Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Scaled Agile SAFe Advanced Scrum Master SAFe-SASM Exam Questions

Last updated: · 11 practice questions with answers and explanations

Page: 1 / 6 Total 60 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Exploring the Scrum Master Role

Skill tested: Facilitates team and ART collaboration while serving as a servant leader and coach.

A team's delivery has become predictable within its own boundaries, but it regularly discovers late in the iteration that its work depends on another ART team's interface. The Product Owner asks the Scrum Master to assign owners to the other team's tasks and require daily status reports so the team can protect its commitment. The other team has its own priorities and the ART already has established planning and synchronization events. What is the Scrum Master's best response?

Correct Answer: A. Coach the team to make dependencies visible, collaborate directly with the other team, and use ART events to align plans and resolve impediments.
Explanation:

The Scrum Master is a servant leader and coach who helps the team collaborate, make impediments visible, and work effectively within the ART. Direct coordination between the teams, supported by ART planning and synchronization, addresses the dependency without taking ownership away from the teams. Taking over another team's tasks confuses accountability and encourages command-and-control behavior. Removing all dependent work is not a viable general solution, and escalating before attempting collaboration bypasses the normal problem-solving path.

Question 2

New Multiple answers

Topic: Applying SAFe Principles

Skill tested: Applies economic thinking, incremental delivery, and option preservation to uncertain work.

A team is preparing a PI plan for a feature whose user demand is uncertain and whose implementation depends on a design decision that may be difficult to reverse. The business wants evidence early, but the team must also avoid committing substantial effort to a choice that has not been validated. Select TWO actions that best apply SAFe principles to this situation. Select TWO answers.

Correct Answer: B. Preserve design options where feasible and use economic trade-offs to decide when to commit to an irreversible choice.; E. Identify the most consequential assumptions and run a small experiment or thin slice to obtain feedback early.
Explanation:

A small experiment or thin slice provides fast learning while limiting the cost of acting on an unvalidated assumption. Preserving options and considering the economic consequences of commitment are especially important when a design choice is hard to reverse. Delivering only after all uncertainty is removed delays feedback, while maximizing utilization or freezing estimates prioritizes local efficiency and plan stability over value and adaptability. The two selected actions combine incremental development with an economic view.

Question 3

New Single answer

Topic: Exploring Agile and Scrum Anti-Patterns

Skill tested: Identifies Product Owner and task-management anti-patterns that undermine team ownership.

During iteration planning, a Product Owner presents a detailed task list, assigns each task to an individual, and asks the Scrum Master to report daily whether each person is on schedule. The Stories are already in the team backlog, but the developers say the task list does not reflect how they intend to complete the work. The Product Owner is trying to improve predictability after a missed iteration goal. What should the Scrum Master do first?

Correct Answer: C. Coach the Product Owner and team on the distinction between prioritizing outcomes and the developers' responsibility to plan and manage their work.
Explanation:

The Product Owner is accountable for value and backlog ordering, not for assigning implementation tasks to individuals. Developers plan the work and adapt their task approach as they learn. The Scrum Master should address the underlying anti-pattern through coaching, while helping the team and Product Owner inspect the causes of the missed goal. Accepting the task list reinforces micromanagement; transferring assignment to the Scrum Master preserves the same problem; and mandatory pre-planning task decomposition removes team ownership.

Question 4

New Single answer

Topic: Facilitating Program Execution

Skill tested: Coordinates PI execution by making cross-team dependencies visible and resolving them collaboratively.

Halfway through a PI, a team discovers that a committed feature requires a service change from another team. The dependency was discussed during PI Planning, but the teams recorded it only in meeting notes; no owner or follow-up was agreed. The service team now has competing work, and the feature is at risk. The ART uses regular team synchronization and ART-level coordination. What is the most appropriate next step for the Scrum Master?

