Free Huawei HCS Microwave Hardware Installation (Written) H35-911 Exam Questions

Last updated: · 10 practice questions with answers and explanations

Page: 1 / 6 Total 60 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Microwave transmission principles

Skill tested: Assesses link-planning decisions involving Fresnel-zone clearance and multipath fading.

A regional operator is planning a microwave hop across a shallow valley. A preliminary path profile shows that the line between antenna centers is unobstructed, but a ridge and nearby terrain intrude into the lower portion of the first Fresnel zone. The path also crosses a flat, reflective area where seasonal water levels vary. The planned frequency and link endpoints cannot be changed, and the operator needs stable availability rather than merely a visible optical path. Which planning action best addresses the propagation risks before the link is approved?

Correct Answer: B. Evaluate first-Fresnel-zone clearance and reflection effects, then adjust antenna heights or path geometry where feasible.
Explanation:

A clear line between antenna centers does not by itself ensure adequate propagation. Terrain intrusion into the first Fresnel zone can cause diffraction loss, while a reflective surface can create multipath fading whose severity may change with water level. The path should be analyzed for Fresnel clearance and reflection conditions, with antenna heights or geometry adjusted if feasible. More transmit power does not eliminate frequency-selective fading or obstruction loss, and narrowing the channel does not resolve the underlying propagation path.

Question 2

New Multiple answers

Topic: Microwave hardware components

Skill tested: Assesses selection and verification of antenna, radio, and feeder components for an outdoor link.

A field team is replacing a legacy outdoor radio on a licensed point-to-point hop. The existing antenna has a known gain and polarization, but its interface and the replacement radio's supported frequency range have not yet been confirmed. The site has limited mast space, so adding a second antenna is undesirable. Before installation, the team must ensure that the selected hardware can operate together without introducing avoidable RF loss or a polarization mismatch. Which THREE checks are most appropriate? Select THREE.

Correct Answer: C. Verify the antenna-to-radio interface and any required waveguide or feeder components for compatibility.; D. Match the antenna polarization to the radio link plan and the far-end antenna polarization.; E. Confirm that the radio's supported frequency range includes the assigned operating channel.
Explanation:

The radio must support the assigned frequency, and both ends of the link must use compatible polarization to avoid substantial polarization mismatch loss. The physical RF interface and the required feeder or waveguide must also match the radio and antenna; unsuitable or excessive interconnects can add loss or prevent installation. Maximum transmit power cannot compensate for operation outside the radio's supported range. A larger antenna is not automatically suitable and should not be selected without confirming its band, interface, and installation constraints.

Question 3

New Single answer

Topic: Site survey and planning

Skill tested: Evaluates site-survey prioritization for line of sight, mounting, access, and interference risks.

A contractor is surveying a rooftop for a new microwave terminal. The proposed antenna position appears to have a clear view of the remote site from ground level, but the roof contains several existing antennas and a nearby structure that may affect the upper part of the path. The building owner restricts structural work, and the maintenance team needs safe access for future alignment. Which survey action should be completed before finalizing the installation position?

Correct Answer: D. Survey the proposed antenna position and elevation for path clearance and obstructions, verify mounting feasibility and access, and record site constraints.
Explanation:

A useful site survey must assess the actual proposed antenna location and elevation, including path clearance, nearby obstructions, mounting feasibility, and safe maintenance access. It should also document building-owner restrictions that affect the design. A ground-level visual estimate or a basic received-signal check does not establish adequate Fresnel clearance or long-term structural suitability. The shortest cable route may be convenient but cannot replace path and mount validation, while choosing the highest point without checking structure and interference can create new problems.

Question 4

New Multiple answers

Topic: Installation procedures

Skill tested: Assesses safe grounding, weatherproofing, and cable routing practices for outdoor microwave equipment.

During installation of an outdoor microwave unit, a crew must route its signal and power connections from a rooftop mast to an indoor equipment area. The route passes exposed roof sections and an entry point through the building envelope. The site procedure requires protection against lightning-related surges, water ingress, and cable damage; the installation must also remain serviceable. Which THREE practices should the crew follow? Select THREE.

Correct Answer: A. Bond the mast and equipment grounding points to the site grounding system using the prescribed conductors and connections.; C. Install the required surge-protection and grounding arrangements at the specified cable entry or equipment locations.; D. Secure and protect cables along the route, maintain specified bend limits, and seal the building entry against water ingress.
Explanation:

A reliable outdoor installation bonds the mast and equipment into the site grounding system, applies the required surge-protection arrangement, and routes cables so that they are mechanically protected and remain within specified bend limits. Sealing the building penetration helps prevent water ingress. A cable shield should not be treated as the sole substitute for the prescribed bonding and grounding system. Leaving an entry unsealed invites moisture and water damage rather than providing a dependable drainage method.

Question 5

New Single answer

Topic: Equipment configuration

Skill tested: Assesses matching endpoint RF parameters and link identity before bringing a microwave hop into service.

A technician is commissioning a newly installed point-to-point microwave hop. Both radios are powered and reachable through their management interfaces, but the carrier does not establish. The approved link plan specifies the channel pair, channel bandwidth, polarization, and the transmit/receive arrangement for each endpoint. A recent software template was applied to both radios, and the technician suspects that the template may have used identical endpoint values. What is the best next configuration action?

Correct Answer: D. Verify each endpoint against the approved link plan, correcting the paired frequency and role-specific RF settings while preserving the planned bandwidth and polarization.
Explanation:

A point-to-point hop requires compatible endpoint settings, including the planned channel arrangement and bandwidth, as well as the correct endpoint-specific transmit/receive configuration and polarization. The applied template may have assigned identical values where paired or role-specific values are required. Comparing each radio with the approved link plan is the controlled next step. Increasing power does not correct a configuration mismatch; mismatched bandwidth prevents proper operation, and factory reset or automatic discovery is not a substitute for planned commissioning.

