Limited-Time Offer: Enjoy 50% Savings! Coupon code: 50OFF Use it at checkout
Skip to content

Free Salesforce Energy and Utilities Cloud Accredited Professional Energy-and-Utilities-Cloud Exam Questions

Last updated: · 15 practice questions with answers and explanations

Page: 1 / 8 Total 75 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: Discovery

Skill tested: Elicits current-state journeys and distinguishes business outcomes from requested features.

A regional electric utility asks for a new digital move-in experience because customers abandon its current process. During discovery, stakeholders cite long handle times, repeated identity checks, and uncertainty about when service will begin. The project sponsor initially requests a web form, while contact-center leaders want fewer repeat calls. No baseline abandonment or service-start measures have been provided, and the existing process varies by service territory. What should the consultant do FIRST to establish a sound basis for solution design?

Correct Answer: D. Document and validate the current journeys, process variants, pain points, measures, and desired business outcomes with the affected stakeholders.
Explanation:

Discovery should establish how work actually occurs, who participates, where territory-specific variations arise, and what measurable outcomes matter. Validated journeys and baselines let the team assess whether standard Energy and Utilities Cloud capabilities fit and define meaningful future-state requirements. Building a flow before validating the process risks encoding inconsistent practices. Replacing the customer information system is an architectural conclusion unsupported by the symptoms. Industry benchmarks cannot substitute for the utility's own baseline or agreed targets.

Question 2

New Single answer

Topic: Discovery

Skill tested: Identifies fit gaps between business requirements and standard Energy and Utilities Cloud capabilities.

A water provider wants its agents to capture a customer's request to start service, select an eligible service product, collect required information, and submit the request for fulfillment. The provider also wants a separate approval when a customer requests a deposit waiver; that decision depends on a credit result returned by an external system. Stakeholders are unsure whether both needs require custom development. The implementation must keep the ordinary start-service journey maintainable and avoid embedding external credit decision logic in the sales flow. What is the MOST appropriate discovery outcome?

Correct Answer: C. Map the ordinary request to standard order-capture capabilities, then document the waiver decision and credit-system interaction as a distinct fit gap for solution design.
Explanation:

The ordinary service request aligns with the standard order-capture pattern: capture the request, choose an eligible offering, collect information, and submit it. The waiver requirement has a separate decision rule and an external data dependency, so discovery should document it as a fit gap rather than label the whole journey custom. Assuming an unconfigured external decision is available is unsupported. A manual field changes the business control and risks stale or inconsistent decisions.

Question 3

New Single answer

Topic: Solution Design

Skill tested: Maps utility business capabilities to the appropriate Energy and Utilities Cloud components.

An electric cooperative is designing a future-state process for residential service. Customers and agents must browse eligible offerings, configure a service request, review a price, and submit an order. After submission, operations must track fulfillment tasks and communicate the order's progress. The cooperative's legacy CIS remains the authoritative system for service points, billing accounts, and final service activation; it will not be replaced in this release. Which architecture direction BEST fits these requirements?

Correct Answer: B. Use Energy and Utilities Cloud order capture for the customer-facing request and integrate fulfillment and activation with the existing CIS, preserving its authority for operational records.
Explanation:

The design should use the Energy and Utilities Cloud capabilities suited to product selection and order capture while integrating downstream processes with the existing CIS. Keeping the CIS authoritative for service points, billing accounts, and activation respects the stated system boundary and avoids duplicating ownership. Moving operational authority into the sales process contradicts the constraint. A portal-only approach forfeits the requested order-capture capability, while dual authority creates synchronization and governance risks.

Question 4

New Multiple answers

Topic: Solution Design

Skill tested: Validates product catalog and price configuration for customer-specific order eligibility.

A utility sells residential electricity plans with different prices by service territory. Customers may select only plans eligible for their service address, and a seasonal discount applies only during a defined enrollment period. The design team must keep shared product definitions manageable and prevent agents from quoting a valid plan at the wrong territory's price. The sales channel will use Energy and Utilities Cloud order capture. Which TWO design decisions best address these requirements? Select two.