Correct Answer: D. Raise the dependency with the affected teams, agree on an owner and resolution plan, and make the risk visible through ART coordination.
Explanation:

The teams should act on the dependency now: establish direct collaboration, agree who will do what by when, and make the risk visible to the ART so it can be managed. Recording a dependency in notes without ownership is insufficient. Waiting until the next PI permits avoidable delay, and unilaterally changing a shared service creates integration and quality risks. The Product Owner of one team cannot simply reprioritize another team's work; the teams and ART need to coordinate the trade-off.

Question 5

New Multiple answers

Topic: Improving Flow with Kanban and XP

Skill tested: Uses workflow policies and built-in quality practices to improve delivery flow.

A team's Kanban board shows many Stories accumulating in development and testing, while completed items frequently return for rework. Team members are measured on how many tasks they start, and they often begin new work while waiting for reviews. The team wants to improve flow without reducing its quality standards or adding staff. Which TWO changes are most appropriate? Select TWO answers.

Correct Answer: B. Make quality practices such as continuous integration, peer review, and appropriate automated testing part of the team's Definition of Done.; E. Set explicit work-in-process limits and encourage the team to finish existing work before starting more.
Explanation:

WIP limits expose bottlenecks and promote finishing work rather than creating additional queues. Built-in quality practices - such as continuous integration, peer review, and automated testing where appropriate - help prevent defects from surfacing late and causing rework. Increasing task starts worsens work in process; postponing testing increases feedback delay and risk; and hiding a congested workflow does not improve it. These changes address both flow and the quality problems described without adding capacity.

Question 6

New Multiple answers

Topic: Building High-Performing Teams

Skill tested: Builds cross-functional collaboration and team capability through shared learning and improvement actions.

A newly formed team has strong individual specialists but struggles to deliver a Story without repeated handoffs. Two people hold most of the knowledge for a critical component, and the team's retrospective repeatedly identifies this as a risk. The next PI has a demanding goal, so management proposes assigning each specialist a separate component and postponing development activities until the PI is over. The Scrum Master needs to improve resilience while keeping the team focused on delivery. Select TWO actions.

Correct Answer: D. Add capability-building and cross-team collaboration actions to an improvement backlog, then make progress visible and inspect it.; E. Create opportunities for pairing and knowledge sharing so more team members can contribute to critical work.
Explanation:

Pairing and deliberate knowledge sharing reduce dependence on a small number of specialists and help the team work across handoffs. Capturing concrete capability and collaboration actions in an improvement backlog makes team growth inspectable rather than an aspiration postponed indefinitely. Exclusive ownership increases the risk of bottlenecks; replacing people is neither necessary nor a Scrum Master decision; and optimizing individual utilization undermines collaboration and end-to-end delivery.

Question 7

New Single answer

Topic: Improving Program Performance

Skill tested: Facilitates the Inspect and Adapt problem-solving workshop to address systemic performance issues.

At the end of a PI, the ART has met its feature delivery target, but several teams report repeated integration failures and late rework. A single missed dependency contributed to the most visible incident, yet teams disagree about whether it was the root cause or merely a symptom. Leaders want an improvement that addresses the recurring pattern rather than assigning blame. What should the Scrum Master support during Inspect and Adapt?

Correct Answer: D. Facilitate a structured problem-solving workshop that examines the data, identifies root causes, and defines improvement actions with owners.
Explanation:

Inspect and Adapt is intended to use performance data and collective analysis to identify systemic issues and drive meaningful improvement. A structured problem-solving workshop helps the ART distinguish root causes from symptoms and agree on actions with ownership. Individual ratings encourage blame and do not address process causes. Selecting a root cause without analysis risks solving the wrong problem, while meeting a feature target does not erase recurring integration failures or justify deferring improvement.

Question 8

New Single answer

Topic: Exploring the Scrum Master Role

Skill tested: Selects coaching and facilitation responses that strengthen team ownership and self-management.