Question 6

New Single answer

Topic: Testing and optimization

Skill tested: Evaluates use of commissioning measurements to distinguish alignment loss from service-quality issues.

A newly commissioned hop shows a received signal level several decibels below its engineered expectation. The link is carrying little traffic, and the radio reports no major hardware alarm. The crew has recorded the antenna alignment position but has not yet completed the acceptance measurements. The operator requires a documented baseline before releasing the link to service. Which action is the most appropriate next step?

Correct Answer: A. Compare measured receive level and relevant radio performance indicators with the link budget, then verify alignment and connections before changing optimization parameters.
Explanation:

Commissioning should establish whether the measured received level and performance indicators agree with the engineered link budget. If the receive level is low, the crew should verify antenna alignment and inspect RF connections and other installation factors before changing parameters. Raising power may mask a fault or violate the planned configuration and does not produce a useful baseline. Traffic volume does not raise received RF level, and changing bandwidth without measurements can obscure the cause and compromise the approved design.

Question 7

New Single answer

Topic: Troubleshooting

Skill tested: Assesses fault isolation for intermittent microwave link degradation after weather changes.

A microwave hop has intermittent degradation that began after several days of heavy rain. The radio's management connection remains available, but traffic errors increase during wet periods. No configuration change has been made, and the site uses outdoor RF connections and exposed cable runs. The operations team wants a first investigation that can distinguish a weather-sensitive installation fault from a permanent radio configuration problem. What should the technician do first?

Correct Answer: B. Inspect and verify weatherproofing, connectors, cable condition, and antenna alignment, correlating observations with the degradation.
Explanation:

A degradation pattern correlated with rain makes outdoor connections, seals, cable condition, and water ingress important early checks; movement or deterioration affecting alignment should also be considered. These checks can identify an installation-related cause without making disruptive configuration changes. Changing frequency or bandwidth before collecting evidence may introduce additional variables. Replacing radios without isolating the fault is premature, and suppressing alarms or raising power hides symptoms rather than resolving their cause.

Question 8

New Multiple answers

Topic: Safety procedures

Skill tested: Assesses work-at-height, RF exposure, and electrical isolation controls during microwave maintenance.

A maintenance crew must replace an outdoor radio mounted on a rooftop mast at an operating telecommunications site. The work is scheduled during a short service window, and other radio equipment remains active nearby. The site requires a safe work plan that protects personnel without creating an avoidable exposure or electrical hazard. Which THREE controls should be included before the crew begins? Select THREE.

Correct Answer: A. Assess nearby RF sources and follow the applicable RF exposure controls, including coordination or shutdown where required.; C. Apply the site's work-at-height controls, including suitable fall protection and verified safe access.; E. Identify and isolate the relevant electrical supply as required, then verify the safe condition before handling power connections.
Explanation:

Work at height requires appropriate access and fall-protection controls regardless of how short the task is. Nearby transmitters must be assessed for RF exposure, with coordination or shutdown applied where the site's limits and procedures require it. Relevant electrical supplies should be identified and isolated as required, and the safe condition verified before power connections are handled. A short work window does not remove these hazards. Disconnecting protective grounding increases electrical risk and is not an acceptable control.

Question 9

New Single answer

Topic: Microwave transmission principles

Skill tested: Assesses interference diagnosis using spectrum observations and controlled link measurements.

An operator notices intermittent throughput reductions on a point-to-point hop. The received signal level is generally stable, but error rates rise during certain periods of the day. A neighboring site recently activated another microwave link, and the affected hop's planned frequency assignment is documented. The operator wants to determine whether interference is the likely cause before altering the link configuration. Which action provides the most defensible initial evidence?

Correct Answer: C. Compare the affected link's performance with time-correlated spectrum observations and inspect for energy or interference on relevant channels.
Explanation:

Stable received level does not rule out interference: a competing signal can raise errors and reduce throughput without a corresponding large change in the desired signal level. Time-correlating performance symptoms with spectrum observations on relevant channels provides evidence before the configuration is changed. Raising transmit power can worsen interference to other links and mask the cause. A one-ended polarization change creates a mismatch, and permanently reducing modulation without diagnosis sacrifices capacity while leaving the suspected interference unresolved.

Question 10

New Multiple answers

Topic: Equipment configuration

Skill tested: Evaluates controlled configuration verification and acceptance checks for a commissioned microwave link.

A microwave hop has been configured according to an approved link plan and now reports an established carrier. Before handover, the operations engineer must ensure the configuration is reproducible and that the link is suitable for service. The acceptance process requires retaining an auditable record and verifying that the live configuration and observed performance match the approved design. Which THREE actions best satisfy these requirements? Select THREE.

Correct Answer: B. Record the final configuration and relevant commissioning measurements as the site baseline.; D. Verify link performance and alarms against the applicable acceptance criteria under representative operating conditions.; E. Compare the live endpoint settings with the approved link plan and resolve any discrepancies before handover.
Explanation:

An established carrier is necessary but does not alone demonstrate that the hop matches the approved design or meets service requirements. Comparing live settings with the plan detects configuration drift; recording final settings and commissioning measurements provides an auditable baseline; and checking performance and alarms against acceptance criteria confirms readiness. Unrecorded trial changes undermine reproducibility and can depart from the approved design. Omitting measurements leaves operations without evidence for later troubleshooting or performance comparison.