Question 1

New Single answer

Topic: Plan the Solution

Skill tested: Translate campus discovery findings into a complete low-level implementation checklist.

A regional office is replacing its access layer and adding wireless coverage. The existing network has two user VLANs, a voice VLAN, centrally managed access switches, and APs connected to switch ports. During discovery, the deployment technician finds that the network diagram does not identify the DHCP scope for the new wireless client subnet, the uplink trunk's allowed VLANs, or the switch management addressing method. The cutover window is fixed, and the team cannot make design decisions onsite. Which action best prepares the low-level design for implementation?

Correct Answer: B. Record the discovered gaps as explicit design decisions, confirm them with the network owner, and document VLAN/subnet, DHCP, trunk, management, and AP-port requirements before the change.
Explanation:

A usable low-level design resolves dependencies that otherwise force unplanned decisions during a constrained cutover. It should identify the VLAN and subnet plan, DHCP responsibility, trunk VLAN membership, management addressing, and AP port requirements, with unresolved items confirmed by the network owner. Reusing a subnet or permitting every VLAN assumes design authority and can create security or addressing problems. Capturing only topology leaves required configuration unknown, while postponing wired dependencies overlooks the fact that AP management and client traffic depend on correct switchport and network services.

Question 2

New Multiple answers

Topic: Plan the Solution

Skill tested: Identify discovery evidence needed to design access-layer VLAN and uplink changes.

A warehouse expansion will add access switches and APs to a campus where the core and DHCP service are owned by a separate team. The implementation team must produce a low-level design that can be approved before hardware arrives. Existing documentation is several years old, and the warehouse has a mix of tagged and untagged endpoint connections. Which TWO information-gathering actions most directly reduce the risk of a design that cannot be implemented as approved? Select TWO.

Correct Answer: C. Collect current switch configurations and verify VLAN, trunk, native/untagged, and uplink details against the physical topology.; D. Confirm with the core/DHCP owners the proposed VLAN-to-subnet mapping, gateway, DHCP scope or relay arrangement, and required uplink carriage.
Explanation:

The design depends on both the actual access-layer forwarding configuration and the services provided upstream. Validating live switch and topology details reveals which VLANs are tagged or untagged and what the uplinks carry. Confirming the VLAN, gateway, and DHCP arrangement with the responsible team prevents a design that has no working client addressing path. Assuming trunk behavior or inventing a VLAN can conflict with the core configuration. RF planning without site and AP information is premature, and unilateral subnet changes bypass required ownership and coordination.

Question 3

New Single answer

Topic: Configure the Solution

Skill tested: Provision an access switch with approved management connectivity and VLAN settings.

A technician installs a replacement Aruba access switch at a branch. The approved implementation record specifies a management VLAN with a reserved address, a user VLAN, a voice VLAN, and an uplink to an existing distribution switch. The site uses a management platform to provision devices, but the switch is not yet reachable from that platform. The change window permits local console access, and the technician must avoid disrupting the existing distribution configuration. What is the best initial provisioning approach?

Correct Answer: A. Use console access to apply the approved management addressing and required VLAN/port settings, verify reachability and credentials, then complete platform onboarding without changing the distribution switch.
Explanation:

Local console access provides a controlled path to apply the approved initial configuration when the switch is not yet reachable through the management network. Correct management addressing and required VLAN and port settings must be in place before validating platform connectivity and completing onboarding. An arbitrary address or unrestricted trunk is not aligned with the approved design. Automatic discovery does not guarantee that VLANs or addressing will be created, and management access should not be assumed to work over the user VLAN.

Question 4

New Multiple answers

Topic: Configure the Solution

Skill tested: Validate AP onboarding prerequisites and distinguish management reachability from client service.

A new AP is connected to an access switch and appears powered, but it does not become manageable in the organization's Aruba management environment. The deployment uses an existing management VLAN and a separate client VLAN; the AP is expected to obtain its management address through DHCP. The technician has console access to the switch but cannot alter the upstream DHCP server during this visit. Which TWO checks should be performed first to isolate basic onboarding prerequisites? Select TWO.