Correct Answer: A. Model the plans as products and represent the applicable selling prices with the catalog's pricing structures, including the territory and enrollment conditions required by the design.; E. Use eligibility rules informed by the service address and selected territory to restrict the plans available for the order.
Explanation:

Products and their applicable pricing structures should represent what is sold and at what price, while eligibility rules should constrain the choices offered based on the order context, such as service address or territory. Together these controls reduce invalid selections and misquotes. Territory-specific user ownership does not define commercial eligibility or pricing. Notes and manual subtraction are error-prone and do not enforce a price. Duplicating customer accounts creates unnecessary data-quality and identity problems.

Question 5

New Single answer

Topic: Solution Design

Skill tested: Defines system-of-record boundaries and integration responsibilities in the future-state architecture.

A gas provider will use Salesforce for customer engagement and order capture but retain its CIS as the authoritative source for billing accounts, meter reads, and bill production. Salesforce users need a current billing-status indicator when they discuss a customer's order. The CIS exposes an approved integration interface, and the provider prohibits Salesforce from becoming a second system of record for financial account data. Which design is MOST appropriate?

Correct Answer: C. Define the CIS as the source of truth, expose only the required billing-status information to Salesforce through the approved integration, and specify ownership and synchronization behavior.
Explanation:

The architecture should respect the CIS's authoritative ownership while making the minimum necessary information available to the Salesforce process through the approved integration. Explicit ownership and synchronization rules reduce conflicting updates and clarify how users see current status. Allowing edits in both systems violates the stated boundary. Reimplementing billing logic risks divergence from the authoritative calculation, and the system-of-record constraint does not prohibit controlled access to relevant information.

Question 6

New Multiple answers

Topic: Solution Design

Skill tested: Designs least-privilege Salesforce access for sensitive utility customer and order data.

A utility will deploy Energy and Utilities Cloud to contact-center agents, field-service coordinators, and supervisors. Agents need access to customer and order records in their assigned service region, while field coordinators need operational details only for orders they support. Supervisors require visibility across their teams, but no role should receive broad access to sensitive records without a business need. The organization wants the design to remain manageable as users and regions grow. Which TWO design decisions are most appropriate? Select two.

Correct Answer: C. Use profiles or permission sets to grant the object and field permissions required for each job function, and use record-sharing design to control access to records by role and business need.; D. Design role hierarchy and appropriate sharing mechanisms around team and regional access, then validate access with representative user personas.
Explanation:

Least privilege requires both permission design at the object and field level and record-level sharing that reflects regions, teams, and supervisory responsibilities. Testing with representative personas confirms that the design grants needed access without excess access. View All Data defeats the security requirement. Shared logins undermine individual accountability and authorization. Informal messages do not provide a secure, auditable substitute for appropriately scoped operational access.

Question 7

New Single answer

Topic: Solution Design

Skill tested: Selects appropriate Salesforce deployment tools and practices for controlled configuration promotion.

A partner is implementing a utility solution with Salesforce metadata and Energy and Utilities Cloud industry configuration. The customer has separate development, test, and production environments, requires peer review, and wants repeatable promotion rather than manual production edits. The team must also account for configuration that may not be represented solely as ordinary Salesforce metadata. Which deployment approach is BEST?

Correct Answer: C. Promote changes from development through test using a controlled, versioned deployment process, selecting tools and packaging methods appropriate to both Salesforce metadata and industry configuration, then validate in each target environment.
Explanation:

A controlled promotion path supports peer review, repeatability, and validation before production. The team must identify which components are deployable through standard Salesforce metadata mechanisms and which industry configuration needs the appropriate supported deployment method; assuming one mechanism covers everything is unsafe. Direct production changes reduce traceability and increase risk. Rebuilding independently causes environment drift and makes defects difficult to reproduce.

Question 8

New Single answer

Topic: Implementation

Skill tested: Completes initial Salesforce and Energy and Utilities Cloud setup before configuring business processes.

