Free iSQI IREB Certified Professional for Requirements Engineering – Foundation Level IREB_CPRE_FL Exam Questions

Last updated: · 15 practice questions with answers and explanations

Page: 1 / 8 Total 45 questions

Want more questions? Get Premium Access.

Question 1

New Single answer

Topic: EU 1 Introduction and Foundations (L1)

Skill tested: Distinguishes functional, quality, and constraint requirements in a project scenario.

A logistics company is defining a replacement dispatch system. Workshop notes contain three statements: (1) the system shall calculate a delivery route from assigned stops; (2) a dispatcher shall be able to change an assigned route; and (3) the system shall display the updated route within two seconds for 95% of requests under the agreed peak load. The project lead plans to classify all three as functional requirements because each describes something users expect. Which classification is most appropriate?

Correct Answer: C. Statements 1 and 2 are functional requirements; statement 3 is a quality requirement.
Explanation:

Calculating a route and allowing a dispatcher to change it describe services or behavior the system must provide, so both are functional requirements. The response-time target, measured under a specified load, describes a performance quality rather than a particular service. Treating every statement about behavior as functional obscures the distinction between what the system does and how well it must do it. Statement 3 is not a constraint merely because it contains a measurable limit; it specifies a quality characteristic.

Question 2

New Single answer

Topic: EU 2 System and System Context (L2)

Skill tested: Applies system and context boundaries to distinguish external interfaces from system functions.

A city is procuring a parking-permit service. The proposed system includes an online application portal and a permit-processing service. It exchanges payment authorization with a bank, reads vehicle details from a government registry, and sends decisions to a city records system. Applicants, bank staff, and registry administrators interact with their own systems; the city's permit officers use the new service. The project team must define boundaries before eliciting interface requirements. Which approach best distinguishes the system boundary from the context boundary?

Correct Answer: C. Place the portal and permit-processing service inside the system boundary; identify external people, systems, and relevant processes or documents within the surrounding context.
Explanation:

The system boundary separates the system being developed from entities outside it. Here, the portal and permit-processing service are parts of the procured solution, while the bank, vehicle registry, and city records system remain external systems that belong in its context. Relevant people, processes, events, and documents can also form part of the context without becoming system components. Data exchange alone does not place an external system inside the solution boundary.

Question 3

New Multiple answers

Topic: EU 3 Requirements Elicitation (L2)

Skill tested: Selects elicitation techniques appropriate to stakeholder access and operational information needs.

A manufacturer is replacing a machine-maintenance scheduling application. Maintenance technicians work rotating shifts, so a single workshop would exclude some users. Existing maintenance logs and equipment manuals may reveal recurring needs, but the team also suspects that technicians use informal workarounds during breakdowns. There is little time for a broad series of individual interviews, and the team needs both coverage across shifts and evidence about actual work. Which TWO approaches best address these constraints? Select TWO.

Correct Answer: A. Run a structured survey for technicians across shifts, using questions informed by initial stakeholder and document analysis.; D. Observe selected maintenance activities, including breakdown handling, to identify work practices and hidden workarounds.
Explanation:

A structured survey can reach technicians across rotating shifts efficiently, while document-centered analysis of logs and manuals can help focus its questions. Observation provides evidence of actual work, including informal practices that stakeholders may not mention or that written procedures omit. Manuals alone cannot establish how work is performed or what users need. A single day-shift workshop risks excluding important stakeholder groups, and brainstorming with managers does not substitute for direct elicitation from users.

Question 4

New Single answer

Topic: EU 3 Requirements Elicitation (L2)

Skill tested: Uses Kano categories to interpret satisfaction effects and inform prioritization.

A product team is considering three features for a new household energy app. Users expect accurate monthly bills; without this, they become dissatisfied, while its presence is taken for granted. Faster historical-data loading increasingly improves satisfaction as response time improves. A personalized seasonal tip, when present, delights some users, but its absence does not cause dissatisfaction. The team wants to classify the features using the Kano model before discussing implementation order. Which classification is most appropriate?

