Free iSQI ISTQB Certified Tester Foundation Level - Performance Testing CTFL-PT Exam Questions

Last updated: · 12 practice questions with answers and explanations

Page: 1 / 7 Total 40 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Understand the principles of performance testing.

Skill tested: Derives measurable performance objectives from business service-level requirements.

An online insurer is replacing its policy-quotation service. The product owner says the new service must be "fast enough" for a seasonal launch. Existing business reports show that 95% of quote requests complete within 2.5 seconds during peak periods, and the launch forecast predicts up to 180 requests per second. The service is also required to remain usable during a planned 30-minute peak. The test team has one week to prepare and cannot change the business targets without approval. What should the team do FIRST to make the performance objective testable?

Correct Answer: A. Confirm the measurement scope and acceptance criteria, including the percentile, workload, and duration represented by the business requirement.
Explanation:

The existing evidence already identifies a percentile, a peak request rate, and a sustained period, but the team must confirm that these are the intended acceptance criteria and define the measurement boundary. Averages can conceal slow requests, so A discards the stated percentile requirement. The current service's best result is not a defensible target, and selecting a target after testing would make acceptance retrospective rather than objective.

Question 2

New Single answer

Topic: Recognize the different types of performance testing.

Skill tested: Selects a capacity-oriented test that identifies the system's maximum sustainable workload.

A ticketing company expects ordinary demand of 900 completed purchases per minute, but a popular event may create much higher demand. Its immediate concern is the workload level at which the service stops meeting its response-time and error-rate objectives, not whether it can survive a sudden traffic burst or run for many hours. The team already has a representative operational workload and a stable test environment. Which test is MOST appropriate to answer this question?

Correct Answer: D. A capacity test that progressively increases workload and observes when objectives are no longer met.
Explanation:

A capacity test determines the workload the system can sustain while satisfying its objectives and can reveal the point at which those objectives fail. A spike test focuses on a sudden change in load, while a soak test investigates behavior over time at a sustained level. A scalability test compares changes in capacity or performance as resources or system size change; that is not the company's immediate question.

Question 3

New Single answer

Topic: Recall testing types in performance testing.

Skill tested: Distinguishes a stress test from other performance test types by its purpose.

A payment platform has passed its planned peak-load test. The operations team now wants evidence about behavior when demand exceeds the forecast and the application begins to run out of capacity. The purpose is to reveal how the platform degrades, whether it fails safely, and what recovery looks like after pressure is removed. The team is not trying to estimate ordinary capacity or detect a gradual memory leak. Which test should be planned?

Correct Answer: B. A stress test that drives the system beyond expected operating conditions and examines failure and recovery.
Explanation:

The stated goal is to deliberately exceed expected conditions and study degradation, failure behavior, and recovery, which is the purpose of stress testing. A load test assesses behavior under specified operational load; it does not necessarily exceed capacity. A soak test targets long-duration effects such as resource leaks, while scalability testing examines how performance changes when system resources or size change.

Question 4

New Single answer

Topic: Understand the concept of load generation.

Skill tested: Selects a load-generation model that reproduces user-arrival behavior without coordinated omissions.

A travel site expects users to arrive independently, with each user beginning a search after a variable think time. The current test uses closed virtual users: each user waits for a response and then immediately starts the next search, so throughput falls as response times rise. The team must estimate how the service behaves when real arrivals continue during a slowdown. It has sufficient generator capacity and can configure either closed or arrival-rate-based workload generation. Which approach is MOST suitable?

Correct Answer: A. Use an arrival-rate-based model that schedules new searches independently of the previous request's completion.
Explanation:

An arrival-rate-based model can maintain the intended arrival pattern even when response times increase, making it appropriate when arrivals are independent of service completion. In a closed model, slower responses reduce the rate at which each user can issue work, potentially understating demand during degradation (the coordinated-omission problem). Simply adjusting user count does not remove that coupling; longer think time reduces demand, and a single batch does not represent continuing arrivals.

Question 5

New Multiple answers

Topic: Give examples of common failure modes of performance testing and their causes.