A newly provisioned Salesforce org is intended for an Energy and Utilities Cloud implementation. The project team can access the org, but utility-specific users do not see the expected functionality. The customer has purchased the relevant licenses, and the implementation plan requires controlled setup before business configuration begins. What is the BEST next step?

Correct Answer: D. Verify the applicable product licenses and org provisioning, enable the required Energy and Utilities Cloud functionality, and assign the appropriate access before configuring the solution.
Explanation:

Initial setup depends on the org being provisioned for the required product capabilities and on users receiving the applicable licenses and permissions. The team should verify those prerequisites and enable the required functionality before designing or configuring business processes. Custom objects do not replace product setup. Administrator access is not a substitute for licensing or a secure access model, and data imports do not activate product functionality.

Question 9

New Single answer

Topic: Implementation

Skill tested: Configures product and price data to support valid utility order capture.

A utility's catalog contains fixed-rate and variable-rate electricity plans. The business has approved prices and eligibility by territory, but agents currently see plans that cannot be sold at a customer's service address. The utility needs agents to capture both the selected product and requested quantity in Energy and Utilities Cloud, with no manual price calculations. Which implementation action is MOST appropriate?

Correct Answer: A. Configure the product catalog and applicable price entries, then configure order-capture eligibility and quantity behavior to reflect the approved selling rules.
Explanation:

Order capture should use configured products, applicable prices, and eligibility behavior so users can select only offerings valid for the customer context and record the required quantity. This directly addresses the mis-selling and manual-calculation risks. Free text and spreadsheets do not enforce catalog or price rules. Profiles control user access, not customer-specific product prices, and an unrestricted total permits inconsistent orders.

Question 10

New Multiple answers

Topic: Implementation

Skill tested: Sets up order capture to collect product, price, and quantity under eligibility rules.

A municipal utility is implementing an agent-assisted connection request. Agents must select a service offering, see its configured price, enter a requested quantity where applicable, and submit only offerings permitted for the customer's service location. The utility has already approved its products and prices. It wants the capture process to guide agents rather than rely on undocumented policy or manual calculations. Which TWO implementation actions are most appropriate? Select two.

Correct Answer: A. Configure eligibility conditions for the service location and relevant order context so unavailable offerings are not selectable.; C. Configure the order-capture experience to use the approved catalog and pricing, and capture the required product and quantity information.
Explanation:

The capture process must use the approved catalog and pricing while recording the order's product and applicable quantity. Eligibility conditions should constrain offerings using the service location and relevant context, preventing invalid orders at entry rather than relying on downstream rejection. Making all products selectable shifts errors to fulfillment. Free-text pricing undermines approved prices and validation. Record ownership is not a product-eligibility mechanism.

Question 11

New Single answer

Topic: Implementation

Skill tested: Implements contract management using the customer's approved contract lifecycle requirements.

A utility sells commercial energy agreements with negotiated terms. The business needs Salesforce users to create and manage agreement records associated with the relevant customer and sales activity, while retaining its legal team's existing process for final review and signature. The implementation team must enable the appropriate Energy and Utilities Cloud capability without asserting that the product replaces the legal process. What should the team do?

Correct Answer: C. Enable and configure the applicable contract-management capability to support the required agreement lifecycle in Salesforce, and integrate or hand off to the legal process at the agreed stage.
Explanation:

The implementation should enable the appropriate contract-management capability and configure it to support the customer's defined agreement lifecycle, including the boundary with legal review and signature. This respects both Salesforce process needs and the existing legal control. Notes and opportunity stages do not provide an adequate agreement record or lifecycle. Nothing in the requirement justifies replacing legal review or building custom objects before assessing standard fit.

Question 12

New Single answer

Topic: Implementation

Skill tested: Plans utility data migration with source mapping, cleansing, sequencing, and reconciliation.