Correct Answer: D. Accurate bills are must-be; faster loading is one-dimensional; seasonal tips are attractive.
Explanation:

A must-be feature is expected as a basic condition: its absence causes dissatisfaction, but its presence does not necessarily delight. Better performance on a one-dimensional feature generally increases satisfaction, which fits faster loading. An attractive feature can create delight when provided, while its absence is not normally a source of dissatisfaction. Kano classification describes the relationship between feature fulfillment and satisfaction; it does not by itself determine final priority or cost.

Question 5

New Single answer

Topic: EU 4 Requirements Documentation (L2)

Skill tested: Chooses complementary natural-language and model-based documentation for complex requirements.

A healthcare organization is documenting requirements for a referral-management system. Users need readable descriptions of business rules, while analysts must inspect hand-offs among clinics, laboratories, and the system without losing the distinction between internal functions and external participants. The procurement team also needs to trace each requirement to its source. A purely diagrammatic specification would be difficult for business stakeholders to review, while prose alone has already led to inconsistent interpretations of process flow. Which documentation approach is best?

Correct Answer: A. Combine concise, structured textual requirements with a suitable process model, and maintain source links for traceability.
Explanation:

A mixed form uses the strengths of complementary representations. Structured natural-language requirements support readable business rules and review, while a process model makes activities, sequencing, and hand-offs easier to inspect. Maintaining links to sources supports traceability without requiring every detail to be forced into one form. Prose alone may preserve ambiguity in process relationships, whereas a model alone can be difficult for some stakeholders to interpret and may not express all textual constraints effectively.

Question 6

New Single answer

Topic: EU 5 Documentation of Requirements using Natural Language (L2)

Skill tested: Reformulates stakeholder statements into clear, verifiable requirements using a template.

During a workshop, a product owner says, "We need the portal to be really quick when a customer submits a claim." The team knows customers submit claims from mobile and desktop browsers, but has not yet established a response-time threshold or a representative workload. The analyst must document the need without turning an unverified assumption into an approved commitment. What is the best next step when applying a requirements-template formulation process?

Correct Answer: B. Clarify the intended meaning and measurable conditions with relevant stakeholders, then formulate and validate a verifiable quality requirement.
Explanation:

The stakeholder's statement expresses a quality need, but "really quick" is not sufficiently precise or verifiable. The analyst should clarify the required response-time measure, operating conditions, and relevant workload before committing to a threshold. A template helps structure the requirement, but cannot supply missing stakeholder agreement or evidence. Preserving the vague wording does not improve quality, while inventing a threshold risks documenting an unsupported assumption. Claim submission is a function; speed is a quality characteristic.

Question 7

New Multiple answers

Topic: EU 6 Model-based Documentation of Requirements (L2)

Skill tested: Models goal refinement using AND and OR relationships in a goal tree.

A public library wants an online renewal service to reduce avoidable visits while ensuring that patrons can complete renewals when the service is available. The high-level goal is "Patrons can renew eligible loans remotely." Analysis identifies two necessary subgoals: "The patron is authenticated" and "The requested loan is eligible for renewal." For authentication, the organization is considering either its existing library credentials or a federated identity provider; either method is sufficient, and using both is not required. The analyst is constructing a goal tree. Which relationship structure represents these statements correctly? Select TWO.

Correct Answer: B. Decompose the high-level goal into authentication AND eligibility.; E. Decompose authentication into existing credentials OR federated identity.
Explanation:

Both authentication and eligibility are necessary for the stated renewal goal, so the goal requires an AND decomposition into those subgoals. The two authentication methods are alternatives, and either alone is sufficient, so authentication is refined with an OR relationship. Making the top-level goals alternatives would allow renewal without either authentication or eligibility. Requiring both identity methods would contradict the scenario, and eligibility is a separate condition rather than an authentication alternative.

Question 8

New Single answer

Topic: EU 6 Model-based Documentation of Requirements (L2)

Skill tested: Interprets use case relationships and actor boundaries for requirements modeling.

A customer-support platform supports "Submit support request." During that use case, the system must verify the customer's account status before accepting the request. An external identity service performs authentication, and that interaction occurs as a required part of every submission. The same authentication behavior is also used by "View request history." The modeling team wants the use case diagram to show reusable required behavior and keep external parties outside the system boundary. Which model is most appropriate?

