Limited-Time Offer: Enjoy 50% Savings! Ends in 00h 00m 00s Coupon code: 50OFF
Skip to content

Free OMG OMG-Certified Systems Modeling Professional - Model Builder - Intermediate OMG-OCSMP-MBI300 Exam Questions

Page: 1 / 9 Total 90 questions

Want more questions? Get Premium Access.

Question 1

Choose the correct answer.

The area of a rectangle is calculated through analysis of its height and width:

How is this represented in a model?

A)

B)

C)

D)

E)

Correct Answer: A. Option A

Question 2

Choose the correct answer.

Which diagram type is commonly used to create a bill of materials?

Correct Answer: C. Parametric diagram

Question 3

Choose the correct answer.

Given the following diagram fragment:

What does the multiplicity at the actor end mean?

Correct Answer: C. Two Initiator actor instances are required to participate in the use case.

Question 4

Choose the correct answer.

In the following bdd, A delegates both of its ports to B:

Which ibd correctly represents this?

A)

B)

C)

D)

Correct Answer: C. Option C

Question 5

Choose the correct answer.

Given the following diagram:

What is element C?

Correct Answer: C. a connector property

Question 6

Choose the correct answer

What is an effective and efficient approach to project modeling standards and conventions?

Correct Answer: D. The SysML specification and the modeling tool documentation are sufficient to describe modeling standards and conventions

Question 7

Choose the correct answer.

Given the following state machine, and assuming that it starts from initialization:

Which option is the shortest sequence of events that will cause the machine to be in state E?

Correct Answer: B. e1, e2, e6, e7, e1

Question 8

Choose the correct answer.

Given the following diagram:

Which diagram is correct?

A)

B)

C)

D)

Correct Answer: C. Option C

Question 9

Choose the correct answer.

There is a requirement to count and prioritize widgets. While it is active, the action that implements this behavior will repeatedly accept a widget and immediately output a prioritized widget. A special "final" widget will cause the action to terminate and output the total count of widgets It processed

Which activity diagram fragment shows this action along with its inputs and outputs?

A)

B)

C)

D)

Correct Answer: A. Option A

Question 10

Choose the correct answer.

A system engineer has created a SysML block structure for his system-of-interest. Two of the blocks (M and E) represent system-level abstractions of components that will be designed by a mechanical engineer and an electrical engineer m their respective computer-aided design (CAD) tools.

Given that the CAD models are wrapped as blocks B_mcad and B_ecad, what type of diagram should the system engineer use to quantitatively relate the properties of B_mcad and B_ecad to their system level abstractions M and E respectively?

Correct Answer: B. a parametric diagram