Skill tested: Diagnoses invalid load-test results caused by workload and environment setup failures.

A retailer's load test reports excellent response times at a workload far above its forecast, but the result conflicts with production observations. Review shows that the load generator reaches its CPU limit, requests reuse one authenticated account, and the test database contains only a small fraction of production's data volume. The production system also uses several application nodes, whereas the test ran on one node. Select TWO actions that would most directly improve the validity of a rerun. Select TWO answers.

Correct Answer: B. Add or resize load generators and monitor their resource utilization so they can generate the planned workload without becoming the bottleneck.; E. Use representative data volume and an appropriate distribution of user identities and sessions.
Explanation:

A saturated generator cannot reliably produce or measure the intended workload, so the team should provide adequate generator capacity and monitor it. A small database and a single reused identity can produce behavior unlike the production workload; representative data and user/session variation address those biases. Multiplying a single-node result assumes linear scaling without evidence. A longer test does not correct the generator or representativeness problems, and averages do not eliminate environment bias.

Question 6

New Single answer

Topic: Understand the typical metrics collected in performance testing.

Skill tested: Interprets percentile response time, throughput, and errors against service objectives.

During a checkout test, the team records 800 completed transactions per minute and an average response time of 1.1 seconds. The service objective requires the 95th-percentile response time to remain below 2 seconds at the specified workload, with fewer than 0.5% failed transactions. The report shows a 95th-percentile response time of 3.4 seconds and a failure rate of 0.2%. Stakeholders ask whether the test passed because the average is below the limit and the failure rate is acceptable. What is the best conclusion?

Correct Answer: D. The test failed the response-time objective even though throughput and failure rate may be acceptable.
Explanation:

Acceptance must be assessed against each stated objective. The 95th-percentile response time is 3.4 seconds, exceeding the 2-second limit, so the response-time objective fails. The average cannot substitute for the specified percentile because it can hide a slow tail. Throughput is validly expressed as completed transactions per unit time, and the percentile definition does not make excluded slow observations acceptable.

Question 7

New Multiple answers

Topic: Explain why results from performance testing are aggregated.

Skill tested: Uses appropriate aggregation to summarize variability while preserving important performance detail.

A service is tested in five separate runs at the same intended workload. Stakeholders need a concise comparison of runs, but the team also needs to identify whether a small group of requests experienced serious delays. The raw results contain thousands of response-time samples per run, and the distribution is right-skewed. The report must not let a single summary value conceal tail behavior or imply that all runs were identical. Select TWO reporting practices that best meet these needs. Select TWO answers.

Correct Answer: B. Report response-time percentiles, such as the 90th or 95th, alongside an appropriate central summary.; E. Report a suitable central summary for each run and include dispersion or range information to show variability.
Explanation:

Aggregation makes large result sets easier to compare and communicate, but it should preserve meaningful variation. A central summary per run with dispersion or range gives context about run-to-run behavior, while percentiles expose the slower tail that an average can conceal. Pooling everything can obscure differences among runs. A maximum is highly sensitive to an outlier and does not describe the distribution; choosing only the fastest run is not representative.

Question 8

New Single answer

Topic: Understand the key sources of performance metrics.

Skill tested: Combines client-side and infrastructure metrics to localize observed performance degradation.

An API performance test shows that the 95th-percentile response time rises sharply after the workload reaches its target. The application team sees no increase in reported application errors, and the test tool records successful requests. The environment includes a load generator, an application tier, and a database, but the current report contains only client response times. The team must determine whether the delay originates in the generator, application, or database before changing capacity. What is the MOST appropriate next step?

Correct Answer: A. Collect correlated resource and timing metrics from the load generator, application tier, and database during a repeatable run.
Explanation:

Client-side response time identifies that users are experiencing delay but does not locate its source. Correlated measurements from the generator, application, and database help distinguish generator saturation, application resource contention, database delay, or interactions among them. Adding nodes before locating the bottleneck can waste resources. Successful requests do not rule out slow processing, and throughput complements rather than replaces response-time data.