Correct Answer: B. Verify that the AP switchport supplies the required power and places AP management traffic in the intended VLAN.; D. Verify that the AP receives a valid management address and can reach the required management or discovery service through the configured network path.
Explanation:

An AP must first have power and a correctly connected wired management path. The technician should verify PoE and the port's intended VLAN behavior, then confirm that the AP actually obtains usable management addressing and can reach the relevant management or discovery service. Changing the SSID cannot repair wired AP onboarding. Wireless beacons do not assign a wired management VLAN, and an address from the client subnet would not substitute for the approved management network.

Question 5

New Single answer

Topic: Configure the Solution

Skill tested: Validate switch management access independently from end-user VLAN connectivity.

After onboarding a switch, a technician can ping its management address from a laptop connected to the same management subnet, but the approved central management platform cannot establish a session. The switch configuration shows the correct address and mask, and no user traffic is affected. The deployment checklist requires management access to work from the platform's routed location, while the technician has no authorization to change firewall policy. What should the technician do next?

Correct Answer: A. Check the switch's default gateway and end-to-end routing/reachability toward the platform, then provide any required path or policy findings to the network owner.
Explanation:

A same-subnet ping proves only local reachability; it does not establish that the switch can return traffic to a routed management platform or that the end-to-end path permits the management session. Checking the default gateway and the routed path is the appropriate next diagnostic step, with policy changes left to the authorized owner. Moving management into the user VLAN violates the design, a reset is unsupported by the evidence, and disabling authentication introduces unnecessary security risk.

Question 6

New Single answer

Topic: Configure the Solution

Skill tested: Confirm AP wired VLAN and client VLAN forwarding prerequisites during deployment.

A branch AP is manageable and advertises the required SSID, but wireless clients fail to obtain an address. The SSID is configured for a client VLAN that is already approved and has a working DHCP scope at the site gateway. The AP management interface is reachable, and nearby wired clients in the client VLAN receive addresses. The switchport serving the AP was copied from a port template intended for an untagged single-VLAN device. What is the most appropriate corrective action?

Correct Answer: A. Verify and correct the AP switchport so the management and client VLAN traffic are carried according to the AP's configured forwarding mode.
Explanation:

The working DHCP scope and wired client test indicate that the upstream client VLAN service is available. The AP port template, however, supports only an untagged single VLAN and may not carry the AP's management and client traffic as designed. Correcting the switchport to match the AP forwarding mode addresses that discrepancy. Changing DHCP subnetting or using management-subnet addresses would conflate distinct networks, and wireless security does not resolve a wired VLAN transport problem.

Question 7

New Single answer

Topic: Operate the Solution

Skill tested: Plan a managed switch firmware update with backup, compatibility, and rollback safeguards.

A managed access switch requires a firmware update to address a documented operational issue. The site serves voice handsets and APs, and the maintenance window is short. The team has not yet confirmed whether the target image is compatible with the current switch model or whether the saved configuration is current. The management system supports scheduling and status monitoring, but the technician must preserve service and be able to recover if the update fails. What is the best sequence?

Correct Answer: D. Verify the target image and device compatibility, save or capture the current configuration and relevant state, schedule the approved update in the window, then monitor reboot and post-update health.
Explanation:

A controlled firmware operation begins with validating that the image applies to the specific switch and that recovery information is available. Scheduling the change in the approved window limits disruption, and monitoring the reboot and post-update health verifies that the switch returned to service. Updating first and investigating compatibility afterward risks an avoidable outage. An unscheduled reboot violates the maintenance constraint, while simultaneous updates increase impact and reduce the ability to isolate a failure.

Question 8

New Multiple answers

Topic: Operate the Solution

Skill tested: Maintain an auditable change record and verify switch health after firmware maintenance.