A utility is migrating customers, service accounts, service points, and open orders from a legacy platform into Salesforce. The source contains duplicate customer identities and inconsistent service-point identifiers. The business requires agents to find the correct customer and see related active orders on launch day, and migration must be auditable. Which migration plan is MOST appropriate?

Correct Answer: D. Define source-to-target mappings and identifiers, cleanse and de-duplicate data, load records in dependency-aware order, and reconcile counts and relationships before business sign-off.
Explanation:

A reliable migration starts with mappings and stable identifiers, addresses data quality, and respects dependencies among customers, service accounts, service points, and orders. Reconciliation verifies that records and relationships migrated as expected, while business sign-off provides an auditable acceptance point. Loading unclean data burdens agents and compounds identity problems. Discarding active operational records breaks continuity, and orders should not be used to infer authoritative customer relationships from descriptions.

Question 13

New Multiple answers

Topic: Implementation

Skill tested: Enables post-sales processes while preserving clear order and fulfillment ownership.

After a customer submits a utility service order, a provider needs to track fulfillment progress, assign operational follow-up, and keep customer-service agents informed. The existing CIS remains authoritative for final activation, while Salesforce is expected to support post-sales visibility and coordination. The provider does not want users to mark an order complete merely because it was submitted. Which TWO implementation decisions best satisfy the requirement? Select two.

Correct Answer: A. Configure the post-sales process to track the appropriate order progress and follow-up in Salesforce, with status transitions aligned to agreed business events.; D. Define how fulfillment and activation events from the authoritative CIS update or inform Salesforce order visibility, with ownership and exception handling specified.
Explanation:

Post-sales implementation should provide useful order progress and operational follow-up while distinguishing submission from fulfillment and activation. Aligning Salesforce statuses to business events and defining the CIS-to-Salesforce status interaction preserves the CIS's authority and gives agents dependable visibility. Closing the order on submission misrepresents activation. Unrestricted status edits undermine process integrity, while abandoning tracking fails the stated customer-service requirement.

Question 14

New Single answer

Topic: Test and Deploy Energy and Utilities Cloud Applications and Solutions

Skill tested: Builds UAT scenarios that validate end-to-end utility order requirements and business outcomes.

A utility is preparing user acceptance testing for a new move-in process. The requirement is that an agent can identify a customer, select an offering valid for the service address, capture required information, submit the order, and see the expected downstream status. Executives also want evidence that the process reduces avoidable rework, but the team has limited UAT time. What is the BEST test approach?

Correct Answer: D. Create requirement-traceable scenarios with representative valid and invalid addresses, products, data, and downstream responses; define expected results and capture process-outcome measures.
Explanation:

UAT should verify the complete business requirement, including eligibility, required information, order submission, and the downstream status users rely on. Representative negative cases reveal whether invalid combinations are prevented, while expected results make defects actionable. Outcome measures connect acceptance to the business goal of reducing rework. A single happy path is too narrow, integration-only testing omits the user process, and unstructured exploration provides weak coverage and evidence.

Question 15

New Single answer

Topic: Test and Deploy Energy and Utilities Cloud Applications and Solutions

Skill tested: Plans coordinated Salesforce and industry-configuration deployments with environment validation.

A partner has completed configuration and testing for a release containing Salesforce metadata and Energy and Utilities Cloud industry configuration. The customer has a production freeze outside an approved deployment window and requires business sign-off before release. A recent test deployment revealed environment-specific integration settings. Which deployment plan is MOST appropriate?

Correct Answer: D. Promote the release through the designated test environment using appropriate deployment methods for each component type, validate environment-specific settings and end-to-end behavior, obtain sign-off, and deploy during the approved window with a rollback plan.
Explanation:

A controlled release validates the actual deployment route, handles industry configuration with an appropriate method, and checks environment-specific settings before production. Business sign-off, the approved window, and a rollback plan address the customer's governance and operational constraints. Testing with live orders is unsafe. Replacing production with a test-org copy is not a controlled component deployment and risks overwriting production data. Omitting industry configuration or relying on unplanned manual changes creates an incomplete release.