitive Advantage Through the Supply Chain L5M7 Exam Questions

Last updated: · 11 practice questions with answers and explanations

Page: 1 / 9 Total 88 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: 1.0 Understand the dynamics of supply chains

Skill tested: Compares supply network structures against demand uncertainty and responsiveness requirements.

A manufacturer of specialist medical devices buys a common electronic component from a global market and a customised sterile assembly from a nearby supplier. Demand for the devices is volatile, while the component is inexpensive to hold and the assembly must be configured to changing clinical requirements. The manufacturer currently uses the same forecast-driven replenishment policy and long planning horizon for both supply streams. It wants to improve responsiveness without increasing inventory across the entire network. Which redesign is most appropriate?

Correct Answer: D. Use an efficient, forecast-driven network for the common component and a responsive, demand-led network for the customised assembly.
Explanation:

The common component has relatively stable, predictable supply characteristics and can be sourced through an efficient network focused on scale, utilisation and cost. The customised assembly faces volatile requirements and needs a responsive network with shorter lead times and the ability to adapt to actual demand. Applying one policy to both streams ignores their different demand and supply characteristics. Increasing inventory for the assembly in A may tie up capital without resolving responsiveness; B reverses the fit; and consolidating both streams with a global source could increase the response time for the customised item.

Question 2

New Multiple answers

Topic: 1.0 Understand the dynamics of supply chains

Skill tested: Assesses how collaborative relationships affect risk allocation, information sharing and network performance.

A food producer relies on a small specialist ingredient supplier whose capacity is constrained. The producer has repeatedly experienced shortages because its forecasts are sent late and the supplier cannot see changes in retail promotions. Procurement is considering a multi-year relationship, but the finance director is concerned that collaboration could weaken price discipline and create dependency. The supplier is willing to share capacity and cost information if the producer provides credible volume visibility. Which TWO measures best support a collaborative relationship while managing the stated risks? Select TWO.

Correct Answer: C. Agree joint capacity planning and review service, cost and continuity measures at scheduled intervals.; E. Share promotion and demand data regularly, with agreed rules for confidentiality and permitted use.
Explanation:

Timely, governed information sharing addresses the immediate cause of shortages and gives the supplier a basis for capacity planning. Jointly agreed performance and continuity reviews create accountability and allow both parties to identify risks rather than relying on goodwill alone. Exclusive award without evidence, as in B, heightens dependency. Transferring all inventory risk to the supplier in D is unlikely to create sustainable collaboration, while withholding demand data and relying on spot tenders in E preserves an adversarial model that does not solve the planning problem.

Question 3

New Single answer

Topic: 1.0 Understand the dynamics of supply chains

Skill tested: Evaluates supply network resilience when balancing sourcing efficiency with disruption exposure.

A retailer sources a high-volume packaging material from one overseas producer. The arrangement has delivered low prices, but a recent port closure caused a prolonged shortage. The material is technically standard, yet qualification of a new source takes several months. The retailer cannot justify maintaining large finished-goods inventories and wants to reduce the likelihood that one disruption will stop production. Which network change is the most appropriate?

Correct Answer: A. Qualify a geographically independent second source and allocate some baseline volume to maintain its readiness.
Explanation:

A qualified second source in a different geography reduces dependence on one producer and one disruption corridor. Allocating it some baseline volume helps preserve capability and ensures that qualification is operationally meaningful, although the exact allocation should reflect economics and capacity. A longer contract with the same source does not diversify risk. A distributor may provide no resilience if it relies on the same upstream producer, and inventory alone in D is constrained by the stated inability to hold large stocks and leaves the underlying exposure unchanged.

Question 4

New Single answer

Topic: 1.0 Understand the dynamics of supply chains

Skill tested: Selects an appropriate relationship model for innovation and interdependent supplier investment.

An engineering firm is developing a new low-carbon production process. A specialist equipment supplier must contribute proprietary design knowledge and make substantial tooling investments before the customer can confirm final specifications. The customer needs to protect intellectual property and demonstrate that supplier selection was defensible, but repeated competitive tenders would expose designs and discourage investment. Which sourcing and relationship approach best balances these requirements?