Correct Answer: A. Model authentication as an included use case used by both customer use cases, and show the identity service as an external actor.
Explanation:

A required behavior shared by multiple use cases is appropriately represented as an included use case. The identity service is external to the platform and can be modeled as an actor because it interacts with the system, even though it is not a person. An extension is generally used for behavior that conditionally augments a base use case, but authentication is required here. Placing the identity service inside the system boundary or omitting it would hide an important external interaction.

Question 9

New Single answer

Topic: EU 7 Requirements validation and negotiation (L2)

Skill tested: Selects a validation technique suited to detecting defects through stakeholder perspectives.

A financial-services team has drafted requirements for an account-freeze feature. Compliance reviewers must confirm that regulatory obligations are represented, operations staff must check whether the requirements support incident handling, and developers must identify ambiguity and missing behavior. The requirements are stable enough for review, but building a prototype would be costly and would not demonstrate the operational process. The team wants a structured validation activity that examines the same specification from different stakeholder viewpoints. What should it do?

Correct Answer: B. Conduct a perspective-based reading in which reviewers use defined viewpoints and check for relevant defect types.
Explanation:

Perspective-based reading structures review around the concerns of different roles, helping reviewers detect defects that may be visible only from compliance, operations, or development viewpoints. It directly fits the need to validate a stable requirements specification without the cost of a prototype. A visual prototype may reveal interface issues but would not adequately assess regulatory completeness or operational requirements. An informal single-person opinion lacks the requested breadth, and a formatting-only checklist does not validate requirement content.

Question 10

New Single answer

Topic: EU 7 Requirements validation and negotiation (L2)

Skill tested: Identifies and resolves conflicting requirements through explicit stakeholder negotiation.

A warehouse rollout has two approved stakeholder statements. The security lead requires that a user's access be suspended immediately when employment ends. The site manager requires that all shift supervisors retain access through the end of their scheduled shift, even if their employment ends earlier. Both requirements concern the same account and cannot be satisfied simultaneously in that case. The release team proposes implementing the security lead's requirement silently, arguing that it is safer. What is the best requirements-engineering response before baselining the specification?

Correct Answer: C. Record the conflict, bring the responsible stakeholders together, clarify the underlying goals and constraints, and agree and document a resolution.
Explanation:

The statements are incompatible for a specific situation, so the team should make the conflict visible and negotiate a resolution with the relevant stakeholders before establishing the baseline. Clarifying goals and constraints may reveal an acceptable rule, such as an approved exception or a different account-handling process, but the analyst should not invent that outcome. Leaving the conflict to developers transfers a business decision to implementation. Silently deleting a requirement or averaging times has no agreed rationale and may violate stakeholder needs.

Question 11

New Multiple answers

Topic: EU 8 Requirements Management (L2)

Skill tested: Uses traceability relationships to assess the impact of a proposed requirement change.

A transport authority is preparing a controlled release of a scheduling system. A proposed change alters the meaning of requirement R-42, which is linked to a regulator's rule, a design element, two acceptance tests, and a user manual section. The team must determine what needs review and preserve the ability to demonstrate why the requirement exists and what depends on it. The requirements repository supports explicit links and version history. Which TWO actions best support impact analysis and controlled change? Select TWO.

Correct Answer: C. Create a new version of R-42 and retain its traceability relationships and change rationale.; D. Follow the links from R-42 to its source and dependent design, test, and documentation artifacts, then assess affected items.
Explanation:

Traceability links support impact analysis in both directions: the team can inspect the source that justifies R-42 and identify dependent design, tests, and documentation that may need changes or revalidation. Creating a new version preserves the history of how the requirement changed and its rationale while retaining relevant relationships. Overwriting destroys useful history. Ownership by other teams does not remove their artifacts from impact analysis, and a baseline should not be updated before the change is assessed and controlled.

Question 12

New Single answer

Topic: EU 8 Requirements Management (L2)

Skill tested: Prioritizes requirements using value, risk, and implementation effort under release constraints.