Question 9

New Single answer

Topic: Recall the typical results of a performance test.

Skill tested: Produces a performance-test outcome that communicates objectives, findings, and limitations.

A project sponsor requests a brief performance-test result for a release decision. The team has executed the planned workload and captured response-time percentiles, throughput, errors, and resource utilization. One run was invalid because the load generator restarted, while the remaining runs met the workload profile. The sponsor needs to understand both whether the objectives were met and how much confidence to place in the findings. Which report approach is MOST appropriate?

Correct Answer: D. Report the objectives and workload, summarize valid results against acceptance criteria, disclose the invalid run and its cause, and state relevant limitations.
Explanation:

A useful performance-test result connects the purpose and workload to measured outcomes, assesses them against objectives, and makes significant validity issues and limitations transparent. The generator restart means that run should not be treated as equivalent evidence, but omitting it without disclosure hides an important qualification. A best-run-only pass/fail can overstate confidence, while unprocessed raw data does not provide the interpretation needed for a release decision.

Question 10

New Multiple answers

Topic: Understand the principal performance testing activities.

Skill tested: Sequences test design, environment preparation, execution, analysis, and reporting activities.

A development team has approved performance objectives for a new customer portal, but the test environment has not yet been prepared. The planned workload reflects real user journeys and includes a peak period. The release date is fixed, and the team must avoid spending execution time on scripts that have not been checked against the objectives. Which TWO activities should be completed before the planned performance-test execution begins? Select TWO answers.

Correct Answer: B. Prepare and validate scripts against the agreed transactions, workload profile, and measurement requirements.; E. Prepare the environment and verify that monitoring and load-generation components are ready.
Explanation:

Before execution, the team should ensure that scripts implement the agreed user journeys and load profile, and that the test environment, monitoring, and generators are ready. These preparation steps reduce the risk of invalid execution and wasted test time. Running first and deciding objectives later reverses the proper planning sequence. A conclusions report requires results, and tuning production components is neither a preparation activity nor an appropriate substitute for controlled testing.

Question 11

New Single answer

Topic: Analyze a given project to determine the appropriate performance testing activities for each phase of the software lifecycle.

Skill tested: Selects lifecycle-appropriate performance activities before costly system integration.

A bank is building a new account service using short development iterations. The service is not yet integrated with its production-like environment, but its architecture review has identified synchronous calls to an external credit service and a shared database. The team can still influence the design, and late changes to these dependencies would be expensive. Which performance activity is MOST appropriate at this lifecycle stage?

Correct Answer: A. Review the architecture and design for performance risks, then define measurable objectives and early component-level checks.
Explanation:

Performance work should begin early. Architecture review can identify risks in synchronous dependencies and shared data resources while changes remain relatively inexpensive; objectives and component-level checks can then guide development before full integration. Waiting for end-to-end testing defers discovery. Sending simulated customer traffic to a production external service is inappropriate, and unit-test execution time alone cannot establish service-level performance.

Question 12

New Single answer

Topic: Derive performance test objectives from relevant information.

Skill tested: Converts operational and business evidence into measurable workload and acceptance objectives.

A regional delivery service is planning a performance test for a redesigned booking workflow. Business forecasts specify 60,000 bookings during the busiest hour, while operational data shows that 70% of bookings occur in the first 40 minutes of that hour. Customer support reports that slow confirmation pages generate complaints, but no response-time target has been approved. The test team must propose objectives without presenting an unapproved target as a committed requirement. What is the best course of action?

Correct Answer: D. Derive and document a representative time-varying workload from the evidence, and obtain stakeholder agreement on measurable response-time and error criteria.
Explanation:

The forecast and operational distribution support a realistic, non-uniform workload profile, while the reported customer impact indicates that response-time objectives are also needed. The team should propose measurable criteria and secure stakeholder agreement rather than silently inventing a commitment. Throughput alone does not establish acceptable user experience. A local best-case result is not representative, and an even distribution conflicts with the observed concentration of demand.