A team has repeatedly asked its Scrum Master to decide how to divide Stories among developers and to assign owners for every impediment. The team is capable, but members have become reluctant to make decisions because they fear disrupting the PI plan. The Product Owner agrees that the team should become more self-managing, while still needing visibility into progress and risks. What is the best next action?

Correct Answer: B. Facilitate a conversation in which the team agrees how to organize the work, surface impediments, and communicate risks while retaining ownership of its decisions.
Explanation:

A Scrum Master develops team capability by coaching and facilitating, not by becoming the team's work allocator. The team can decide how to organize its work and how to raise impediments while maintaining transparency about progress and risks. Continued assignment reinforces dependence, and Product Owner accountability for value does not extend to directing developers' tasks. Withdrawing facilitation altogether is not coaching; it removes support without helping the team build decision-making skills.

Question 9

New Single answer

Topic: Applying SAFe Principles

Skill tested: Uses working-system evidence and fast feedback to guide milestone decisions under uncertainty.

A leadership review is approaching, and a program team has prepared a milestone based on completed design documents and a forecast that the integrated system will work. A usable end-to-end slice is available, but it supports only a limited user workflow; additional scope is still uncertain. The milestone decision must provide credible evidence of progress, and the organization wants to learn before expanding the solution. What is the strongest basis for the review?

Correct Answer: A. Demonstrate the working end-to-end slice, gather feedback, and use the evidence to inform the next development decisions.
Explanation:

A working system provides stronger evidence than documents, forecasts, or task completion percentages. Demonstrating the available slice enables stakeholders to inspect actual behavior and provide feedback while the team can still adapt the remaining scope. Waiting for the full solution delays learning, and treating design documents or task completion as proof does not establish that integrated functionality works. The scenario calls for a credible milestone based on working-system evidence and incremental learning.

Question 10

New Single answer

Topic: Facilitating Program Execution

Skill tested: Prepares teams for PI Planning by clarifying readiness, dependencies, and decision-making needs.

Several weeks before PI Planning, a Scrum Master learns that one team's backlog contains broad feature requests but few refined Stories. Its key business stakeholder will be unavailable during planning, and a major dependency with another ART team has not been discussed. The organization cannot move the PI Planning dates, and the team needs to arrive able to make realistic plans. What should the Scrum Master do first?

Correct Answer: A. Coordinate with the Product Owner and relevant stakeholders to refine priorities, clarify decision coverage, and surface dependencies before planning.
Explanation:

Effective PI Planning preparation includes backlog refinement, stakeholder and decision-maker readiness, and early visibility of dependencies. The Scrum Master should help the Product Owner and stakeholders address these gaps before the event, while ensuring the team participates in planning its own work. Estimating broad features as commitments creates false precision. Waiting to reveal a dependency increases planning risk, and writing the team's Stories or objectives on its behalf takes ownership away from the appropriate roles.

Question 11

New Multiple answers

Topic: Improving Flow with Kanban and XP

Skill tested: Aligns team workflow and quality practices with architecture, system integration, and operational feedback.

A team owns a service that is integrated with other ART components. It often completes Stories locally, but integration defects appear only during late system testing; operational concerns such as supportability also arrive after implementation. The team has a Kanban workflow, but architecture and operations representatives are usually consulted only when a release is near. The ART needs more reliable, continuous delivery and cannot accept postponing integration or operational checks until the end. Select TWO actions.

Correct Answer: C. Include operational and supportability feedback in ongoing work and quality discussions, rather than waiting for release preparation.; D. Collaborate with architecture and the system team early and regularly on interfaces and integration concerns.
Explanation:

Early collaboration with architecture and the system team helps expose interface and integration risks while changes are still manageable. Ongoing operational input brings supportability concerns into the development process rather than discovering them near release. Late architectural review, local-only quality claims, and deferred integration all preserve the failure pattern in the scenario. Excluding integration work from the workflow hides a constraint instead of improving flow or reliability.