Correct Answer: A. Use a transparent, criteria-based competitive selection, then establish a governed development partnership with agreed intellectual-property and investment terms.
Explanation:

A structured competitive selection preserves defensibility at appointment, while a governed partnership supports the joint development and supplier-specific investment that the project requires. Clear terms should address confidentiality, ownership or permitted use of intellectual property, investment commitments, milestones and change control. Repeated tenders in A can undermine continuity and expose sensitive information. C lacks a defensible selection process and leaves a major contractual risk unresolved. A catalogue purchase in D avoids collaboration but does not meet the stated innovation requirement.

Question 5

New Single answer

Topic: 2.0 Understand improvement methodologies that can be used in supply chains

Skill tested: Applies Lean flow analysis to identify and remove waiting and excess work in a supply process.

A distribution centre receives urgent orders from stores in large batches twice each week. Staff pick the orders immediately, but completed pallets often wait several days for a scheduled consolidation and dispatch. Store demand is relatively steady, and transport can accommodate smaller, more frequent shipments if the extra handling is controlled. Management wants to reduce order lead time and work in progress without simply adding labour. Which improvement is most consistent with Lean principles?

Correct Answer: A. Map the end-to-end flow, identify the dispatch queue as a source of waiting, and pilot smaller replenishment batches aligned to demand.
Explanation:

The scenario points to waiting and excess work in progress between picking and dispatch, not a lack of picking capacity. Mapping the value stream helps expose the queue and its causes; a controlled pilot of smaller, demand-aligned batches can improve flow and reduce lead time. Larger batches in A increase the queue, while added inspection in C does not address the delay. A larger staging area in D may relieve congestion but merely accommodates the waste rather than removing it.

Question 6

New Multiple answers

Topic: 2.0 Understand improvement methodologies that can be used in supply chains

Skill tested: Distinguishes value analysis from specification reduction that could compromise required function.

A public-sector buyer is reviewing the cost of a frequently purchased maintenance kit. Users need the kit to meet specified safety and operating functions, but the current specification includes several features inherited from an older design. The buyer wants to reduce whole-life cost without reducing required performance or transferring hidden costs to maintenance teams. Which TWO actions best apply value analysis? Select TWO.

Correct Answer: B. Compare alternative designs and supply options against function, quality, lifecycle cost and risk.; C. Identify the functions users require and challenge whether each specification feature contributes to those functions.
Explanation:

Value analysis begins by understanding required functions, then examines ways to deliver them at lower whole-life cost while preserving necessary performance. Challenging inherited features and evaluating alternatives against lifecycle cost and risk follow that logic. Removing costly components without assessing function, as in B, may compromise safety or performance. D optimises purchase price while ignoring the stated concern about maintenance costs, and E assumes that the current specification is already optimal rather than testing it.

Question 7

New Single answer

Topic: 2.0 Understand improvement methodologies that can be used in supply chains

Skill tested: Uses value engineering during design to optimise required function and lifecycle cost.

A manufacturer is designing a new modular pump. Its engineers have fixed the required flow rate, operating life and safety criteria, but the proposed design uses a costly custom casing and a complex assembly sequence. The product has not yet entered production, and the team can still change materials and architecture. The aim is to meet the required functions at lower total cost without increasing failure risk. Which approach should the team use next?

Correct Answer: B. Apply value engineering to generate and assess alternative design concepts against function, lifecycle cost and technical risk.
Explanation:

Value engineering is suited to the design stage, when alternatives can still be developed to achieve required functions at lower lifecycle cost. The team can compare casing materials, architecture and assembly methods while retaining safety, performance and reliability requirements. Value analysis in B is more commonly applied to an existing product or process. A price negotiation in C may help but does not examine design-driven cost, and removing safety criteria in D would invalidate the comparison and introduce unacceptable risk.

Question 8

New Multiple answers

Topic: 2.0 Understand improvement methodologies that can be used in supply chains

Skill tested: Chooses Lean interventions that reduce process variation and prevent recurring supply-chain defects.

A manufacturer receives a recurring proportion of supplier deliveries with incorrect labels. The errors create receiving delays and occasional line-side picking mistakes. The supplier's process varies by shift, and historical records are inconsistent. The manufacturer wants to improve quality at source rather than add inspection indefinitely. It can work with the supplier on a time-limited improvement project, but it cannot stop production while the process changes. Which TWO actions are the best initial improvement measures? Select TWO.