A small team can deliver only three of four candidate requirements in its next release. The stakeholders agree that all four are desirable, but provide these estimates: R1 prevents a frequently occurring, costly service failure and needs moderate effort; R2 adds a rarely used convenience feature and needs low effort; R3 satisfies a legal obligation that takes effect before the next release and needs moderate effort; R4 improves an already acceptable report and needs high effort. The team has not assigned numeric scores and must make a defensible release decision with stakeholders. Which approach is best?

Correct Answer: D. Use a transparent prioritization method that considers value, urgency or risk, and effort, then negotiate the release set with stakeholders.
Explanation:

A defensible prioritization decision considers more than effort: the legal obligation has a time-critical constraint, preventing a costly recurring failure may have high value, and effort affects feasibility. A transparent method helps stakeholders compare these dimensions and agree which three fit the release. Choosing only low-effort items ignores value and compliance. Request order and popularity are not reliable substitutes for assessing urgency, risk, benefit, and cost, particularly when a legal deadline is explicit.

Question 13

New Single answer

Topic: EU 9 Tool Support (L1)

Skill tested: Evaluates requirements-management tool adoption across process, people, and tool capabilities.

An engineering group plans to replace shared documents with a requirements-management tool. The proposed tool supports versioning, attributes, links, and filtered views, but the organization has not agreed how requirements will be approved, who will maintain them, or how existing identifiers and history will be migrated. Managers expect the tool itself to resolve inconsistent practices. The rollout must improve control without disrupting an active project. What should the organization do first?

Correct Answer: D. Define the intended RE process, roles, and migration approach, then select and introduce tool support that fits those needs.
Explanation:

A requirements tool supports a requirements-engineering process; it does not establish responsibilities, approval rules, or consistent practices by itself. The organization should clarify process and roles, address migration and continuity, and then configure tool capabilities to support those needs. Immediate migration risks losing identifiers, history, or project continuity. Disabling core management features defeats the intended control, while unrestricted team-specific workflows can perpetuate the inconsistency the change is meant to address.

Question 14

New Multiple answers

Topic: EU 1 Introduction and Foundations (L1)

Skill tested: Selects requirements-engineering improvements that address communication and quality risks.

A software supplier repeatedly discovers late changes because users say the delivered system is not what they expected. Interviews are conducted, but notes are scattered across email and no one confirms their interpretation. The project manager proposes adding more developer testing to catch the problem earlier. The team needs to improve requirements engineering while keeping the existing delivery schedule and ensuring business stakeholders can verify what they agreed. Which TWO actions most directly address the underlying requirements risks? Select TWO.

Correct Answer: D. Document agreed requirements in a controlled, reviewable form and validate them with relevant stakeholders.; E. Establish regular communication and feedback with stakeholders to clarify and confirm interpretations.
Explanation:

Late misunderstandings commonly arise when elicited information is not communicated, documented, and validated with the people whose needs it represents. Regular feedback helps expose differing interpretations early; controlled documentation gives stakeholders a shared basis for review and agreement. Additional software testing can find implementation defects, but it cannot reliably determine whether the system reflects the intended need. Restricting communication or postponing documentation removes opportunities to detect and resolve misunderstandings before they become expensive changes.

Question 15

New Single answer

Topic: EU 4 Requirements Documentation (L2)

Skill tested: Applies quality criteria to identify ambiguity and improve requirement verifiability.

A municipal procurement specification contains the statement: "The case-management system shall quickly notify the appropriate staff member when an important case is received." Vendors interpret "quickly," "appropriate," and "important" differently. The procurement officer wants to retain the business intent while enabling comparable bids and later acceptance testing. Which revision is the best requirements-engineering response?

Correct Answer: D. Replace the adjectives with agreed, measurable notification timing, explicit case classification rules, and a defined recipient-selection rule.
Explanation:

The statement is ambiguous and difficult to verify because key terms lack agreed meanings. The requirement should preserve the intent while specifying how cases are classified, who qualifies as the recipient, and what measurable timing applies under stated conditions. Merely splitting the sentence does not resolve ambiguity. Asking suppliers to use judgment makes bids incomparable and acceptance subjective. A diagram can complement textual requirements, but it does not automatically define these business rules or eliminate vague terms.