Question 1
Topic: PCCE Implementation Preparation
Skill tested: Plans PCCE deployment prerequisites, sizing, topology, and implementation dependencies.
A contact center is preparing a new PCCE deployment for a regional operation. The design team has collected agent counts, call volumes, and a proposed topology, but the business has not confirmed peak concurrency or retention requirements. The customer also wants to begin server procurement immediately and has reserved addresses from a subnet that overlaps an existing enterprise network. Which action is the best next step before committing the deployment design and infrastructure?
PCCE planning must establish validated capacity requirements, supported topology, and infrastructure prerequisites before deployment commitments. Peak concurrency and retention can affect sizing, while overlapping address space can prevent reliable routing and connectivity. Applicable design guidance should be used to confirm supported configurations. Procuring from average volume alone risks undersizing; postponing addressing remediation creates avoidable deployment risk; and measuring utilization after installation is not a substitute for predeployment sizing.