Correct Answer: B. Work with the supplier to identify causes and trial a process control or mistake-proofing change on a limited scope.; E. Establish a consistent defect baseline by recording label errors and their process conditions across shifts.
Explanation:

A reliable baseline makes the scale and pattern of the problem visible, especially where performance varies by shift. Root-cause investigation followed by a controlled trial of process control or mistake-proofing targets prevention at source while limiting disruption. Permanent blanket inspection in B detects defects but does not prevent them and may add continuing cost. Reducing defect categories in D obscures evidence, while penalties in E may encourage defensiveness without establishing or correcting the underlying cause.

Question 9

New Single answer

Topic: 3.0 Understand measures required to achieve competitive advantage in supply chains

Skill tested: Evaluates open-book costing as a basis for cost transparency and joint cost improvement.

A buyer has a long-term relationship with a contract manufacturer, but negotiations repeatedly focus on percentage price reductions without explaining the cost drivers. The supplier says raw material prices and energy costs have changed, while the buyer suspects avoidable process costs. Both parties want credible savings and continuity, but the supplier will not disclose commercially sensitive information to the buyer's wider organisation. Which arrangement is most appropriate?

Correct Answer: D. Agree a defined open-book costing model with suitable confidentiality controls, an agreed cost baseline and joint improvement targets.
Explanation:

A scoped open-book arrangement can make relevant cost drivers visible while confidentiality controls protect sensitive information. An agreed baseline allows the parties to distinguish external changes from controllable costs and to share or otherwise recognise verified improvements through governance. Unrestricted disclosure and an automatic fixed reduction in A may be disproportionate and disconnected from actual cost movements. Spot tenders in C prioritise price comparison without addressing the relationship's cost drivers, while D removes the evidence needed for credible decisions.

Question 10

New Multiple answers

Topic: 3.0 Understand measures required to achieve competitive advantage in supply chains

Skill tested: Selects pricing and incentive mechanisms that align supplier behaviour with measurable outcomes.

A logistics provider is paid a fixed monthly fee for a regional distribution service. The customer needs reliable on-time delivery but also wants to reduce avoidable empty mileage. The provider controls route planning, while weather and customer-requested delivery changes are outside its control. The current contract applies a single service credit for any missed delivery and offers no benefit for efficiency improvements. Which TWO changes would create a more balanced performance mechanism? Select TWO.

Correct Answer: C. Define an on-time performance measure with agreed exclusions for evidenced events outside the provider's control.; E. Add a measurable empty-mileage improvement target and a transparent method for validating performance and sharing gains.
Explanation:

A fair performance framework measures outcomes the provider can influence while defining how exceptional external events are treated. A validated empty-mileage target aligns an incentive with a controllable efficiency opportunity, and a transparent gain-sharing method supports collaboration. Unlimited penalties in B disregard causation and can distort behaviour. Provider-controlled pricing in D removes contractual discipline, while E could reduce capacity in ways that harm on-time delivery because service is not monitored alongside the cost measure.

Question 11

New Single answer

Topic: 3.0 Understand measures required to achieve competitive advantage in supply chains

Skill tested: Selects a pricing structure that allocates cost risk appropriately over a defined contract term.

A buyer is negotiating a three-year supply agreement for a standard manufactured component. The design and expected quantities are stable, production methods are established, and the supplier can reasonably forecast its costs. The buyer wants budget certainty and an incentive for the supplier to improve productivity. There is no reliable external index that would fairly track the supplier's relevant input costs, and the buyer does not want to administer frequent cost adjustments. Which pricing approach best meets these requirements?

Correct Answer: D. Use a fixed price for the term, with clearly defined scope and a mechanism for agreed changes to requirements.
Explanation:

Given stable scope, established production and forecastable costs, a fixed price offers the requested budget certainty and leaves the supplier with an incentive to improve its productivity. The contract should still define how genuine changes in scope are handled. Cost-plus pricing in B weakens the incentive to control costs. C transfers price movements using an irrelevant index, while D creates administrative burden and relies on unverified information, contrary to the buyer's constraints.