A campus switch has completed an approved firmware update during a maintenance window. The switch is reachable again, and the change manager requires evidence that the upgrade succeeded and a record suitable for an audit. The technician must close the change without making unrelated configuration changes. Which TWO actions best meet these operational requirements? Select TWO.

Correct Answer: B. Confirm the running version and check management reachability and key access-port/uplink status against the pre-change baseline.; D. Record the device identity, previous and new software versions, change reference, time, operator, and outcome in the approved change record.
Explanation:

The audit trail should identify what changed, when, by whom, under which approved change, and with what result. Technical validation should confirm the running software version and check management and critical connectivity against the expected baseline. Removing the backup weakens recovery and evidence retention. Unrelated VLAN changes expand the change scope, and a single ping alone does not establish that uplinks and access services recovered correctly.

Question 9

New Single answer

Topic: Troubleshoot the Solution

Skill tested: Trace a wired client connectivity failure from physical link through VLAN and addressing.

A newly installed wired workstation cannot reach network resources. The switch reports the port as up, but the workstation shows no valid IPv4 address. Other workstations in the same user VLAN are functioning. The port was recently repatched from a phone-and-PC desk to a workstation-only desk, and the technician is authorized to inspect but not redesign the VLAN plan. What should the technician verify next to isolate the failure efficiently?

Correct Answer: D. Check that the switchport's access VLAN matches the workstation's intended user VLAN, then renew DHCP or inspect address acquisition.
Explanation:

With physical link established but no valid address, the next useful step is to verify the port's Layer 2 VLAN assignment and then test DHCP address acquisition on that VLAN. The recent repatching makes an incorrect access-port assignment plausible. DNS affects name resolution after IP configuration and cannot explain the lack of an address. An unrestricted trunk is not an appropriate workstation configuration, and firmware is not indicated by the available evidence.

Question 10

New Multiple answers

Topic: Troubleshoot the Solution

Skill tested: Separate physical, VLAN, DHCP, and gateway causes when diagnosing client reachability.

A laptop connects to a newly provisioned access port and receives an address from the expected subnet. It can ping its default gateway but cannot reach a server on another subnet. The port's link is stable, and users on nearby ports reach that server successfully. The technician needs to identify whether the fault is specific to this client's configuration or its access path before escalating. Which TWO checks provide the most useful next evidence? Select TWO.

Correct Answer: B. Compare the port VLAN and relevant access-port configuration with a known-working port serving the same client role.; E. Inspect the laptop's IP address, mask, default gateway, and route information for consistency with the approved subnet.
Explanation:

The successful gateway ping establishes basic local connectivity, but an incorrect mask or route on the laptop can still prevent correct off-subnet communication. Comparing the port's VLAN and configuration with a known-working peer also tests for a port-specific access-path difference. Assigning every VLAN is unsafe and obscures diagnosis. Replacing the switch is not justified by the evidence, and changing the server address is outside scope and could disrupt other users.

Question 11

New Single answer

Topic: Optimize the Solution

Skill tested: Establish comparable WLAN performance baselines before changing wireless settings.

A campus administrator reports intermittent slow WLAN performance in one office. The team wants to decide whether configuration changes are justified, but there are no reliable baseline measurements. The office has both busy and quiet periods, several APs, and a mixture of client types. The administrator requests an evidence-based comparison without interrupting service. What is the best first action?

Correct Answer: B. Collect representative measurements over busy and quiet periods, including client throughput or experience, channel utilization, retries, and signal conditions, then compare them with the current WLAN configuration and best practices.
Explanation:

A useful baseline captures conditions across representative load periods and includes both client experience and WLAN indicators such as utilization, retries, and signal quality. Comparing those observations with current settings and applicable best practices helps distinguish configuration issues from demand or RF conditions without disrupting service. Increasing power before measuring may worsen interference and cannot establish cause. Disabling a radio is an intrusive experiment, while replacing equipment without evidence is costly and unnecessary.